Stainless steel production contract template
Stainless steel equipment is widely used in salt making enterprises. Ben, what do you know about stainless steel production contracts? The following is a sample stainless steel production contract I have compiled for you. Thank you for your appreciation.

Stainless steel production contract Fan Wenyi

Entrusting unit: (hereinafter referred to as? Party a? )

Contractor: (hereinafter referred to as? Party B)

In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, both parties reached an agreement and signed this contract on the basis of equality, voluntariness and fair negotiation in good faith.

Article 1: Project Overview

1, project name: Sanya Reception Center Landscape Project

2. Project location: Sanya

Article 2: Scope and Methods of Contracting

1, contract scope:

2. Contracting method: Party B manufactures and installs the stainless steel of this project by contracting materials.

Article 3: Total Project Price:

1, this project is a lump-sum project with unit price, and the settlement of quantities is completed according to the actual situation (see the annex to the contract for details; Stainless steel production list)

2. The total project price is about RMB one hundred and eleven thousand seven hundred and seventy-eight Yuan only (¥ 10 1778.00).

3. If additional items are added during construction, they shall be executed according to the unit price and bill of quantities confirmed by both parties.

Article 4: Construction Period

1. According to the agreement between Party A and Party B, the construction period of this project is tentatively set at 20 effective working days (subject to the receipt of the notice of commencement from Party A).

2. The commencement time shall be subject to the notice of entry, and Party A shall send a commencement notice to Party B three days before commencement.

3. In case of the following circumstances, the construction period shall be postponed accordingly:

(1) Failing to provide the construction site, water, electricity and roads as stipulated in the construction preparation, and failing to remove obstacles, thus affecting the on-site construction;

(2) The materials, equipment, products or semi-finished products supplied by Party A cannot meet the construction needs or need to be repaired, matched, replaced or replaced due to defects found during inspection, which affects the progress;

(3) Due to Party A's design change, the progress is affected or the construction cannot be carried out;

(4) In the process of construction, the water supply is stopped for more than 8 hours due to rain or power failure, or the water supply and power failure are continuously interrupted for more than 3 days (more than 4 hours at a time), which affects the normal construction;

(5) The supervision visa is delayed due to reasons other than Party B, which affects the construction of the next working procedure;

(6) Party A fails to allocate the advance payment, material preparation payment or project progress payment as agreed in the contract, which affects the construction;

(7) Force majeure factors affect the construction progress.

Article 5: Payment and Settlement of Project Funds

1. Payment method:

(1) down payment: within three days after the signing of the contract, Party A shall pay 30% of the total project price as the preparation fee, that is, 30,000.00 yuan.

(2) Second payment: After the parts are installed in place, Party A will pay 80% of the total contract price.

(4) Within 30 days after the project completion acceptance, Party A shall pay 20% of the total contract price.

2. If the engineering quantity increases due to design change and modification required by Party A, or there are new projects, Party A shall pay according to the above-mentioned project cost ratio.

3. The project is settled according to the actual quantities.

Article 6: Party A's responsibilities

1. Party A shall clean up the site before construction, so as to achieve three links and one leveling (water, electricity, roads and construction site are leveled).

2. Party B shall ensure that the water source, power supply and distribution box are connected to the construction site within 100 meters, and Party B is only responsible for connecting the construction cable from the distribution box of Party A.. ..

3. Party A is responsible for providing Party B's personnel with electricity and water for construction and living free of charge.

4. Party A is responsible for providing temporary accommodation, processing land and storage of tools and instruments for Party B's field personnel free of charge.

5. Party A shall pay the project payment on time.

6. Party A designates Party A's representative of this project to be responsible for all the affairs of this project.

Article 7: Party B's responsibilities

1. Party B must carry out the construction according to the construction drawings, description documents and construction and installation engineering specifications, and accept the supervision of Party A's representative.

2. Party B must abide by the following provisions during the construction:

(1) The main raw materials provided by Party B must provide quality certificates according to relevant regulations, or can be used in the project only after passing the inspection;

(2) The main raw materials, equipment, components and semi-finished products provided by Party A must be qualified before they can be used in the project;

(3) The change or substitution of materials must be approved by the representative appointed by Party A before it can be used in the project;

(4) The concealed works must be inspected and accepted by Party A's representative before the next working procedure can be carried out.

3. Party B shall do a good job in fire prevention and theft prevention of materials and facilities on the construction site, and designate the protection of underground pipelines.

4. Before the project is delivered to Party A, Party B shall do a good job in protecting the finished house, various structures and facilities. If there is any damage, it shall be repaired before delivery to Party A (limited to Party B's project content).

5. Party B shall carry out civilized construction, and arrange the machinery, materials and facilities on the site according to the construction organization design, so that the construction site can meet the requirements of civilized construction. The treatment of construction waste shall meet the requirements of city appearance management, and the building and construction site shall be cleaned up before the completion of the project.

6. Party B shall strictly implement the safety production regulations of relevant state departments, and arrange construction personnel to carry out safety and civilized construction education; Party B shall be responsible for industrial accidents caused by construction.

Article 8: Construction and Design Changes

1. The design drawings, descriptions and relevant technical data delivered by Party A will serve as an effective basis for Party B's construction. Before the commencement of construction, Party A shall organize the joint review of design drawings as a supplementary basis for construction, and Party A and Party B shall not modify them without authorization.

2. On the premise of ensuring the quality of the project, Party B puts forward reasonable suggestions to modify the design and technology, which will be implemented after Party A agrees.

3. If Party A needs to change the design, the original design unit must make a formal notice of modification and modify the drawings before Party B can implement it. The required expenses and time limit shall be agreed by both parties.

4. During the construction period, if Party B meets the actual situation or man-made obstacles, it shall immediately report to Party A for ruling, and the required expenses and construction period shall be agreed by both parties.

Article 9: Completion Acceptance

1. Party B shall verbally notify Party A of the completion acceptance 7 days in advance; Party A shall call relevant personnel to complete the special acceptance of the contents of the project made by Party B within 7 days, and the project will be deemed to have passed the acceptance after the deadline.

2. If the project has not been accepted, and Party A uses it in advance or without authorization, it will be deemed that the project has passed the acceptance, and any quality or other problems arising therefrom shall be borne by Party A. ..

3. If the project fails to pass the acceptance due to Party A's reasons, and Party A uses the completed project in part or in whole, it will be deemed that the project has passed the acceptance.

Article 10: Liability for breach of contract

1. If Party A fails to pay all payments on time as agreed in this Contract, Party A shall pay Party B the deferred payment interest from the due date to the actual payment date, and the interest shall be calculated at the loan interest rate of the People's Bank of China for the same period.

2. After this contract comes into effect, if Party A unilaterally terminates this contract without paying the down payment, Party A shall pay Party B a penalty of 5% of the total project cost; If Party A unilaterally terminates this contract after paying the first installment, the paid amount will not be returned as liquidated damages and Party B will be compensated for the actual expenses incurred.

3. If Party B fails to complete and deliver the project as scheduled, it shall pay 0.5 ‰ of the total daily project cost as penalty. However, unless the construction period is delayed due to the circumstances listed in Article 4 of this contract.

Article 1 1: supplementary provisions

1. Matters not covered in this contract shall be settled by both parties through negotiation; If a supplementary agreement is signed, the supplementary agreement has the same effect as this contract.

2. Any dispute arising from the execution of this contract shall be settled by both parties through consultation; If negotiation fails, it shall be under the jurisdiction of the court where Party B is located.

3. This contract shall come into effect as of the date when the legal representative or entrusted agent signs or affixes the official seal or special seal for the contract, and shall be terminated after all funds are settled.

4. This contract is made in duplicate, with the same legal effect, and each party holds one copy.

5. Signing place: Project Department of Sanya Reception Center of Jinan Garden Hainan Branch

6. Date of signature:

Party A; Party B;

Year month day:

Stainless steel production contract Fan Wener

Party A:

Party B:

In accordance with relevant laws and administrative regulations, following the principles of equality, voluntariness, fairness, honesty and credit, and in order to ensure the safety, civilized construction, quality and progress of this project, and to clarify the rights and obligations of both parties, Party A and Party B hereby sign this construction contract for the manufacture and installation of stair handrails, glass doors and doors, with specific terms as follows:

I. Overview of the Project

1. Project name: Xuchang Radio and Television Building

2. Project Location: Intersection of Wei Wu Road and Bayi Road.

Second, the way, scope and content of project contracting

1. Engineering contracting methods include: engineering contracting, material contracting, mechanical contracting (including entering and leaving the site), safety contracting, civilized construction contracting and quality contracting.

2. The project contracting contents include: the manufacture and installation of stair handrails, the manufacture and installation of glass doors and door hoppers (including materials), all quality inspections involved in the whole construction process, the collection, sorting and compilation of all technical data, and the construction contents related to power supply, water supply and temporary facilities.

Third, the project cost and material specifications

1, unit price of stair handrail: 155 yuan/meter.

1, made of DN60 stainless steel round tube, with a wall thickness of1mm. zero

2. Stainless steel square tube, 40*60 columns, 25*25 horizontal tubes, 1mm thick.

2. Unit price of stainless steel glass door: 300 yuan/㎡, made of 1mm thick brushed stainless steel plate and 10mm thick tempered glass; 300 yuan floor spring/only, handle 100 yuan/payment, floor spring lifetime warranty.

3. The unit price of stainless steel door bucket is 550 yuan/㎡, specification: 6+6 tempered glued glass, stainless steel plate thickness1mm. The stainless steel corner of the door bucket and the wall thickness of the inner steel column are 2mm. Note: The above construction settlement unit price includes material fee, material transportation fee, material processing fee, loading and unloading fee, installation labor fee and material tax. Materials shall be provided by Party B, and Party A shall be responsible for providing the construction site.

Four, safe production and civilized construction

In the process of construction, Party B shall carry out management in strict accordance with Party A's requirements, abide by the operating rules for safe production, be equipped with full-time safety officers, and take necessary safety protection measures to ensure construction safety. In case of safety accidents or other accidents caused by Party B's illegal operation, Party B shall bear all responsibilities and all economic losses and expenses. Party A is responsible for on-site coordination, and Party B is responsible for civilized construction and related safety production and civilized construction materials.

Verb (abbreviation of verb) payment terms

Party B pays the down payment to Party A: RMB (in words), accounting for% of the materials. Party A shall pay the required project payment to Party B within 15 days after the project is completely completed and accepted by the project department and the supervisor, and deduct 3% from the project payment of Party B as the quality deposit, and pay off the remaining quality deposit after the completed project has no quality problems one year later.

Duration time of intransitive verb: Party B shall complete all required quantities with the main completion time from the date of entering the site.

Seven. This contract is made in quadruplicate, one for Party A and Party B and one for Party A's company. After the materials enter the site for construction, Party A shall pay the completed quantities to Party B..

Eight. This contract shall come into effect as of the date of signature and seal by both parties, and shall expire as of the date of project payment settlement.

Party A (seal): Party B (seal):

Authorized Agent: Authorized Agent:

Phone: mobile phone: phone: mobile phone:

Year month day:

Stainless steel production contract Fan Wensan

Party A:

Party B:

According to the relevant provisions of the Economic Contract Law of the People's Republic of China, this contract is signed by both parties through full consultation.

I. Contents of the contract:

1. The style and size of stainless steel and aluminum alloy billboard (sample) (with installation) are shown in the sample draft (attachment 1).

2. Party A shall provide the production and installation contents of the painted screen.

Second, the contract amount:

Stainless steel billboard unit price: quantity: aluminum billboard unit price: quantity: property management fee quantity: * * RMB (in figures) (in words) (excluding tax)

Three. Payment terms:

1. After signing this contract, Party A shall pay Party B the property management fee in full, that is, RMB ¥ (in words: RMB only).

2. Party B will make full efforts to make stainless steel billboards in the community. After the production of stainless steel publicity column is completed, Party A will pay all the production expenses to Party B at one time, in words: RMB only.

Four. Responsibilities and obligations:

1. Party B shall complete relevant production work according to Party A's requirements.

2. Party B shall complete it within the specified time.

3. Party A shall provide relevant materials according to Party B's requirements, and bear legal responsibilities and economic disputes caused by copyright and literary responsibility.

Party A must organize formal acceptance within 3 days after Party B's complete production and installation. If Party A fails to organize acceptance after completion, Party B shall be deemed as Party A's acceptance of the quantity and quality of the project. ..

Liability for breach of contract of intransitive verbs:

Due to the particularity of production work, Party B has been fully performing the contract from the beginning. Therefore, if Party A terminates the contract in advance, Party B will not refund the advance payment.

7. Any dispute between Party A and Party B during the performance of this contract shall be settled through friendly negotiation; If there is no result, it will be submitted to legal channels for settlement. This contract is made in duplicate, one for each party, signed and sealed by the other party, with the same legal effect.

Party A: Party B:

Representative signature: Representative signature:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _