How to write an air conditioning installation safety agreement

In daily life and work, agreements are needed in more and more places. Signing an agreement can more effectively restrain breach of contract. What issues do you need to pay attention to when writing an agreement? The following are some air conditioning installation safety agreements that I recommend for everyone. I hope they can help you!

Air conditioning installation safety agreement 1

Party A:

Party B:

In order to ensure the safety of the Qingzhi Taekwondo billboard installation project in Hohhot, both parties agreed to sign this agreement after negotiation.

Article 1 Safety Responsibilities of Party A

Party A shall provide oral safety education to Party B’s on-site person in charge before Party B installs the promotional signs. Party A’s on-site safety person in charge shall be The main contents are safety precautions related to installation.

Article 2 Party B’s Safety Responsibilities

1. Party B shall prepare its own machinery, equipment, tools, and materials required for the installation of promotional signs, and shall be responsible for providing safety belts, safety helmets, Masks and other labor protection supplies.

2. Party B is responsible for the safety and security education of the installation personnel, installs in strict accordance with relevant national safety operating regulations, takes safety precautions, and achieves safe and civilized construction.

⒊Party B must sign a safety agreement with Party A before installation. Otherwise, Party B will be deemed to have performed the work without authorization and will be responsible for the consequences.

⒋Party B must ensure legal employment and complete relevant documents. Any losses caused by Party B’s illegal employment shall be borne by Party B.

⒌After entering the site, Party B must obey Party A’s instructions and accept Party A’s supervision. Party A has the right to inspect and handle the matter.

⒍Party B must do a good job in protecting the finished product and must not pollute the original decoration, equipment, and facilities. Otherwise, it must clean up, restore it to its original state, or pay compensation until Party A is satisfied. Party B shall bear the losses caused by insufficient protection of finished products.

⒎Party B must do a good job in labor protection. When working on exterior walls, edges, or at heights, safety belts must be fastened. Hang them in a reliable location. Hang them high and use them low. You must not hang them low or use them high. Do not wear safety belts. The installation of promotional signs is strictly prohibited.

⒏ Party B must ensure that there are no casualties or fire accidents. In the event of safety accidents such as fire, electric shock, falling from high altitude, object strike, mechanical injury, poisoning, heatstroke, casualties, etc., all losses and responsibilities caused shall be borne by Party B and have nothing to do with Party A.

⒐ Party B must do a good job in protecting buildings, pipelines, and indoor items, and do a good job in safety police equipment and safety protection, and must not harm others, otherwise Party B will bear the losses caused.

⒑The waste residue, waste liquid and waste generated by Party B during the installation are not allowed to be dumped or placed randomly. They must be cleaned up in a timely manner to the location designated by Party A to ensure that the site is cleared after the installation.

⒒Party B must abide by the laws and regulations and must not commit theft, otherwise he will be punished.

Article 3 This agreement is made in two copies, with Party A and Party B each holding one copy. It will take effect after being signed and sealed by both parties, and has the same legal effect.

Party A (signature): Party B (signature):

Address: Address:

Authorized agent: Authorized agent:

Telephone: Telephone:

Date: Year Month Day Date: Year Month Day

Air Conditioning Installation Safety Agreement 2

1. Before starting the project, the design must be The engineer determines the location of lamps, sockets and sanitary ware, and accurately calculates materials.

2. After the materials enter the site, you must count the quantity yourself, check for damage and quality problems, protect them yourself and store them in a safe place. No materials from the construction site are allowed to be taken privately. Once discovered, triple compensation will be made.

3. Construction should be carried out without damaging the structure. If load-bearing beams and columns are required, the situation must be reported in time and construction by oneself is not allowed. The wire pipe should not be less than 5mm into the wall. A cutting machine must be used to cut the grooves. The hidden pipes and cassettes are firmly buried. The openings of the cassette and the surface must be smooth and consistent. The water pipes entering the wall must be tested and sealed before being sealed. If rework is caused by water leakage, all rework materials and labor will be the responsibility of the person in charge of the construction.

4. Use a spirit level when installing sanitary ware. If rework is caused because the sanitary ware is not level, you will be responsible for all rework materials and labor costs. Installation tools should be placed together and should not be placed on furniture, marble countertops or floor tiles. If tools are placed randomly and cause damage to the finished product, compensation will be pursued.

5. Actively cooperate with other types of work and cannot delay and affect other construction progress. Always pay attention to construction safety and be solely responsible for any work-related injuries. Keep the construction site clean and tidy every day, and regularly transport garbage to the designated garbage dump on the property downstairs.

6. No fees may be charged from customers. Drawing changes, size changes, additions and subtractions, etc. must be approved by the company before construction can be carried out. If the construction is carried out privately, all consequences will be borne by oneself.

7. Complete the work strictly in accordance with the deadline specified in the "Construction Plan". A fine of 50 yuan will be imposed for one day of delay.

8. The company will withhold 5% of the project deposit. During the one-year warranty period, any quality problems must be handled on site in time. If there is delay or shirk, the project deposit will not be refunded. .

The above rules are not exhaustive, so we hope to strictly observe self-discipline. If no accidents occur throughout the year and the work is completed on time or ahead of schedule, the company will reward you at the end of the year.

Project name:

Responsible person’s signature: Date

Air conditioning installation safety agreement 3

Party A: ID card:

p>

Party B: ID card:

In order to strengthen the management of decoration personnel, Party A and Party B have reached the following terms through negotiation:

1. Party B is responsible for the safe construction of decoration construction personnel. Educate and supervise construction safety operating procedures and take necessary safety protection measures in accordance with regulations.

2. Party B shall be responsible for repairing pipe blockage, water leakage and other accidents caused by decoration construction. If other economic property losses and casualties occur, Party B shall bear all financial and other responsibilities.

3. This agreement is made in two copies, with each party holding one copy. It will take effect from the date of signature and has legal effect. We hope that all workers will work safely to ensure the safety of others and themselves.

Party A:

Party B:

Year, Month, Day

Air Conditioning Installation Safety Agreement 4

A Party: Xuancheng Baihui Real Estate Co., Ltd.

Party B: Hebei Mingkang Mechanical and Electrical Equipment Co., Ltd.

After friendly negotiation between Party A and Party B, the installation of air conditioning project in the first phase of Xuancheng Baihui Trade Logistics Park The following agreement has been reached:

1. Party A will hand over the air-conditioning installation project in Area A (the Taiguan centrifuge part) of the first-phase air-conditioning project of Xuancheng Baihui Trade and Logistics Park to Party B, and Party B will be responsible for the air-conditioning project. Provide high-quality and fast installation services.

2. Responsibilities and obligations of Party A and Party B

Party A

1. Cooperate with Party B, the supervision unit and the general contractor The unit's work is carried out smoothly and completed on schedule;

2. Cooperate with Party B to provide the water, electricity, and material sites required for project construction;

3. Guide and supervise the construction If there are any changes in the relevant technical aspects of the process, Party B will be notified in a timely manner;

4. Timely allocate construction costs to Party B in accordance with this agreement;

5. Comply with other relevant terms of this agreement .

Party B

1. Organize the construction team and construction equipment to enter the site on time, closely cooperate with Party A in the comprehensive quality management related to this type of work during the construction, and comply with all on-site requirements. system to maintain the company's overall image;

2. Develop a reasonable material entry plan, actively cooperate with on-site material procurement, properly classify and store incoming equipment and materials, and have detailed information on the use of materials in stages. Written records;

3. Collect and keep the instructions for use and relevant inspection information that come with the air-conditioning equipment and main materials;

4. Rationally use and save installation materials to eliminate waste and Loss, material loss caused by intentional damage and poor management shall be borne by Party B;

5. Fire prevention, anti-theft, civilized construction, strengthen safety management and bear the costs incurred due to unfavorable safety measures;

p>

6. The project installation shall be carried out in strict accordance with relevant national specifications to ensure the quality of the project;

7. Effectively control the construction progress and report the progress of the project regularly to ensure that the project is completed as scheduled. Party B will be fully responsible for any losses caused to Party A due to delays in the construction period;

8. Cooperate with the equipment manufacturer in debugging, data recording and data collection of the air conditioning system;

9 , Party B shall respond to Party A’s warranty period commitment to the owner for the quality guarantee period of the installation project it undertakes.

3. Construction scope and construction period requirements of this project

The construction scope of this project is: the air-conditioning water system in the area covered by the centrifugal refrigeration unit (terminal air hood, air-conditioning water pipeline, main engine room, System electrical) installation, that is, all installation work of the air-conditioning water system in the first to fourth floors of the shopping mall and the basement air-conditioning machine room including shafts and cooling towers. Fabrication and installation of ventilation systems.

The installation period of this project is eighty days, calculated from the date of receipt of the installation notice from Party A, (meaning that the terminal water system in the Taiguan business area has been pressure tested, cleaned, insulated, and powered. The installation progress of the computer room has completed more than 80% of the total workload. The installation of the terminal wind cabinet control box and main engine must be coordinated with the decoration unit to determine the date)

If the construction period is delayed due to Party B's reasons, RMB will be charged for each day of delay. 5,000 yuan will be paid to Party A as a delayed performance fee for an extension of 30 days. Party A has the right to unilaterally terminate the contract and will not be responsible for the losses caused to Party B. After Party A terminates the contract, Party A requires Party B to bear 500,000 yuan in liquidated damages.

4. Installation costs and payment methods

1. The installation cost of this project is the lump sum price of manual cleaning. No other costs will be included during construction. The total construction and installation costs are RMB (lowercase). ) 78.48 million yuan.

(Capital: 718,000,000,880,000 Yuan) Among them, Tai Kwun A area is NT$540,000; Tai Kwun B area is NT$244,800.

2. Payment of installation costs:

(1) Installation auxiliary materials, water pipes, insulation materials and other related auxiliary materials shall be constructed according to the air-conditioning drawings, and the air-conditioning indoor unit arrives at the site. Party B shall pay 30% of the total cost of partition installation.

(2) After the installation and debugging is completed and Party A has passed the inspection and acceptance, Party A will pay Party B the installation labor fee within one week to 92% of the total installation fee of the project, that is, 72.20__ million yuan (including Area A is 496,800 yuan; Area B is 225,216,000 yuan);

(3) 5% of the final payment will be used as the installation quality deposit, within ten days after the two years after the end of the warranty period pay off.

(4) 3% of the installation fee is the total contracting fee.

5. Matters that need to be supplemented by Party A and Party B

6. This agreement is made in triplicate, with Party A and Party B each holding one copy and the equipment supplier reporting one copy. From the date of signing, Effective. This agreement serves as an attachment to the central air-conditioning system equipment purchase and installation contract for Area A and Area B of Daguan, Xuancheng Baihui Trade and Logistics Park Phase I. It abides by the provisions of the main contract. If there is any inconsistency, this agreement shall prevail. It shall have the same effect. Legal effect.

Signature of Party A (representative):__

____year__month__day

Signature of Party B (representative):__

< p> ____year__month__

Air conditioning installation safety agreement 5

Party A: Shaanxi __ Co., Ltd.

Party B:

In order to strengthen construction safety management, adhere to the policy of safety first and prevention first, and ensure safe production, everyone is responsible, and we have signed this safety responsibility letter.

1. Party B must ensure that all personnel entering the construction site are over 18 years old and in good health. The elderly, weak, sick, disabled, pregnant, family members, children and child laborers are not allowed to enter the site. Otherwise, Party B will be responsible for all consequences and Party A will not bear any responsibility.

2. All construction personnel of Party B must abide by the six major disciplines of production safety stipulated by the state, abide by Party A’s safety management system and the "Regulations on Civilized Construction on Construction Sites", and be familiar with and master the safety regulations and operating specifications of this type of work. .

3. Party B and its teams must establish a safe construction leadership group, set up full-time safety officers to keep in touch with Party A, conduct regular safety education for their employees, and conduct frequent safety construction inspections (especially before work) Education inspection), and a safety responsibility letter must be signed with individual employees. Party B will be responsible for all consequences arising from failure to sign.

4. Party B must ensure that all employees use protective measures correctly in accordance with regulations and must not abuse or use them; ensure that they wear safety helmets when entering the construction site, and workers are strictly prohibited from wearing slippers, hard-soled slip-on shoes, permeable shoes, and bare shirts Go to work; operators of special types of work must be certified to work. It is strictly prohibited to use unlicensed personnel who do not understand mechanical, electrical and equipment operation techniques. If there is any violation, all liability shall be borne by Party B.

5. Party B’s off-site construction personnel are prohibited from entering the construction planning area, otherwise Party B will be responsible for all consequences.

6. During the construction period, Party B’s teams and individuals must enhance safety awareness and protect their own safety. Party B will be responsible for any accidents, big or small, and Party A will not be held responsible. (Note: This article applies to safety accidents caused by Party B's own various reasons)

7. During the construction period, Party B shall bear full responsibility for accidental injuries to others due to Party B's lax internal management.

8. During the construction period, if Party B personnel fight with other contracting teams, each contracting team shall bear their own responsibility, and Party A will be severely punished in accordance with the "Civilized Construction Regulations on Construction Sites".

9. If Party B’s construction workers get lost or have any unsafe incidents when going out, Party B will be solely responsible for it, and Party A will not be held responsible.

10. Party B’s personnel or family members are not allowed to set up stalls, open canteens, or sell non-staple food at the construction site and living area. To prevent food poisoning and accidents.

11. This letter of responsibility is made in four copies, with two copies each for Party A and Party B as attachments to the project contract contract.

If there are new content terms, they will be included as attachments to this contract and have the same legal effect as this contract.

12. This contract will take effect from the date of signature by both parties. It will automatically expire after the contracted construction is completed and the accounts are settled and paid in full.

Party A: Shaanxi __ Co., Ltd. Person in charge:

Party B: Person in charge:

Signing date:

How to write Articles related to air conditioning installation safety agreement:

★ Installation safety agreement sample

★ Installation safety agreement

★ Air conditioning installation agreement

< p> ★ Safety Agreement for Air Conditioning Maintenance

★ Safety Agreement for Air Conditioning Maintenance

★ Safety Agreement for Installation and Construction

★ Template of Air Conditioning Installation Contract Contract

★ Air-conditioning installation contract template

★ Air-conditioning installation contract template