Five construction contracts for self-built houses.
The purpose of a contract is different from the object of the contract. The object of a contract is the object of specific contractual rights and obligations, and the purpose of a contract is the ultimate goal to be achieved by both parties through the conclusion and performance of the contract. Below I will sort out the construction contracts and materials for self-built housing contracting, I hope you like them!

Self-built house construction contract 1.

Employer (Party A):

Contractor (Party B):

After friendly negotiation between Party A and Party B, Party A decided to entrust Party B with decoration. In order to ensure the smooth progress of the project, in accordance with relevant national laws and regulations, following the principles of equality, voluntariness, fairness and good faith, this contract is hereby signed for * * * * to abide by.

I. Project: Decoration project.

Second, the contracting method is contractor.

Total project budget (excluding tax) in words:, (in figures: ¥)

3. If Party A requests to add or change the engineering design, it shall negotiate with Party B to implement it. If the construction period is prolonged as a result, Party A shall bear the responsibility.

4. Party B shall carry out the construction and finish it before, otherwise, Party B shall pay a penalty of one thousandth of the total project cost for each day overdue, which can be deducted from the project cost.

Verb (abbreviation of verb) Party A shall sign and seal the construction plan (drawing) for confirmation. Construction shall be carried out according to the drawings. When the actual size of the construction site is not in conformity with the drawings, Party A shall be notified to negotiate and modify it, and construction can only be started after confirmation and seal.

6. If Party A requests to change the engineering design, it shall notify Party B in writing to negotiate for implementation. Both parties shall negotiate the changed design, and evaluate and confirm the compensation for the losses caused by Party B's working hours and materials. In the process of construction, if the owner requests to add projects, both parties will confirm the quotation at that time.

Seven. The quantities of concealed works shall be measured on site by representatives of both parties, and Party A shall be notified two days in advance. However, when Party A's representative is not on site before the concealed works are needed, Party B has the right to conceal the works by itself, and settle the accounts according to the quantities provided by Party B. After Party A and Party B's representatives measure the concealed quantities on site, Party A's representative fails to sign for confirmation, and Party B shall keep the handwritten quantities data of Party A's representative for settlement.

Eight. Party B shall notify Party A within five days after the completion of this project and jointly accept it with Party B. Both parties shall jointly complete the acceptance within five days after Party A receives Party B's acceptance notice, and both parties shall sign the acceptance documents for confirmation. If Party A fails to accept or move in with Party B within five days after receiving Party B's notice, it shall be deemed that Party A's default project quality meets the requirements.

Nine, the project construction process, in case of force majeure, the time limit for a project is interrupted, and the time limit for a project will be restored after the force majeure factors are eliminated.

X. The quality warranty period of this project is three years, counting from the date of acceptance by both parties (note: Party A shall be responsible for man-made damage).

XI。 Settlement of this project: according to the actual workload completed on site, the unit price is area.

12. Payment method: 40% of the project payment shall be paid in advance before entering the site, 30% for the second time, 20% for the completion of the top coat, and the remaining 5% shall be paid in one lump sum within 10 days after the project is accepted. In addition, 5% is reserved as the quality deposit, and Party A will return the quality deposit after the expiration.

13. If Party B violates the construction specifications, safety operation specifications, fire prevention regulations, environmental protection regulations and other agreements of both parties, Party B shall bear all economic losses caused thereby.

Fourteen Other attached pages of this contract shall come into effect after being signed by both parties.

15. This contract is made in duplicate and will come into effect after being signed by both parties.

Party A: Party B:

Representative: Legal Representative:

Agent:

Address: Address:

Tel: Tel:

Fax; Fax:

Account number:

Date: Year Month Day

Date: Year Month Day

On the construction contract of self-built house contracting and material packaging 2 pages

Party A:

Party B:

Based on the principles of equality, mutual benefit, fairness, justice, honesty and credit, and in order to clarify the responsibilities, obligations and rights of both parties, Party A and Party B have voluntarily reached the following terms and conditions on the construction, materials and employment of private houses undertaken by Party A through friendly negotiation for common compliance.

I. Overview of the Project:

1, project name: private house

2, the structure level:

3. Construction site: West xie cun, Xia Shu Town.

4. Building area: square meters

Second, the way of contracting:

Cleaning workers, machinery, equipment and materials, building materials.

Three. Scope and content of the project:

1. Cushion, corner, foundation, main body, roof, indoor and outdoor decoration painting, concrete floor upstairs and downstairs.

2, all materials handling.

Four, building materials requirements:

1, porous brick:

2. Cement:

3, steel bar:

Five, quality management:

Quality standard: The quality of the project constructed by Party B shall meet the relevant national and local construction and acceptance standards and Party A's requirements.

Six, the progress of the project:

Term of the contract: from year to year, with a total of calendar days.

Seven, safe and civilized construction:

In the process of construction, Party B shall be responsible for the safety accidents of its construction personnel, which has nothing to do with Party A. (The project cost includes the insurance premium of Party B's workers. )

Eight. Settlement price and method:

1, fixed unit price lump sum: RMB/m2, calculated according to the actual construction area (the construction area is calculated according to national standards).

2. After the completion of the project, the project cost shall be reserved as the project quality deposit, and all quality and safety issues such as maintenance shall be paid within one year after the project completion acceptance.

Nine. Payment terms:

According to the progress of the project, Party A shall pay after the foundation ends, the main body ends, painting ends, the project is completed and accepted, and there is no quality problem for one year.

X. field power consumption:

Party A shall be responsible for the expenses.

Xi。 Construction water:

Party A shall be responsible for the expenses.

Twelve. Dissolution and termination of the contract:

1. Termination of the contract: If Party B's labor arrangement and the quality, progress and safety of the construction project cannot meet Party A's requirements, Party A has the right to send a notice of termination to Party B, order Party B to leave and settle 70% of the completed project. Year-end settlement

2. Termination of the Contract: This Contract shall be terminated after Party A and Party B exercise their rights and reasonably perform their respective obligations according to the terms of the Contract.

3. For matters not covered in the above contract terms, both parties may sign a supplementary agreement separately, and the supplementary agreement has the same effect as this agreement.

4. This contract is made in duplicate, one for Party A and one for Party B, and shall come into effect after being signed by both parties.

Party A (official seal): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B (official seal): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

On the construction contract of self-built house contracting and material contracting 3 pages

Employer (Party A):

Contractor (Party B):

After friendly negotiation between Party A and Party B, Party A decided to entrust Party B with decoration. In order to ensure the smooth progress of the project, in accordance with relevant national laws and regulations, following the principles of equality, voluntariness, fairness and good faith, this contract is hereby signed for * * * * to abide by.

I. Project: Decoration project.

Second, the contracting method is contractor.

Total project budget (excluding tax) in words:, (in figures: ¥)

3. If Party A requests to add or change the engineering design, it shall negotiate with Party B to implement it. If the construction period is prolonged as a result, Party A shall bear the responsibility.

4. Party B shall carry out the construction and finish it before, otherwise, Party B shall pay a penalty of one thousandth of the total project cost for each day overdue, which can be deducted from the project cost.

Verb (abbreviation of verb) Party A shall sign and seal the construction plan (drawing) for confirmation. Construction shall be carried out according to the drawings. When the actual size of the construction site is not in conformity with the drawings, Party A shall be notified to negotiate and modify it, and construction can only be started after confirmation and seal.

6. If Party A requests to change the engineering design, it shall notify Party B in writing to negotiate for implementation. Both parties shall negotiate the changed design, and evaluate and confirm the compensation for the losses caused by Party B's working hours and materials. In the process of construction, if the owner requests to add projects, both parties will confirm the quotation at that time.

Seven. The quantities of concealed works shall be measured on site by representatives of both parties, and Party A shall be notified two days in advance. However, when Party A's representative is not on site before the concealed works are needed, Party B has the right to conceal the works by itself, and settle the accounts according to the quantities provided by Party B. After Party A and Party B's representatives measure the concealed quantities on site, Party A's representative fails to sign for confirmation, and Party B shall keep the handwritten quantities data of Party A's representative for settlement.

Eight. Party B shall notify Party A within five days after the completion of this project and jointly accept it with Party B. Both parties shall jointly complete the acceptance within five days after Party A receives Party B's acceptance notice, and both parties shall sign the acceptance documents for confirmation. If Party A fails to accept or move in with Party B within five days after receiving Party B's notice, it shall be deemed that Party A's default project quality meets the requirements.

Nine, the project construction process, in case of force majeure, the time limit for a project is interrupted, and the time limit for a project will be restored after the force majeure factors are eliminated.

X. The quality warranty period of this project is three years, counting from the date of acceptance by both parties (note: Party A shall be responsible for man-made damage).

XI。 Settlement of this project: according to the actual workload completed on site, the unit price is area.

12. Payment method: 40% of the project payment shall be paid in advance before entering the site, 30% for the second time, 20% for the completion of the top coat, and the remaining 5% shall be paid in one lump sum within 10 days after the project is accepted. In addition, 5% is reserved as the quality deposit, and Party A will return the quality deposit after the expiration.

13. If Party B violates the construction specifications, safety operation specifications, fire prevention regulations, environmental protection regulations and other agreements of both parties, Party B shall bear all economic losses caused thereby.

Fourteen Other attached pages of this contract shall come into effect after being signed by both parties.

15. This contract is made in duplicate and will come into effect after being signed by both parties.

Party A: Party B:

Representative: Legal Representative:

Agent:

Address: Address:

Tel: Tel:

Fax; Fax:

Account number:

Date: Year Month Day

Date: Year Month Day

On the construction contract of self-built house contracting and material contracting 4 pages

Party A:

Party B:

Based on the principles of equality, mutual benefit, fairness, justice, honesty and credit, and in order to clarify the responsibilities, obligations and rights of both parties, Party A and Party B have voluntarily reached the following terms and conditions on the construction, materials and employment of private houses undertaken by Party A through friendly negotiation for common compliance.

I. Overview of the Project:

1, project name: private house

2, the structure level:

3. Construction site: West xie cun, Xia Shu Town.

4. Building area: square meters

Second, the way of contracting:

Cleaning workers, machinery, equipment and materials, building materials.

Three. Scope and content of the project:

1. Cushion, corner, foundation, main body, roof, indoor and outdoor decoration painting, concrete floor upstairs and downstairs.

2, all materials handling.

Four, building materials requirements:

1, porous brick:

2. Cement:

3, steel bar:

Five, quality management:

Quality standard: The quality of the project constructed by Party B shall meet the relevant national and local construction and acceptance standards and Party A's requirements.

Six, the progress of the project:

Term of the contract: from year to year, with a total of calendar days.

Seven, safe and civilized construction:

In the process of construction, Party B shall be responsible for the safety accidents of its construction personnel, which has nothing to do with Party A. (The project cost includes the insurance premium of Party B's workers. )

Eight. Settlement price and method:

1, fixed unit price lump sum: RMB/m2, calculated according to the actual construction area (the construction area is calculated according to national standards).

2. After the completion of the project, the project cost shall be reserved as the project quality deposit, and all quality and safety issues such as maintenance shall be paid within one year after the project completion acceptance.

Nine. Payment terms:

According to the progress of the project, Party A will pay when the foundation ends, the main body ends, painting ends, the project is completed and accepted, and there is no quality problem after one year.

X. field power consumption:

Party A shall be responsible for the expenses.

Xi。 Construction water:

Party A shall be responsible for the expenses.

Twelve. Dissolution and termination of the contract:

1. Termination of the contract: If Party B's labor arrangement and the quality, progress and safety of the construction project can't meet Party A's requirements, Party A has the right to notify Party B to terminate the contract, order Party B to quit, and settle 70% of the completed projects. Year-end settlement

2. Termination of the Contract: This Contract shall be terminated after Party A and Party B exercise their rights and reasonably perform their respective obligations according to the terms of the Contract.

3. For matters not covered in the above contract terms, both parties may sign a supplementary agreement separately, and the supplementary agreement has the same effect as this agreement.

4. This contract is made in duplicate, one for Party A and one for Party B, and shall come into effect after being signed by both parties.

Party A (official seal): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B (official seal): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

About the self-built house contract 5

Employer (hereinafter referred to as Party A):

Contractor (hereinafter referred to as Party B):

According to the Contract Law of People's Republic of China (PRC) and other relevant laws and regulations, in order to ensure the interests of all parties, Party A and Party B have reached the following agreement through consultation on the basis of equality, voluntariness and consensus:

I. Overview of the Project

1. Project location: decoration project of Runsheng Manor.

2, engineering decoration area:

3. Project contracting: Party B contracts projects and materials.

4, the project period:

According to the negotiation between the two parties, the construction period is tentatively set as year month day to year month day. In case of unforeseeable or force majeure, the construction period will be postponed.

5. Contract price:

The construction cost per square meter of this contract project is RMB: Yuan, and the total amount is RMB: Yuan, and amount in words is RMB only.

Two. Party A's work

1, responsible for coordinating site construction.

2, to participate in the supervision of project quality and construction progress, to participate in the acceptance of engineering materials, concealed engineering acceptance and completion acceptance.

Three. Party B's work

1. During the construction process, strictly implement the safety construction operation specifications, fire prevention regulations, construction specifications and quality standards, and complete the contract project with good quality on schedule.

2, the construction personnel should be civilized construction, barbaric construction is prohibited. Party A has the right to request the replacement of the construction personnel with poor performance, and the contractor shall not delay.

3. Party B must guarantee the project quality. If there are any construction quality problems, Party B shall correct them in time. If quality problems are found in the process of completion acceptance, Party B shall immediately correct them, and Party A has the right to refuse to pay labor costs before Party A's rectification requirements are met.

4. Party B shall strengthen the safety education on fire prevention and theft prevention for the on-site construction personnel, and the construction personnel shall not violate the law and discipline at the construction site. If there is a problem, the consequences will be borne by them. All civil and criminal liabilities incurred by Party B's construction personnel during the construction and warranty period shall be borne by Party B. ..

Fourth, the construction period delay

1. If the completion date is delayed due to the following reasons, the construction period may be postponed after confirmation by Party A: engineering quantity changes; Force majeure; Other circumstances in which Party A agrees to postpone the construction period.

2. If the project cannot be completed on schedule due to Party B's responsibility, the construction period will not be postponed; The cost of rework of engineering quality problems caused by Party B shall be borne by Party B, and the construction period shall not be postponed. If the delay exceeds 3 days, Party B shall be paid the labor cost, which shall be calculated manually every day.

3. If the construction period is delayed due to Party B's reasons, Party A shall be compensated for the loss by 3‰ of the total project cost for each day of delay.

Verb (abbreviation of verb) project acceptance and warranty

1, in the process of construction, the joint acceptance of project quality is divided into the following stages:

(1) Material acceptance;

(2) Acceptance of concealed works;

(3) Completion acceptance.

2. After the project is completed, Party B shall notify Party A for acceptance.

3. Before the completion acceptance by both parties, Party B shall be responsible for protecting the safety of finished products and the project site.

4. The warranty period of interior decoration works under normal use conditions is one year from the date when both parties sign the project completion acceptance. During the warranty period, if it is found that there is serious deformation or affects the overall appearance after repair, Party B shall bear the responsibility for replacement.

Six, the project payment method:

The total project price is: yuan, in words: yuan.

After the whole process is completed and accepted,% of the total project price will be allocated, and% of the total project price will be reserved as quality deposit. There is no quality problem after one year of completion acceptance, and the quality deposit is paid in full without interest.

Seven. responsibility for breach of contract

1. If one party fails to perform its contractual obligations as agreed, causing losses to the other party, it shall be liable for compensation; If you are punished for violating relevant laws and regulations, the ultimate responsibility shall be borne by the responsible party.

2. If one party cannot continue to perform the contract, it shall notify the other party in time, and the responsible party shall bear the losses caused by the termination of the contract.

Eight. Dispute resolution method

Disputes arising under this contract shall be settled by both parties through consultation or applied to the Consumers Association for mediation. If negotiation or mediation fails, it shall bring a lawsuit to the people's court where the project is located and request the people's court to make a ruling.

Nine. Labor force management

1. Without Party A's permission, off-site construction personnel shall not spend the night at the site.

2. Party B shall handle the on-site entry and exit certificates and pay relevant fees.

3. Without the consent of Party A, Party B shall not stop work or go slow under any circumstances.

X. Construction machinery and tools

1. Party B shall bring its own tools needed for construction, and ensure the safety and good usability of the tools, and the maintenance expenses of the tools shall be borne by Party B..

2. Consumables (such as drill bits and saw blades) generated by the tools shall be borne by Party B. ..

XI。 Other agreed matters.

1. For projects not confirmed by Party A and Party B, the project payment will not be increased.

2. During the construction period, if Party A thinks that Party B's construction personnel are not qualified for the renovation work due to technical level, work attitude, personality and other reasons, Party A has the right to ask Party B to replace the construction personnel.

3. During the warranty period, if Party A informs the construction party that it needs maintenance, the construction party must arrive at the site within 24 hours. If Party A fails to propose a solution within 48 hours after applying for repair due to the quality problem of materials provided by Party B, Party A can solve it by itself, and all expenses incurred by Party A shall be borne by Party B. During the warranty period, if water, electricity, gas and other accidents endanger personal safety or other property safety due to engineering quality problems, Party A can deal with them first, and Party B will pay all reasonable expenses incurred by Party A afterwards. During the warranty period, if it is found that there is serious deformation or affects the overall appearance after repair, Party B shall bear the responsibility for replacement.

Twelve. enclose herewith

1. This contract is made in quadruplicate, with Party A and Party B holding two copies respectively, and shall come into force after being signed by both parties.

2. After this contract is signed, the project shall not be subcontracted.

3. Both parties may modify or supplement this contract in written form, but if the modification or supplement unreasonably relieves or exempts Party B from the responsibilities stipulated in this contract, this contract shall still prevail.

4. If the performance of the contract is affected or losses are caused due to reasons not attributable to both parties, both parties shall settle the matter through negotiation based on the principle of fairness.

5. The contract will be automatically terminated after completion.

Thirteen. additional clause

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Five items related to the contract and materials of self-built houses;

★ Five professional contracts for construction engineering.

★ 2022 model articles of individual rural self-built house contract.

★ 6 Model construction project contract.

★ Model contract for rural self-built houses (2)

★ Five simple single project contracting agreements

★ 5 copies of single construction labor contract model.

★ 5 standard individual project contract templates

★ 5 classic engineering contract templates.

★ Universal Construction Contract Template

★ 6 samples of simple subcontract project contract.