Method of wall brick: What can be pasted on the wet wall? 1. When selecting and processing bricks, choose bricks with proper colors, sizes, smooth edges and smooth surfaces and stacked bricks with different specifications, varieties and colors to check the quality of bricks.
What can I paste on the wet wall 2? The basic measure is to clean the base, make the flat wall smooth or wet the surface, and please wipe the dust at the bottom. The bottom ash is generally 2:5-2:3 cement slurry with a thickness of 8-1~ 3 μ m. As an adhesive layer, apply UE pad and wipe the bottom two days later. The bottom ash layer has a flat surface and vertical protrusions.
What can I put on the wet wall? 3. According to the size of the wall and the size of the brick, the horizontal and vertical control lines of the embedded brick structure pop up. Pre-row generally starts from the rising angle, rather than the whole brick row in the secondary position or the internal corner of the wall. Waste ceramic blocks and mixed cement slurry are used as marker blocks, and the spacing between marker blocks is set to 2 ~ 2~ 1.7cm. The marker blocks are hung in a straight line by wire supporting plates, and the surface smoothness is controlled by guide rails.
What can I put on the wet wall? 4. First soak the tile in clear water for 2-3 hours, and then wipe it clean with cold, dry or clear water. Paving mortar 1: 1.5? -? 2 Mud or pure cement slurry: 107: water = 100? :? 5? :? 26 Improve viscosity. When paving the floor, first soak the bottom ash layer with water, then smear it on the back of the ceramic surface, cut all the surfaces into inclined planes, and then paste the bottom ash layer on the bottom layer that is not set as a signature. If you need moderate smoothness, please tap the tile with the handle of the gray spoon to check the smoothness and gap of each part. The size of the gap should meet the design requirements.
5. After laying, the dirt on the cement must be removed within 4 hours, and the dust on the surface must be removed. The stitches must be cut with a bamboo stick, and the surface should be wiped clean with cotton cloth and silk. The stitches should be wiped clean with cement slurry of the same color and brushed with a long brush soaked in water. Seams should be symmetrical and tight. Finally, clean it with cotton silk, sandpaper and dilute hydrochloric acid, and then clean it with water. ?
Tubatu Online provides you with "every decoration quotation, 1-4 local decoration companies, 3 sets of decoration design schemes" and the decoration pit avoidance strategy for free! Click this link:/Zhu Ye /zxbj-cszy.php? to8to _ from = SEO _ zhidao _ m _ jiare & amp; Wb, you can get it for free ~