Complete project contracting contracts

The contract period is directly related to the performance time of the rights and obligations of both parties, and involves the interests of the parties; both parties agree on their respective rights and obligations without violating national laws and regulations; below I will bring you the project A complete collection of contract contracts, I hope you all like it!

A complete collection of project contract contracts 1

Owner: _____________ (referred to as Party A)

Person in charge of the contract: ____________ (referred to as Party A) Party B)

Party A is building a private house in Jiangbei District, ___ County. The main project of building the building is now contracted to Party B to be responsible for the construction. In order to ensure the quality of the project and complete it on time, Party A has clearly defined the responsibilities of both parties. After mutual agreement, Party B After discussion and agreement, we hereby sign the following agreement:

1. Contracting method: The project adopts the form of contracting labor but not materials. The steel, cement, sand and gravel materials, nails, iron wires, ropes, etc. used by Party A to build the house cannot be used anymore. The recycled materials are all provided by Party A. The various mechanical equipment used by Party B for construction, such as mixers, paddle mixers, winches, vibration equipment, formwork, roof timbers, scaffolding timber, shovels, trolleys and other construction tools are the responsibility of Party B.

2. Project content: Continuously complete the main frame structure required by Party A from 0 to above, indoor plastering, building height and front part style, construction according to urban construction design drawings, interior design requirements according to Party A Construction, including kitchen and bathroom layout making.

3. Project quality: Construction must be carried out in accordance with regulations. The quality requires that the wall surface is straight, the brick joints are filled with grout, the beams and columns are required to be vertical and flat, with sufficient strength, and the corners of the steel bars at both ends and the ribs must be bent enough 135 horn.

4. Responsibility of both parties: During the construction process, if Party A makes any mistakes in its guidance, Party A will take care of all losses and compensate Party B for labor losses. If the material is forced to rework due to collapse or distortion, Party B will be responsible for compensating for all material losses, which will be deducted from the project payment when the project is settled.

5. Settlement and payment method: Project settlement is calculated according to the actual construction area according to national standards. Party A will settle the settlement to Party B in yuan per square meter of construction area. After all projects are completed and accepted, all settlements will be paid upon completion. money.

6. Safe construction: Party B’s construction team must be highly technical in quality, carry out safe and civilized construction, and construct according to specifications. Party B will be responsible for any quality accidents or personal safety accidents that occur during the construction process.

7. Construction period: During the construction period, all main contracted projects are required to be completed within one month.

8. If there are any discrepancies in this agreement, both parties will agree to resolve them through negotiation or handle them in accordance with contract law.

9. This agreement is made in two copies, with Party A and Party B each holding one copy, which shall become effective upon signature by both parties. If the project is completed and accepted, it will be automatically terminated after the project payment is settled.

Party A’s signature: ____________ Party B’s signature: ____________

___year___month___day___year___month___day

Complete Project Contracting Contract 2

Party A: Party B:

ID Number: ID Number:

Telephone: Telephone:

After friendly negotiation between Party A and Party B, Party A is willing to outsource the contracted ___ project to Party B for construction, and reach the following agreement on the construction content, project quantity, project progress, etc.:

1. Scope of the project :___.

2. Project volume: The total project area is ___㎡. When the project volume changes significantly, the total salary will be increased or decreased accordingly.

3. Working hours: __month__, 20__ to __month__, ***day, 20__.

4. Total salary: Calculated based on the project volume and working hours, the total salary is set at ___ yuan, and 10% of the total salary will be deducted for each day of delay.

5. Other agreed matters:

1. All staff shall be employed, managed, supervised, restrained and educated by Party B.

2. Workers must obey the arrangements, supervision and management of the project management personnel after entering the site.

3. All work must be carried out in accordance with the specifications of project management.

4. The staff must conscientiously implement the project management regulations, and Party B will be responsible for all consequences caused by illegal operations.

5. Safety work should be carried out unremittingly. If any safety accident occurs, it will be solved by Party B itself and has nothing to do with Party A.

6. All staff must bring their second-generation ID cards to work. Those without ID will be refused entry. The total number of workers to be hired will be calculated as ___ people. For each less person, a daily deduction of _ Yuan.

7. All staff must be familiar with engineering operating procedures and proficient in engineering technology. If the management staff suggests that the staff are not qualified for the job due to poor quality, Party A will unconditionally allow Party B to evacuate the construction site. Party B is responsible for the losses.

8. When Party B is qualified for this job, Party A will bear the transportation expenses for Party B to the project site, which is calculated as ___ yuan. Otherwise, Party B will be responsible for it and Party B will choose the means of transportation.

9. If conditions permit, Party A will provide Party B with daily conveniences such as food and accommodation.

10. After the project is completed and the construction site is cleared and the debris is cleared according to regulations, and the tools and safety equipment are returned to Party A, Party A will pay all wages.

6. This Agreement is made in duplicate, with each party holding one copy. It will take effect after being signed and sealed by both parties. After the agreement is signed, both parties must implement it in accordance with the agreement. The defaulting party shall bear corresponding liability for breach of contract, and the liquidated damages shall be ___ times of the total salary.

Party A (seal): Party B (seal):

Legal representative (signature): Legal representative (signature):

Authorized agent Person (Signature): Authorized Agent (Signature):

Signing Place: Signing Place:

Year, Month, Day

Complete Project Contracting Contract 3

Party A: (contractor)

Party B: (contractor)

After study and decision by the school committee, in order to strengthen the management of the safety of students entering and exiting the school, improve School operating conditions to ensure the safety of teachers and students, combined with the actual situation of the school, after negotiation between Party A and Party B, the following agreement was reached:

1. Project content:

Ladder handrails outside the central school gate and garden pond renovation projects on campus.

2. Project location: Pingshang Town Central School.

3. Quality requirements and price:

(1) Handrail: It is required to be made of brick-concrete structure, the length is the same as the length of the ladder (20 meters long), and there is a ladder platform Turn the corner according to the corner of the platform, with a height of 1 meter (including the cap part). Use a brick to cover the hand-held surface in the same way as a 24-centimeter wall, and then paste it with gray sand. The inside and the surface are required to be tiled. , ceramic tiles require more than 40 yuan per square meter. The unit price is 395 yuan per square meter (including material costs, labor costs, freight, etc.), and the total amount is 15,800 yuan.

(2) Flower pond: Use sand and gravel to lay a layer of ground 25 meters long and 2 meters wide in the middle, then harden it with 330 grade cement, make two stone tables on both sides of the ground, and make stone benches. The unit price is 100 yuan per square meter (including material fees, ground treatment, labor costs, etc.), and the total amount is 5,000 yuan.

4. Construction safety: Party B shall establish safety protection measures and civilized construction systems, organize construction in strict accordance with the regulations on safety protection and civilized construction, and ensure construction safety. All safety accidents during the construction process will be borne by Party B. The contractor is not responsible.

5. Payment method: After the contract is signed and takes effect, after the project is completed, it will be inspected by Party A’s personnel. After the acceptance is passed, Party A will make a one-time reimbursement to Party B for the two projects. The total amount is RMB: 20,000 and one. One thousand and eight hundred yuan (: 21,800.00 yuan). The contract price includes various taxes and fees, which are all the responsibility of Party B. Party A is not responsible for various taxes and fees.

7. Construction start date: _________year____month____day.

8. Completion date: _________year____month____day. If construction is not possible due to special circumstances such as rainy days, the construction period can be postponed.

9. Organize acceptance: Party A, the construction party, the central school, and the school will jointly conduct acceptance. This contract consists of two pages, in duplicate, each Party A and Party B shall hold one copy, and shall come into effect upon signature by both parties.

Party A (official seal): _________

Party B (official seal): _________

Legal representative (signature): _________ Legal representative (signature): _________

_________year____month____day

_________year____month____day

Complete Project Contracting Contract 4

Party A: _________

Party B: _________

According to Party A’s needs, Party B is entrusted with the construction of the roof waterproofing project of Project B. After negotiation between Party A and Party B, the following agreement is reached:

1. Area and price:

1. The roof area of ??this project is approximately square meters. After acceptance, the actual settlement will be made.

2. The price of waterproof layer B in this project is 18.0 yuan per square meter, and the approximate project cost is yuan.

2. Material requirements

1. The B and materials used in the project must comply with the current national regulations.

2. Material specifications must meet the design requirements and satisfy the construction unit and owner.

3. Other materials shall be as required by the design drawings.

3. Production and installation requirements:

1. Comply with national specifications and industry standards.

2. Special requirements shall be based on design requirements

4. Delivery time and location

1. According to Party A’s needs, Party B must deliver the goods before the construction period specified by Party A All installation steps are completed and the project is completed.

2. Party A shall provide Party B with installation convenience as much as possible.

3. Party B shall be responsible for any losses caused by Party B.

5. Payment and Settlement Methods

1. After the project construction is completed, Party B shall submit the inspection to Party A in a timely manner, and Party A shall organize acceptance in a timely manner.

2. The final total price will be settled based on the actual production and installation length.

3. Payment method: _________

6. Maintenance services and contractual responsibilities

1. The project roof waterproofing warranty is for ________ years. After the project is accepted, due to For quality problems, Party B is responsible for maintenance (except for natural disasters and human factors).

2. If there is leakage in the project during the warranty period, Party B will be responsible for all losses caused.

2. Party A shall pay as scheduled and as required by the contract. If payment is not made in time, Party A shall be responsible for all consequences arising therefrom.

7. The construction period agreed upon by both parties

1. The construction period of this project is 15 days.

2. The waterproof layer of this project must be completed on _________year____month____.

3. If Party B fails to complete the above deadline, Party A will fine Party B 500 yuan per day.

8. Matters not covered in this agreement shall be resolved through negotiation between Party A and Party B.

9. This agreement is made in two copies, one copy each for Party A and Party B. It will take effect upon signature by both parties.

Party A:

Party B:

Time:

Complete Project Contracting Contract 5

Party A: _________

Party B: _________

In accordance with the "Contract Law of the People's Republic of China" and the "Construction and Installation Project Contract Regulations", Party A will "_________office building wiring project" "(Project address: _________) The project is entrusted to Party B for design, installation, commissioning and maintenance. After negotiation between Party A and Party B, the following agreement was reached:

First project scope

Integrated wiring system: Provide equipment and materials according to the attached list, and complete 98 information points ( (including 65 data points and 34 voice points) installation and debugging; after the completion of the project, test data reports of all information points will be provided.

Network system: Provide equipment and materials according to the attached list, and be responsible for the installation and debugging of all switches.

All project construction shall be carried out in accordance with the "_________ Office Building Wiring Plan" (hereinafter referred to as the "Plan").

Article 2 Project Contracting Method

The project contracting method adopts labor contracting and material contracting. All materials and equipment quantities involved in the project shall be implemented in accordance with the "Plan". For details, please refer to the "Plan" and the contract attachment. .

Article 3 Total Project Cost and Payment Method

1. Total Project Cost

The total project cost is: Yuan (uppercase: _________).

Note: Please see the attachment for details of the above price composition

Adjustment of contract price: When the content and scope of the project change, and the quantity of materials and equipment involved changes, the contract price will be adjusted by Party A and Party B. The representative *** agreed.

2. Payment method

① After the project is accepted and accepted, Party A shall pay 97 of the contract amount, that is, _________ yuan (in capital letters: _____________) once within ____ days The property shall be paid in full to Party B.

②The project quality deposit is 3% of the contract amount, that is, $$$; the project quality deposit shall be paid to Party B after _________ years from the date of project acceptance.

Note: All project payments will be made by bank transfer.

Article 4 Project Duration

1. Within ____ days from the effective date of the contract, Party B’s project manager will enter the site to determine the specific construction drawings and construction plans (which Party B is responsible for producing) , and designate an on-site supervision engineer. The construction drawings and plans can only be implemented after they are signed (stamped with _) by the project leaders of both parties.

2. The project start date is: _________

3. If there is a need to make changes to the "design plan", they must be confirmed by the project leaders of both parties before implementation.

4. If the project cannot be carried out on time due to Party A's reasons, Party B has the right to submit an extension application to Party A in writing. After Party A's verification and signature (stamped with _), Party B can extend the construction period. postponed.

5. When Party A stops construction for any reason, it shall promptly notify Party B in writing and determine the resumption date. When it is possible to resume construction, it shall also notify Party B in writing and the construction period will be postponed accordingly; if the resumption date cannot be determined, On the date, Party A needs to settle the corresponding project progress payment to Party B based on the completed amount of the project.

6. Party B shall complete the implementation of the project before _________ and submit the project completion report to Party A.

Article 5 Project Acceptance

Party B shall submit a written acceptance application to Party A within ____ days after completion and provide complete completion information (project completion report, equipment and material acceptance records, Project settlement statement, etc.) and one set of project completion drawings;

1. Party A will complete the audit within 90 days from the date of receiving Party B’s acceptance application and related materials, and organize relevant personnel to conduct acceptance. Overdue acceptance will not be accepted It is deemed to have passed the acceptance;

The acceptance standards are based on the "_________ Office Building Wiring Plan", as well as "Electronic Computer Room Design Specifications" (gb50174-93), "Computing Station Site Technical Conditions" (gb2887-) Wait for the implementation of relevant national standards;

2. After the acceptance is passed, Party B will issue an acceptance report, and the project leaders of both parties will sign (stamp _) on the acceptance report.

Article 6 Responsibilities of both parties

Party A’s responsibilities:

1. Pay the project payment as required by the contract;

2. Coordinate relevant matters The department provides Party B with a place to store materials;

3. Coordinate with relevant departments to provide Party B with the water and electricity needed during the construction process;

4. Assist Party B with coordination during the construction process Relationship with the civil construction unit to ensure the smooth implementation of the project;

5. After the project is accepted, Party A is responsible for the protection of the system, and all losses caused by improper human operation shall be borne by Party A;

p>

6. Party A assigns _________ to assist Party B in the construction process of the project, and is responsible for the acceptance of the burial project during the construction process, the inventory and acceptance of equipment and materials, and the signature and confirmation of documents and vouchers such as project visa forms. , _________ will sign on behalf of _____________ when he/she is absent.

Party B’s responsibilities:

1. After the contract takes effect, ____ will enter the site to determine the construction plan within ____ days;

2. The materials and equipment involved in the project are guaranteed to be original.

3. Complete the construction content according to quality and quantity on schedule;

4. During the construction period, you must abide by the safe and civilized construction regulations of the construction site and obey Party A’s on-site supervisor Reasonable arrangements for personnel, any economic losses and consequences caused by violation of the above regulations will be borne by Party B;

5. The entire wiring system project is provided with a _________year warranty period, and the equipment involved in the project is For the warranty period, please refer to the "After-sales" instructions in the "Attachment", but damage caused by improper human operation and force majeure are not covered by the quality guarantee;

6. The response service time is within 2 hours and needs to be solved on site. We guarantee that faults will be solved on-site within 24 hours (except statutory holidays);

7. Prepare project completion, acceptance and management documents, and provide actual network cable wiring diagrams and every information point and voice point fe written test report.

Article 7 Liability for breach of contract

1. If Party B cannot complete the work within the time specified in the contract, Party B shall pay Party A one thousandth of the total contract price for each day of delay. Liquidated damages.

2. If Party A fails to pay the project payment as stipulated in the contract, Party A shall pay a late fee to Party B at one thousandth of the amount payable for each overdue day.

3. If the construction period is delayed due to Party A’s reasons or force majeure, the construction period will be postponed.

4. Party A and Party B are obliged to keep all contents involved in the contract confidential. If the relevant contents of the contract are leaked to a third party without the consent of the other party, they shall bear the liability of the other party. loss.

5. If one party breaches this contract and causes losses to the other party, it will be dealt with in accordance with the relevant provisions of the "Contract Law of the People's Republic of China".

6. Any matters not covered in this contract shall be resolved by mutual negotiation between Party A and Party B.

Article 8 Miscellaneous

This contract is made in four copies, with Party A and Party B each holding two copies. It will take effect after being signed (sealed with _) by both parties.

Party A: _________

Party B: _________

Legal representative or authorized agent: _________

Legal representative or authorized agent: _________

Signature and seal (official seal): _________

Signature and seal (official seal): _________

_________year____month____day