Sample Article 1 of the Waste Transportation Guarantee Letter: The Waste Transportation Commitment
Dear leaders of the Waste Transportation Office:
I Call and live, the filling task I undertook was less than 10,000 square meters of earth. It is a clean-up project. I have arranged for a sprinkler truck and 10 cleaning workers to clean the road in time to ensure that the road is clean and sanitary, free of dust, and to ensure that residents and pedestrians on both sides of the road are not affected. Transport vehicles do not bring dirt on the road, and their wheels are cleaned. We hereby promise to be clean and strictly implement the waste transportation management regulations.
Sincerely yours
Salute
Commitment person:
Year, month, day Part 2: Commitment letter for construction project waste transportation
To:
In order to further strengthen the management of various types of construction waste and engineering debris in the city, standardize the transportation of construction waste and engineering debris, prevent the leakage of transported debris, and maintain a clean city appearance and roads. Environment, according to the "Shaoyang City Construction Waste and Engineering Residue Disposal and Management Interim Measures" (Municipal Administration [2012] No. 17), this project has made the following solemn commitments:
1. The project was established with (Subject) The construction unit is the responsible subject and is responsible for the earth excavation and transportation of the project.
2. The general responsible unit shall conscientiously implement the construction site standards of construction projects
1. The access roads to the construction site must be hardened, and the hardened length shall be determined according to the actual conditions of the site, but the length shall not be less than 30 meters. , with a width of not less than 4 meters;
2. The construction site must build a car washing platform and a car washing tank, equip it with car washing equipment, and arrange cleaning personnel to ensure that the clean car comes out;
3. Construction The construction site must be fenced with solid materials. The height of the fence at the construction site adjacent to the main and secondary arterial roads shall not be less than 2.5 meters. The height of the fence at the construction site adjacent to the back streets and alleys shall not be less than 1.8 meters;
4 It is strictly prohibited to stack buildings outside the fence. Materials and debris, if the work is stopped midway, the construction site should be cleaned up in time and the construction site should be closed;
5. The debris generated during the construction of urban road underground pipeline laying projects must be excavated and transported to ensure cleanliness along the construction line Sanitation;
6. After the completion of the project, the construction unit shall promptly clear away the debris and other objects stored at the construction site within 5 days (within 3 days for road construction).
If there is any violation of the above commitment, you will voluntarily accept the punishment from the Shaoyang City Construction Engineering Administration Bureau.
Commitment unit: (stamped)
Signature of legal representative:
Year, month, day Part 3: Waste transportation commitment letter
In order to strengthen civilized construction management, enhance corporate image, and improve the surrounding environment, our company promises to do the following during the excavation period:
1. Hang a waste management responsibility sign in a conspicuous place outside the construction site gate to indicate the responsibility for the waste. Please provide the person and contact number to ensure that the phone is open 24 hours a day.
2. The person responsible for the waste shall wear an armband and be on-site, strictly observe duty discipline, stick to his or her post, and earnestly perform management responsibilities to ensure that construction vehicles are not carrying mud on the road and are free from dust pollution. 3.
4. Set up flushing facilities that meet specifications and ensure they can be used normally at any time. Arrange at least 4 full-time cleaners, uniformly wearing identification armbands and safety vests, responsible for flushing vehicles entering and exiting and cleaning entrances and exits.
5. A vehicle washing sign is set up at the gate of the site. Vehicles entering and exiting the construction must pass through the car washing tank. They must be thoroughly rinsed and inspected by management personnel before leaving the construction site. 6.
Dust pollution.
7. Facilities such as car wash tanks, washing platforms, sedimentation tank drainage ditches, etc. should be dredged in time to ensure smooth drainage. In dry weather, water should be sprayed in time to reduce dust to prevent sewage from being discharged directly into the municipal pipes when construction vehicles are driving in the site. net.
8.
9. The entrance and exit of the site should be cleaned in time to avoid dust, slag and other pollution.
Formulate contingency plans for dust and road pollution accidents, reserve corresponding emergency disposal facilities on site, and promptly activate the contingency plans to handle properly when pollution accidents occur, so as to reduce and eliminate the impact on the urban environment in the shortest possible time.
Commitment unit (chapter):
Commitment person (signature): Chapter 4: Commitment letter to standardize waste transportation and vehicle cleaning at the construction site
Name of the tenderer : Our company hereby commits itself as the bidder of the project name. Once our company wins the bid, we promise to do a good job in environmental work during the construction period of this project, reduce environmental pollution caused by dust and dirt during construction, reduce the harm caused by dust pollution, protect human health, and strive to create a civilized and standardized construction site. According to Based on the actual situation of this project, a series of safeguard measures have been specially designed.
(1) The project department should strengthen the management of the construction site's waste transportation and vehicle cleaning. The construction site should set up a full-time administrator to be responsible for the control of the construction site's waste transportation and vehicle cleaning. Deal with violations of construction site waste transportation regulations.
(2) At the entrance and exit of the construction waste discharge site, inspect the capacity, condition and relevant licenses of vehicles entering the construction site; vehicles that do not meet the prescribed requirements will not be allowed to enter the construction site.
(3) The entrance and exit of the construction site must be equipped with facilities to prevent vehicles from leaving the construction site with dirt. All vehicles must have their tires rinsed before leaving the construction site. Brooms must be installed in the construction site guardroom. Vehicles must be equipped with dirt cleaning machines to transport dirt. Carry out inspections on outgoing vehicles and transport them in a sealed manner. They must not be overloaded or overloaded, and prevent slag transport vehicles from bringing mud onto the road and causing spillage and leakage.
(4) Direct the vehicles to be loaded to park in an orderly manner, ensure the safety of vehicle loading and unloading operations, and cooperate with the unit to eliminate hidden dangers of production safety accidents.
(5) Set up hard enclosures at the construction site in accordance with the required construction site environmental protection measures, and beautify the enclosures in accordance with regulations. Construction units should strengthen the management of muck trucks and conduct frequent inspections to prevent contamination. Once contamination occurs, timely arrangements should be made for cleaning and rectification.
(6) Check the cleanliness of the entrances and exits of the construction site and surrounding roads, and arrange personnel for cleaning in a timely manner.
(7) Actively cooperate with management and law enforcement departments in on-site law enforcement inspections, and proactively introduce the transportation operation situation.
If there is a breach of promise, our company will bear all the resulting responsibilities. Chapter 5: Letter of Commitment for Transportation and Spilling of Engineering Soil (including Engineering Residue)
In accordance with the "Tianjin Urban Management Regulations" (Tianjin Government Order No. 26) and the "Tianjin Civilized Construction Management Regulations for Construction Projects" ( According to the relevant provisions of the Tianjin Government Order No. 100), during the construction of the project, our unit will strengthen the shipment management of engineering soil (including engineering residue) to prevent pollution of the city environment due to leakage during transportation. We have made the following commitments:
1. Develop a complete waste transportation plan and implementation plan, and carry out waste removal according to the prescribed driving route.
2. The carrier hired has the "Tianjin Construction Engineering Waste Transportation Special Professional Engineering Contracting Enterprise Qualification".
3. Set up an access control device at the exit of the construction site and assign dedicated personnel to perform duties. The vehicles entering the site must be sealed vehicles that meet the regulations. Vehicles that are overloaded or not tightly sealed will not be allowed to leave the site.
4. Clean the transportation vehicles loaded with slag. If they are not cleaned, they will not drive out of the site, and the vehicle tires will not carry mud on the road.
5. Keep the ground clean within 50 meters outside the exit of the construction site, and send dedicated personnel for daily cleaning.
6. The construction site has the conditions to set up cameras at the entrances and exits to maintain real-time and smooth connection with the civilized construction supervision system.
7. In the event of overloading of vehicles with slag, leakage due to loose sealing, or vehicles bringing mud onto the road to pollute the road environment, we are willing to accept corresponding administrative penalties in accordance with relevant laws and regulations.
Commitment unit (seal):
Signature of project leader:
Year, month, day;
1. Is the photo of the will legally binding?
Whether the photos of the self-written will are valid o