Which department should be responsible for the preliminary design approval? Housing and Urban-Rural Development Bureau or Development and Reform Commission? Based on what file?
The examination and approval of the preliminary design shall be organized by the Planning Bureau for joint examination of fire protection, lightning protection, epidemic prevention, water heating and electric power. After examination and approval, it shall be carried out by the Planning Bureau. The main basis is the building planning permit, planning and design points (all handled by the Planning Bureau) and planning scheme design (approved by the Planning Bureau).

According to the Administrative Measures for Examination and Approval of Preliminary Design of Construction Projects, the accepting institution is Construction Bureau.

Construction bureau:

According to the institutional reform plan of the State Council approved by the first session of the 11th National People's Congress and the Notice of the State Council on Institutional Establishment (Guo Fa [2008]11No.), the Ministry of Housing and Urban-Rural Development (hereinafter referred to as the Construction Bureau) is established as a component of the State Council.

difficulty

Relevant materials to be prepared are as follows:

1. application (two copies, with the official seal of the construction unit):

2, the national development and Reform Commission for the record notice or approval (in duplicate);

3. Land formalities (in duplicate)

4, construction project site submissions (except for construction projects that have obtained the right to use construction land by way of transfer), construction land planning permit, planning and design conditions materials, planning and building red line map, planning and approval plan general plan (check the original and receive two copies);

4 original survey and design contract and two copies of qualification;

5. Twelve electronic documents of preliminary design documents, including a full set of preliminary design drawings, design descriptions, renderings, preliminary design descriptions, etc.

6. Two electronic CDs of geological exploration reports;

7 residential projects should be submitted huxing statistics (two originals);

8. According to the relevant regulations, the project office shall submit the address safety evaluation report and approval document issued by the Provincial Seismological Bureau (original inspection, two copies received);

9, is a high-rise building project, should be submitted to the provincial housing and urban-rural construction department for examination and approval of the seismic fortification review opinions (original inspection, two copies);

10, the municipal public facilities special project that should be subject to special seismic demonstration shall submit special seismic demonstration opinions;

1 1, design estimate (government investment project) (in duplicate)

Don't think it's good to prepare according to the following list. Some details will be explained when filling out the initial application form.

Extended data:

file management

Preliminary design documents shall be provided by qualified design units. When several design units jointly design, the general contractor is responsible for summarizing the design data. The preliminary design documents include descriptions, materials and drawings.

The documents shall be bound into an A3 text atlas (large drawings can be folded into A3 specifications) and stamped with the seals of the owner, designer, contractor, registered architect and registered structural engineer. The signature and seal on the design documents shall comply with the relevant provisions of the Detailed Rules for the Implementation of the Regulations on Registered Architects in People's Republic of China (PRC) and the Detailed Rules for the Implementation of the Regulations on Registered Structural Engineers in People's Republic of China (PRC).

Documents shall be bound in the order of perspective view, names (signatures and seals) of technical leaders and designers of the design unit, copies of previous replies of the municipal urban planning management department to the project, general design description, sub-item description and sub-item drawings (including design budget). All professional drawings must be signed completely.

The preliminary design is the predecessor of the final result, which is equivalent to a sketch of a painting. Generally speaking, the design before the final design is called preliminary design.

Generally speaking, building engineering should be divided into three stages: scheme design, preliminary design and construction drawing design; For civil construction projects with relatively simple technical requirements, when the relevant competent departments have no review requirements in the preliminary design stage and there is no preliminary design agreement in the contract, they can directly enter the construction drawing design after the scheme design is approved.