High score reward "Execution Form of Mandatory Provisions of Thermal Power Plant Construction Standards" for all

Filling Instructions

Part One? Implementation Plan of Mandatory Provisions

Part Two? Implementation Record Form of Mandatory Provisions

1 .Execution record form of mandatory provisions of technical documents for turbine-generator unit design and equipment installation

2. Implementation record form of mandatory provisions of turbine-generator unit equipment inspection

3. Turbine power generation Record form for the implementation of mandatory provisions for important materials of the unit

4. Record form for the implementation of mandatory provisions for metal technical supervision and inspection of important components of steam turbines and generators

5. Mandatory provisions for inspection of large castings of steam turbines Implementation Record Form

6. Implementation Record Form of Mandatory Provisions for Turbine Generator Basic Inspection

7. Implementation Record Form of Mandatory Provisions for Steam Turbine Cylinder Installation

8 .Execution Record Form of Mandatory Provisions for Steam Turbine Cylinder Fastener Installation

9. Implementation Record Form of Mandatory Provisions for Steam Turbine Sliding Pin Installation

10. Implementation Record Form of Mandatory Provisions for Steam Turbine Cylinder Combination

11. Record form for the implementation of mandatory provisions for the installation of cylinders and bearing seats

12. Record form for the implementation of mandatory provisions for the installation of cylinder expansion indicators

13. Record form for the implementation of mandatory provisions for turbine generator bearing installation

14. Record form for the implementation of mandatory provisions for turbine buckle cover

15. Record form for the implementation of mandatory provisions for inspection of generator insulation components Table

16. Implementation record of mandatory provisions for work in the generator stator

17. Implementation record of mandatory provisions for generator stator hoisting

18. Power generation Record form for the implementation of mandatory provisions for engine bearing and fan installation

19. Record form for the implementation of mandatory provisions for generator end cover sealing:

20. Implementation of mandatory provisions for generator cooling water flushing Record sheet

21. Record form for the implementation of mandatory provisions for the installation of turbine protection devices

22. Record form for the implementation of mandatory provisions for the installation of turbine emergency breaker fuel injection test devices

< p>23. Implementation Record Form of Mandatory Provisions for Installation of Turbine Emergency Interruption Indicator

24. Implementation Record Form of Mandatory Provisions for Installation of Turbine Shaft Displacement and Differential Expansion Protection Device

25. Steam Turbine Implementation Record Form of Mandatory Provisions for the Installation of Emergency Interrupting Devices

26. Implementation Record Form of Mandatory Provisions for the Installation of Steam Engine Electric Overspeed Protection Devices

27. Mandatory Provisions for the Installation of Steam Turbine Low Oil Pressure Protection Devices Implementation Record Form

28. Implementation Record Form of Mandatory Provisions for Turbine Protection Device Installation

29. Implementation Record Form of Mandatory Provisions for Turbine Protection Device Installation Information

30 .Execution record form of mandatory provisions for the installation of oil drain pipes in accidents of steam engine oil tanks

31. Implementation record form of mandatory provisions for installation of gasoline engine oil pipelines and valves

32. Mandatory connection between turbine cylinder and pipelines Record form for the implementation of mandatory provisions for turbine body pipeline installation

33. Record form for the implementation of mandatory provisions for turbine body pipeline installation

34. Record form for the implementation of mandatory provisions for hydraulic pressure testing of auxiliary equipment

35. Implementation Record Form of Mandatory Provisions on Tank Anti-corrosion and Closure

36. Implementation Record Form of Mandatory Provisions on Turbine Generator Unit Commissioning Quality

Part Three? Implementation of Mandatory Provisions Checklist

1. Preparation of mandatory provisions before installation of turbine generator body and implementation of mandatory provisions

2. Preparation of foundation and mandatory configuration of horn (block) before installation of turbine generator Checklist for the implementation of mandatory provisions for the metal technical supervision of turbine-generator unit parts

3. Checklist for the implementation of mandatory provisions for the metal technical supervision of turbine-generator unit parts

4. Inspection of the implementation of mandatory provisions for the turbine body installation project Table

5. Checklist for the implementation of mandatory provisions for the installation project of regulating and lubricating oil system equipment

6. Checklist for the implementation of mandatory provisions for the installation project of generators and exciters

7. Checklist for the implementation of mandatory provisions for the installation of auxiliary equipment

8. Checklist for the implementation of mandatory provisions for turbine adjustment, start-up and trial operation

Part 4? Mandatory provisions Execution summary table