First, the blank room inspection and housing collection steps:
(1) All relevant documents and contract materials must be brought.
(2) Check the tools of the house, such as screwdriver, meter ruler and small hammer. And don't forget a pen and paper to record what you found during the house inspection.
(3) First check whether the wall is smooth, cracked and seeping. Knock on the wall with a small hammer or something to see if there is any empty drum.
(4) Secondly, check whether the ground is flat and cracked.
(5) Then check whether the doors and windows are intact and loose, and whether the design will affect daily life.
(6) Check whether the top surface is square and whether there is a big skew phenomenon.
(7) Check whether the positions of electric meters, switches and sockets are arranged reasonably, whether they can be used normally, whether the counting of electric meters is normal, and whether the grounding measures of electric switches are safe.
(8) Finally, check whether the water supply and drainage, water meter, faucet and main control valve are installed, whether the water flow and water pressure are normal, and whether there is water leakage, seepage and dripping at the faucet joint. Do a water test and go downstairs after 24 hours to see if there is any water leakage.
Second, the blank room inspection and housing collection steps After the indoor acceptance is completed, attention should also be paid to the outdoor environment and supporting facilities. Whether the greening downstairs is completed. Whether the building inclines and sinks, whether the wall tiles are firm, and whether the access control facilities of the unit door are normal. Stairs, fire protection, water and electricity meter rooms and other public equipment have potential safety hazards.
According to the above steps, timely communicate with the property to solve the problems found.