1 After the completion of the project, the construction enterprise inspected the project quality, determined that the project quality conforms to the relevant mandatory construction specifications, design documents and contract provisions, and clearly put forward the project completion report. The report shall be approved, signed and sealed by the project manager and the person in charge of the construction enterprise.
2. In view of the new project entrusted by engineering supervision, the construction unit made quality comments on the project, provided detailed supervision information, and clearly put forward the project quality review report. The report shall be approved, signed and sealed by the project supervision engineer and the relevant person in charge of the construction unit.
3 survey and design enterprises in the whole process of survey, design documents and engineering construction, to confirm the design change notice signed by the design enterprise. The report shall be approved, signed and sealed by the person in charge of the survey and design of the new project and the relevant person in charge of the survey and design enterprise.
4, there are detailed files and engineering construction management materials. Including supervision materials, construction quality assurance materials, management methods and appraisal materials, and in line with the provincial urban construction archives business process technical specifications.
5. There are applications for key building decoration materials used in the project, certificates of engineering building concrete components and mechanical equipment, and necessary inspection reports.
What should be paid attention to in house acceptance?
1, door and window acceptance
When you check the door, you should check whether it can be opened normally. If it is a sliding door, check the smoothness of pulley track and bearing. Check the height of the window sill, and check the glass one by one for damage, slag collapse, fragmentation and lax sealing. Sealing strip, dustproof strip and waterproof strip are indispensable.
2, water and electricity acceptance
Pay attention to the water and electricity of the house when inspecting the house. When checking the circuit, we can buy a plug in the hardware store or online to help check the electricity. Check the main control switch, first turn off the switch, check whether the wire of the switch is loose, then turn on the switch, and check whether the wiring installation is reasonable with the electroscope. After the electroscope is plugged into the socket, if the neutral line and live line lights are on at the same time, the socket is normal. When accepting the waterway, the owner can open the water valve to see if the drainage is smooth and blocked, and wipe the bottom of the upper and lower pipes with toilet paper after the water valve comes out.
3. Ground acceptance
Everyone should pay attention to check whether the ground is flat or not when accepting the ground. When checking whether there is a problem on the ground, the best method is visual inspection. Visual inspection is not just about looking, such as carefully checking whether there are bumps on the ground, whether the color is roughly balanced, and how smooth the ground is.