Filling Instructions
Part One? Implementation Plan of Mandatory Provisions
Part Two? Implementation Record Form of Mandatory Provisions
1 .Execution record form of mandatory provisions of technical documents for turbine-generator unit design and equipment installation
2. Implementation record form of mandatory provisions of turbine-generator unit equipment inspection
3. Turbine power generation Record form for the implementation of mandatory provisions for important materials of the unit
4. Record form for the implementation of mandatory provisions for metal technical supervision and inspection of important components of steam turbines and generators
5. Mandatory provisions for inspection of large castings of steam turbines Implementation Record Form
6. Implementation Record Form of Mandatory Provisions for Turbine Generator Basic Inspection
7. Implementation Record Form of Mandatory Provisions for Steam Turbine Cylinder Installation
8 .Execution Record Form of Mandatory Provisions for Steam Turbine Cylinder Fastener Installation
9. Implementation Record Form of Mandatory Provisions for Steam Turbine Sliding Pin Installation
10. Implementation Record Form of Mandatory Provisions for Steam Turbine Cylinder Combination
11. Record form for the implementation of mandatory provisions for the installation of cylinders and bearing seats
12. Record form for the implementation of mandatory provisions for the installation of cylinder expansion indicators
13. Record form for the implementation of mandatory provisions for turbine generator bearing installation
14. Record form for the implementation of mandatory provisions for turbine buckle cover
15. Record form for the implementation of mandatory provisions for inspection of generator insulation components Table
16. Implementation record of mandatory provisions for work in the generator stator
17. Implementation record of mandatory provisions for generator stator hoisting
18. Power generation Record form for the implementation of mandatory provisions for engine bearing and fan installation
19. Record form for the implementation of mandatory provisions for generator end cover sealing:
20. Implementation of mandatory provisions for generator cooling water flushing Record sheet
21. Record form for the implementation of mandatory provisions for the installation of turbine protection devices
22. Record form for the implementation of mandatory provisions for the installation of turbine emergency breaker fuel injection test devices
< p>23. Implementation Record Form of Mandatory Provisions for Installation of Turbine Emergency Interruption Indicator24. Implementation Record Form of Mandatory Provisions for Installation of Turbine Shaft Displacement and Differential Expansion Protection Device
25. Steam Turbine Implementation Record Form of Mandatory Provisions for the Installation of Emergency Interrupting Devices
26. Implementation Record Form of Mandatory Provisions for the Installation of Steam Engine Electric Overspeed Protection Devices
27. Mandatory Provisions for the Installation of Steam Turbine Low Oil Pressure Protection Devices Implementation Record Form
28. Implementation Record Form of Mandatory Provisions for Turbine Protection Device Installation
29. Implementation Record Form of Mandatory Provisions for Turbine Protection Device Installation Information
30 .Execution record form of mandatory provisions for the installation of oil drain pipes in accidents of steam engine oil tanks
31. Implementation record form of mandatory provisions for installation of gasoline engine oil pipelines and valves
32. Mandatory connection between turbine cylinder and pipelines Record form for the implementation of mandatory provisions for turbine body pipeline installation
33. Record form for the implementation of mandatory provisions for turbine body pipeline installation
34. Record form for the implementation of mandatory provisions for hydraulic pressure testing of auxiliary equipment
35. Implementation Record Form of Mandatory Provisions on Tank Anti-corrosion and Closure
36. Implementation Record Form of Mandatory Provisions on Turbine Generator Unit Commissioning Quality
Part Three? Implementation of Mandatory Provisions Checklist
1. Preparation of mandatory provisions before installation of turbine generator body and implementation of mandatory provisions
2. Preparation of foundation and mandatory configuration of horn (block) before installation of turbine generator Checklist for the implementation of mandatory provisions for the metal technical supervision of turbine-generator unit parts
3. Checklist for the implementation of mandatory provisions for the metal technical supervision of turbine-generator unit parts
4. Inspection of the implementation of mandatory provisions for the turbine body installation project Table
5. Checklist for the implementation of mandatory provisions for the installation project of regulating and lubricating oil system equipment
6. Checklist for the implementation of mandatory provisions for the installation project of generators and exciters
7. Checklist for the implementation of mandatory provisions for the installation of auxiliary equipment
8. Checklist for the implementation of mandatory provisions for turbine adjustment, start-up and trial operation
Part 4? Mandatory provisions Execution summary table