Health and safety concerns everyone. When problems are detected, relevant departments will give notice. A notice generally consists of four parts: title, sender (recipient), text and signature. So how can I write a good notice? The following are the health and safety precautions I have compiled, and you are welcome to check them.

Health and safety notice 1

Construction unit:

Upon inspection, the following potential safety hazards are found:

1, the cantilever length of I-beam outside the cantilever frame is not enough, the erection of corner part is not standardized, and there are too many cantilever layers, so a special scheme needs to be formulated.

2. The mechanical equipment has not been put on record for property rights and registered for use, and the operators operate without a license. The inlet needs to be protected.

3. Limb protection is not in place.

4. The construction electricity is not matched according to the specification requirements.

5. It is forbidden for migrant workers to live in uncompleted residential flats on the construction site.

Your company is now ordered to make rectification according to 1.2.3:

1, complete the rectification before June 7 10, and report the rectification of hidden dangers in production safety to our station.

2, immediate rectification, rectification period shall not continue to construction, equipment shall not continue to use.

3. During the rectification, on-site supervisors shall conduct on-site supervision and conduct re-inspection.

Construction unit (signature):

Safety supervisor (signature):

202 x 65438+ 10 month 15

Supervision unit (signature):

Health and Safety Notice Chapter II

_ _ Forest Station:

In the first ten days of January, our company accepted the logging subcategories of artificial commercial forests within the jurisdiction of your station for 20 years. The problems found in the verification and the rectification requirements are hereby notified as follows:

I. Existing problems

1, the cutting design is inaccurate, and the picture and text are inconsistent. _ _ location, after investigation, the small classes are close to each other, but the design drawings are sketched and shifted;

2. There is deforestation. For example _ _ question

3. Ultra-dense cutting of partial selective cutting subclasses;

4. Most of the timber has not been cleared and returned to the pile, and the management of cutting area is chaotic;

The task of afforestation has not been completed.

Second, the rectification requirements

In view of the above problems, your station must carry out rectification from the following aspects:

1. For logging sub-classes with serious design problems, according to the field situation, instruct them to complete supplementary design within a time limit for future reference;

2, the phenomenon of deforestation, undocumented logging should be investigated and dealt with according to law;

3, all involved in small class ultra-strength and ultra-limit logging, instructed logging owners to replant small class ultra-strength logging within a time limit. If necessary, a deposit can be collected to ensure the smooth completion of replanting and planting;

4. Instruct the logging owner to clean up the logging site within a time limit. For the owners and manufacturers who can't finish the clearing work of the logging site on time as required, no logging plan will be arranged this year;

5. For logging sub-classes that have not completed the task of land renewal, you should take active measures to instruct the owners to complete the task of land renewal and afforestation this winter.

Please report the rectification to our bureau before the end of the year.

I hereby inform you.

date month year

Article 3 of the Health and Safety Notice

Fujian Yongrun Construction Engineering Co., Ltd.:

Judging from this month's assessment and daily inspection records, the daily cleaning is generally good, but there are still many places where health loopholes often appear. The following rectification contents are put forward, please rectify them.

1, around the entrance building, parking lot, leisure fitness square, flower beds, kerbs and pavement soil along the main park of children's playground should be cleaned immediately.

2. In the temporary lounge next to the entrance building, the accumulated garbage should be removed in time to keep the ground clean.

3. Other non-garbage objects such as pebbles, bricks, wooden bamboo poles and other residues on the roadside and the green belt in the trusteeship area should be cleaned up in time.

4, leisure fitness square and children's playground on both sides of the main garden road to use tools to make mud sedimentation tank, and regularly clean the sedimentation tank, to prevent soil pollution when watering the greenway.

5. The tool room will be delivered soon. Please configure all kinds of tools, vehicles and articles according to the contract.

6. In order to improve the cleaning quality and efficiency, and establish the image of the cleaning team in the West Lake area of the park, the cleaning staff are required to be equipped with a cleaning car, and the corresponding tools are stored in the cleaning car in a unified way to avoid wasting manpower and time in fetching tools back and forth.

Please implement the above rectification immediately, and conduct a month-end assessment in combination with this rectification.

Hereby inform!

Zhangzhou chengtou property management co., ltd

date month year

Health and Safety Notice Chapter 4

Issued by:

Construction team:

Your company has violated the Regulations on the Administration of Safe Production and Construction and the provisions of relevant documents on safe production, and now you are notified to make rectification within a time limit.

Rectification content:

1, carpenters, steel workers, etc. Connect the power cord illegally, and wire before leaving the board.

2. The site and yard are full of reinforced materials (finished products and waste materials), which are not finished, cleared and expected according to the requirements of safe and civilized construction.

3. The woodworking machinery failed to install the safety baffle according to the regulations, and the garbage on the chainsaw site (especially around the chainsaw) was not cleaned up in time, which caused great safety hazards.

4. The position of the bending machine is incorrect, which hinders walking.

Time limit for rectification: complete the rectification within 3 days.

Signed by:

Date of issuance: X, 2002.

Health and Safety Notice Chapter 5

Limited company:

Our bureau organized and invited experts to conduct a comprehensive safety inspection of your company from June 24th to 25th.

After inspection, we have formed an expert opinion on the problems existing in your company's Summary of Safety Inspection Site of Jinjiang Gas Enterprises (hereinafter referred to as the Summary). The summary has been sent to your company. Please rectify the existing problems one by one, and report the rectification to our bureau before June 30, 20__, and explain the specific reasons for those that are difficult to rectify at the moment.

Attachment: Summary of Problems Existing in Safety Inspection Site of Jinjiang Gas Enterprise

Jinjiang garden bureau

20zz May 3 1

Article 6 of the Health and Safety Notice

Unit name:

In order to eliminate potential safety hazards in time, prevent the occurrence of safety technical accidents and ensure the normal operation of enterprises and the production safety of employees. According to the relevant safety regulations, the company's risk analysis team found the following safety hazards during the safety inspection of 202x, xx and xx, and issued a notice of rectification of the hazards to your unit. After receiving this notice, it is necessary to carry out rectification and formulate corresponding rectification measures.

Fill in the "report on rectification of potential safety hazards" and report it to our department on 202x, xx and xx. Our department will conduct re-inspection, and fill in the Re-inspection Result Evaluation Book for filing after passing the re-inspection. Those who fail to make rectification within the time limit will be punished according to the relevant regulations of the company.

Safety hazards rectification content:

Person in charge of rectification unit (signature):

Safety Supervision Manager (signature):

Security Section (Seal):

Date of issuance: X, 2002.

Health and Safety Notice Chapter 7

Company name: _ _ _ _ _ _ _ _ _ Address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Nature of use: _ _ _ _ _ _ _ Building area and number of floors: _ _ _ _ _ _ _

According to the spirit of the "Fire Fighting" campaign document of the Ministry of Public Security, on _ _ _ _ _ _ _ _ _

□ 1 ,□ No fire design audit, □ Fire acceptance, □ Spot check for record, □ Not put into use, fire safety inspection before operation;

□2. The color steel plate building is built with polystyrene as interlayer material;

□3. Production, operation and personnel accommodation are not separated by fire, □ staff quarters are set up illegally, □ fire and electricity are used illegally;

-4. Fire control facilities, equipment and fire safety signs are not kept intact and effective;

□5. Stop using or dismantle fire control facilities and equipment without authorization;

□6, □ occupy, □ block, □ close evacuation routes and safety exits;

□7. Occupy, block, and close the fire truck passage;

□8. Other violations of fire safety:

Person in charge of the inspected unit (signature): _ _ _ _ _ _ _

Tel: _ _ _ _ _ _ _ _

Safety inspector (signature): _ _ _ _ _ _

2 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Health and safety notice 8

_ Gong Xiaochong's promise. _

_____________________:

According to the Fire Prevention Law of People's Republic of China (PRC), our bureau (bureau, department, division, detachment and brigade) sent personnel to conduct fire supervision and inspection on your unit on, and found the following major fire hazards: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. Those who fail to make corrections within the time limit will be punished according to law.

During this period, your unit should take measures to ensure fire safety and prevent fire.

(Seal of public security fire control institution)

Date, month, 20

Person in charge of the inspected unit (signature):

Date, month, 20

Two copies (one for the inspected unit and one for the public security fire control institution).

Article 9 of the Health and Safety Notice

Teahouse contractor:

In order to prepare for the reception of tourists during the Spring Festival in February 12, we conducted a general health inspection in all areas of the villa, and found that the overall health work in your place needs to be further improved. In order to better meet the reception of the Spring Festival Golden Week service in February and the inspection of the relevant health administrative departments, please cooperate with the pre-holiday health work and timely rectify the following health conditions:

1. Clean the cobwebs on the top of the doorway and the ceiling of the corridor.

2, tidy up the cleaning tools under the stairs, reasonable place in the workshop.

Please clean the door glass, tea room window glass and window sill.

4. Keep the guest service area clean and tidy.

Thank you for your cooperation!