In today's society, people pay more and more attention to contracts, and the legal effect of contracts is increasing day by day. When an agreement is reached, they can enjoy certain freedom of contracting. Then do you know the format of the contract? The following is a sample of carport construction contract I collected for you (5 copies in total). Welcome to share.
Carport construction contract 1 Party A:
Party B:
In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness and good faith, both parties reach an agreement on this project and conclude this contract.
I. Overview of the Project
Project name: 1 Bridge and Bridge 6 Pile Foundation Project
Project location: Huaibin County, Henan Province
Project contracting scope: bored piles for bridge pile foundation engineering.
Second, the rights and obligations of both parties
1. Party A's work
1. 1 Provide Party B with a construction site with construction conditions.
1.2 Provide Party B with design drawings and technical disclosure.
1.3 is responsible for providing qualified concrete and transporting it to the pile mouth, and providing crane to pour concrete.
1.4 is responsible for providing electricity and water for site construction.
1.5 is responsible for providing transportation equipment such as excavators, cranes and loaders for Party B's free use.
1.6 be responsible for coordinating the relationship between the owner, the supervisor and the local authorities, and bear the requisition cost of the temporary land for construction (including the mud pit discharge site).
1.7 is responsible for controlling the survey and organizing the acceptance of the completed project in time according to regulations.
1.8 Provide cranes and machinery for Party B's entry, transition and evacuation free of charge.
2. Party B's work
2. 1 Be responsible for manufacturing, burying and dismantling steel liners.
2.2 rig installation, drilling and concrete pouring.
2.3 Be responsible for mud preparation and discharge at the place designated by Party A. ..
2.4 Ensure safe production and civilized construction, and maintain Party A's good corporate image.
2.5 Party B shall carry out the construction in strict accordance with the construction specifications and approved construction organization design.
2.6 Absolutely obey the management of Party A, actively organize production in strict accordance with the construction period required by Party A, and ensure timely delivery.
2.7 Be responsible for providing enterprise production qualification and qualification certificates of relevant personnel.
2.8 Carry all kinds of mechanical equipment and lighting equipment for construction at night required by the construction site.
Third, the project quality and progress
1. The qualified rate of pile foundation engineering is 100%.
2. Party B shall organize equipment and tools to enter the site for construction according to Party A's schedule, and Party A shall be responsible for the quality problems caused by Party A's material supply; Party B shall be responsible for the quality problems caused by Party B's construction.
IV. Contract Price and Payment Method
1. This project is contracted at the unit price. The unit price is:
1. 1 pile foundation diameter 1.2m Calculated according to the designed pile length, it is two hundred and thirty yuan per meter (230 yuan).
1.2 fabrication, processing and installation of steel bars is 600 yuan per ton (600 yuan).
1.3 The detection tube is calculated as 2 yuan per meter.
2. Payment method
After the pile foundation project is completely completed, Party A shall pay Party B 60% of the total project cost, and the remaining 40% of the labor cost and quality guarantee shall be paid within one week after the pile inspection is qualified. Party A pays relevant expenses to Party B, and Party B does not issue receipts.
Verb (abbreviation of verb) engineering safety
In the construction project, Party B shall be responsible for any work-related safety accidents. Other unfinished matters and geological conditions are inconsistent with the drawings. , should be agreed by both parties, the dispute should be resolved through consultation.
6. This agreement is made in duplicate, one for each party, and shall come into force after being signed by both parties. When Party A and Party B have fulfilled all their obligations under this contract and paid the settlement price for completion, this contract will be terminated.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Owner's Contract 2 for Garage Construction: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, following the principles of equality, voluntariness, fairness, honesty and credit, and on the basis of equal consultation between the two parties, in order to further clarify the rights and obligations of both parties in this project construction and successfully complete this project, both parties signed this project contract.
I. Overview of the Project
Second, the way of contracting: contracting in square meters (contracting without materials)
1. Party A is responsible for paying taxes and various management fees, and providing sporadic consumable materials such as steel bars, concrete, red bricks, sand and gravel, roofing tiles, waterproof materials, installation materials, scaffolding, templates, etc. , including on-site safe electricity use and temporary water use.
2. Party B shall provide labor and technology, including auxiliary equipment such as construction tools and mechanical equipment.
3. Project content: civil works, indoor and outdoor simple decoration, installation works and outdoor fences within the scope of the drawings, and all labor services (including waterproof works, roofing, doors and windows, plastering of internal and external walls, mechanical earthwork excavation and backfilling, electroslag pressure welding of wall column reinforcement, wires and sleeves, etc.) occurring in the project construction and construction site. Party B shall not charge any fees for the above subcontracted projects.
4. Contract fee: calculated according to the drawing construction area and 20__ construction project quota calculation rules, and the foundation and roof are not included in the construction area. The unit price is 240 yuan/㎡, and the contract cost is calculated according to the actual construction area of the project completion settlement.
5. Time limit: the time limit is days. Party B must strictly obey Party A's instructions and complete the task on time according to the time limit specified by Party A. ..
An intransitive verb is a mutually agreed job.
1. On the premise of earnestly performing the contract, Party B must obey Party A's unified coordination, unified instructions and unified management, cooperate with each other, support each other and trust each other, and the local interests are subordinate to the overall interests, and everything should proceed from the overall situation to ensure the normal implementation of Party A's projects.
2. When pouring concrete on site, technicians must stick to the site. If it is found less than once, 500 yuan will be fined (if you need to relieve yourself and have a meal, you should consult with the station supervisor, and two people can rotate, but one person must be present).
3. Party B must attend relevant engineering meetings organized by Party A and the chief supervision engineer on time. According to the construction drawings, overall design description, drawings disclosure, minutes of the blue prints.the design, design modification or change notice and current construction technology acceptance specifications, do a good job of self-inspection, mutual inspection and handover inspection, and submit for inspection and sign according to the supervision standard procedures.
4. Do a good job in construction management, keep the site clean and the roads clear, and clean up the site after work. Manage the site according to the Management Measures for Safe and Civilized Construction of Construction Projects in Henan Province, and give a warning and pay Party A a penalty of 500 yuan/time if the materials are piled up in confusion, the roads are blocked, the drainage is unorganized and the site is not cleaned in time.
5. Party B shall do a good job in civilized construction according to the regulations of Inner Mongolia Autonomous Region on civilized construction.
6. In the process of construction, if it is found that the engineering quality of a certain shift of the construction team does not meet the specification requirements or the progress of the project is slow, Party A has the right to order Party B to change the construction team. Party B must replace it within three days after receiving the notice.
7. What Party A should do:
1) technical disclosure, inspection of all kinds of raw materials, data arrangement, and lofting of main control lines on each floor.
2) Solve the peripheral key relations and be responsible for coordination with various functional departments.
3) Management of Party A's mobilization materials ..
7. Project quality: qualified project.
1. The evaluation of engineering quality is based on the national quality inspection evaluation standards and the standards of Inner Mongolia Autonomous Region.
2. If the quality is unqualified due to Party B's reasons, Party B shall unconditionally repair it until it is qualified, and shall be responsible for compensating the losses caused to Party A..
3. Party B shall bear the amount of work that causes Party B to exceed the scope of design drawings and rework due to Party B's reasons.
Eight. Payment method:
Each project payment must be approved by Party A's project technical director and project manager (the project quality and time limit for a project must meet the standards agreed in the contract). If Party B's construction quality is not up to standard or the construction period is not in conformity with the contract, Party A has the right to refuse to pay the project funds, and pursue Party B's relevant responsibilities in this contract in accordance with relevant state regulations. From the date of signature, the longest project payment paid to Party B shall not exceed 10 days (excluding public holidays).
Nine, safe and civilized construction
1. Party B shall meet the standards of safe and civilized construction in accordance with the Municipal Administrative Measures for Civilized Construction of Building Projects and the Inspection Standards for Safe Construction of Buildings of the Ministry of Construction. Party B shall take strict and scientific safety protection measures to ensure the safety of construction workers and third parties, and bear all losses caused by its own ineffective safety measures. All personal injuries and deaths in the construction process shall be borne by Party B, and Party A shall not be held responsible.
2. During Party B's construction, scaffolding and guardrails shall be erected according to the requirements of national codes, and the construction shall meet the requirements of national safety codes. If Party B violates the safety construction regulations, Party A has the right to require Party B to stop work and compensate Party A 1000-20 yuan for the liquidated damages according to the seriousness of the violation.
X. termination of the contract
In addition to the relevant provisions of the state, the following provisions are added. In case of any of the following circumstances, Party A may unilaterally terminate the Contract:
1, expressly or by one's own actions, failing to perform the main obligations of the contract;
2. It has not been completed within the time limit agreed in the contract, and it has not been completed within five days from the date of Party A's reminder;
3, the quality of the completed project is unqualified, and refused to repair;
4. Subcontract or subcontract the project without Party A's consent.
XI。 Order of effectiveness of contract
1. If the construction documents are unclear or contradictory, the relevant documents, agreements, emails and other written words with the signing date later shall prevail.
2. Matters not covered in this contract shall be subject to relevant national laws and regulations.
Twelve. Industrial injury insurance: Party A is responsible for handling industrial injury insurance for employees. All casualty accidents shall be handled by the insurance company, and Party B shall be responsible for the part that exceeds the insurance regulations and does not pay compensation.
Thirteen. Other matters not covered shall be settled by both parties through consultation. If negotiation fails, the case shall be submitted to the labor department for arbitration and settled by the court. Both parties agree that if the lawsuit is settled, the jurisdiction shall be the jurisdiction of the people's court where the project is located.
14. This contract is made in quadruplicate, two for Party A and two for Party B, and shall come into effect after being signed and sealed by both parties.
Fifteen. guarantee
The warranty period is _ _ _ _ _ _ years from the date when the project is completed and accepted, meets the contract requirements, and all the engineering data are handed over. During the warranty period, Party B shall guarantee and bear all expenses, except for non-human and mechanical and external factors.
This contract is made in quadruplicate, with Party A and Party B holding two copies respectively, and it will come into effect after both parties agree to sign and seal it.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Carport Construction Contract 3 Party A: (full name) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B: (full name) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
In accordance with the Contract Law, the Construction Law and relevant laws and regulations, and following the principles of equality, voluntariness, honesty and credibility, the two parties have reached an agreement on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Chapter I, Projects
1. 1. Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
1.2. Project location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
1.3. Project content: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
1.4. Contract scope: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 1: Work content
Construction must be carried out in accordance with the requirements of the drawings. If the drawings do not indicate that the construction should be carried out in accordance with the requirements of national codes, the acceptance in accordance with the requirements of codes shall prevail.
2. 1, contract method:
(1) Party A is responsible for contracting construction water and electricity. The salary and welfare of the contractor, the safety of the contractor, the construction period of the contractor, the quality of the contractor, the civilized construction of the contractor and the acceptance of the contractor.
Article 2: Contract Method and Contract Unit Price
2.2 contract unit price
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 3: Term of Contract
3. 1. The term of this contract is _ _ _ _ _ _ _ _ _.
Article 4: Method of Payment
4. 1. Payment of contract money: Party B is responsible for the payment of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 5: Responsibilities of both parties
5. 1 Party A's responsibilities
(1) Pay the project payment to Party B according to the contract.
(2) Responsible for arranging relevant personnel to solve problems in construction and confirm the quantities.
5.2 Party B's responsibilities
(1) is responsible for the management of safety, quality and civilized construction, and undertakes relevant responsibilities such as quality, schedule, cost, production safety, construction risk and civilized construction within the scope of the contract to ensure construction safety. In case of safety and quality accidents during construction, all responsibilities and losses caused thereby shall be borne by Party B. ..
(2) Party B shall be responsible for any accidents such as accidents and riots during the transportation of materials.
(3) On-the-job workers of Party B must maintain public order at the construction site. Stealing, gambling and fighting are strictly prohibited. In case of the above situation, Party A has the right to repel Party B, and the remaining project funds will not be settled; If there are illegal acts, they will be sent to the public security organs for handling, and criminal responsibility will be investigated if the circumstances are serious.
(4) During the construction, Party B must safely obey the reasonable management of construction quality, progress and safety by Party A's on-site management personnel.
(5) During the construction period, Party B shall take full responsibility for work-related injuries, patients, casualties and accidents of Party B's personnel.
(6) Party B shall take necessary safety protection measures according to regulations, equip workers with safety helmets and safety belts, and take protective measures to provide workers with necessary labor protection articles. If the above safety measures do not meet the specification requirements, Party A has the right to impose a fine of RMB 65,438+000 per person. If it reaches 10 times or more, Party A has the right to clear Party B without settling the remaining project funds.
(7) All workers of Party B must hold legal post operation certificates and provide a copy of each worker's ID card.
(8) Party B must buy corresponding insurance for all workers.
(9) Ensure that sufficient workers are arranged for construction according to Party A's requirements. Otherwise, Party A has the right to invite other construction teams to carry out construction. After normal construction, Party B must have more than 40 workers on site.
(10) Party B must clean up the site during the construction. If there are complaints from the masses, it will be fined 100 yuan each time.
Article 6: Settlement of disputes
6. 1. In case of production disputes or matters not covered in this contract, both parties shall settle them through friendly negotiation and sign a supplementary contract.
6.2 If negotiation fails, it shall be submitted to Guangzhou Municipal Re-commission or the people's court where the project is located for litigation.
Article 7. The number of copies of the contract and its effective date
7. 1. This contract is made in duplicate, one for each party, with the same effect.
7.2. This contract was concluded on _ _ _ _ _ _ _ _ _ _ _ _. Place of signing the contract: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
7.3, technical requirements:
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
4 Party A's (full name) carport construction contract:
Party B (full name):
Through negotiation between Party A and Party B, Party A subcontracts the hydropower installation service of Jinzhai Xizhuang Hot Spring Club Project to Party B for construction. In order to clarify the responsibilities, rights and interests of Party A and Party B, and ensure the quality, progress, safety and civilized production of the project, this contract is specially concluded for both parties to abide by and implement.
I. Overview of the Project
Project name:
Scope of work: subdivisional work
Duration:
Second, the way of contracting and charging standards
1. Contract settlement method: Subcontract the construction to Party B by contracting or not, and calculate the settlement according to the actual site area (calculated according to the projected area in the suite).
2. Contract price:
(1) Installation unit price of water, electricity and weak current:
◇ Fine decoration indoor water and electricity installation project: _ _ _ _ _ yuan /m2, and the unit price includes all fixed procedures (positioning, slotting, pipeline installation, bottom material installation, pay-off, debugging, switch panel installation, sanitary ware installation, faucet installation, garbage removal, material transfer, mortar mixing, slotting, wiping, etc. , but excluding the miter ladder and movable frame, all other tools shall be provided by Party B.).
(2) Unit price of main bridge:
◇ Main bridge installation works for indoor fine decoration: bridge _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
◇ The above unit price is the unit price for the project quality to reach the qualified standard. The engineering quality standard is subject to the current national and Anhui construction acceptance specifications, and meets the requirements of the quality supervision department of the project department and the superior inspection and supervision department. If the construction quality cannot meet the qualified standard, it must be reworked to the qualified standard. In addition to all materials and labor costs for rework, Party A has the right to impose additional economic penalties on Party B as appropriate. If the safe and civilized construction does not meet the requirements, it shall be rectified at its own expense until it is qualified; The rework caused by the quality problems of materials provided by Party A has nothing to do with Party B. ..
◇ The unit price includes the employee work-related injury insurance paid by Party B. (If Party B has not purchased work-related injury insurance, the accident has nothing to do with Party A.. )
◇ The unit price includes employee personal income tax paid by Party B. ..
(3) Calculation standard of quantities:
◇ The unit price per square is calculated according to the indoor projection area, and the unit price per meter is calculated according to the cable laying length.
◇ The above is the comprehensive unit price of all work, and Party A will not bear other extra expenses; If the content is not detailed, both parties shall settle it through consultation.
Third, the project audit and payment
1. Party B shall apply to Party A's on-site project manager for the progress payment form according to the actual construction completion of the project. Party A's project manager shall complete the review five working days ago, and the company's competent manager shall complete the review before 10 as the basis for the progress payment. On-site rewards and punishments related to quality and safety shall be paid every time you apply for progress payment.
2. Every time Party B applies for progress payment, it shall pay 70% of the completed works according to the actual construction situation.
3. After Party B's project is completed, it will be paid to 85% of the total project cost after preliminary acceptance by Party A, 97% of the total project cost after acceptance by the owner, and the remaining 3% will be warranty money.
4. Party B shall provide the team payroll and personal signature when collecting the service fee. (for the company's financial bookkeeping).
Fourth, the project warranty gold and warranty period
1. Project warranty: 3% of the total settlement price of the decoration project is used as the project quality warranty, which will be returned without interest after deducting relevant expenses during the warranty period.
2. Warranty period: The quality warranty period is one year from the date when the project is completed and accepted by the owner.
3. During the warranty period, in case of engineering quality problems requiring maintenance, be sure to be present for treatment within three days after receiving the maintenance notice; Otherwise, Party A has the right to entrust others to enter the site for maintenance, and the related maintenance expenses incurred shall be deducted from the warranty fund.
Verb (abbreviation for verb) The responsibilities and rights of both parties.
1. Party A is equipped with management personnel, who are responsible for the preparation of schedule and construction scheme, the supply and scheduling of materials and equipment, and the timely technical disclosure of construction safety.
2. Party A is responsible for providing Party B with the construction site and other convenient conditions for construction operations, and providing Party B with accommodation.
3. Party B must set up a diligent and systematic management team according to the construction tasks and technical requirements provided by Party A, and be equipped with a sufficient number of skilled professional teams to work in one or two shifts. Party A has the right to ask Party B to dismiss or replace unsuitable workers and teams;
4. Party B's construction personnel shall meet the reasonable schedule of Party A;
5. Party B shall provide professional construction machinery tools and machines, including table saws, chainsaws, electric drills and hammers.
6. Party B shall work overtime at night as required, and cooperate with various arrangements (safety, civilized construction, quality and progress) of the company's management personnel;
7. Party B has the obligation to cooperate with other teams in cross construction and provide them with working faces and other convenient construction conditions;
8. Party B shall consciously take care of other properties of Party A's construction site, such as machinery, tools and instruments, and have the responsibility to protect the finished products, semi-finished products and other labor achievements of this team and other teams. If there is any damage, Party B shall be investigated for relevant responsibilities, and Party B's construction site shall be cleaned in time after the work is finished;
9. When Party B enters the site, it shall declare the roster of workers and team leaders to Party A, and be responsible for handling the expenses of temporary residence permits or temporary accounts for workers according to the policy. Party A shall handle the licensing procedures uniformly. The household registration fee and temporary residence permit fee shall be borne by Party B. ..
10, Party B must obey the arrangement of Party A's management personnel in terms of safety, technology, progress, materials, labor and civilized construction. , to ensure that the site is cleared after work, in line with the civilized production requirements of the company; If Party B refuses or ignores Party A's civilized construction requirements, Party A may arrange other workers to complete the work, and the expenses shall be borne by Party B.. ..
1 1. Party B shall use materials reasonably and economically during the construction period. After Party B's materials enter the site, Party A shall send personnel to inspect the materials to ensure the quality of the materials and submit the materials inspection certificate.
12. If Party B's workers get sick, die or become disabled due to illness during the construction period, other expenses shall be borne by Party B. ..
Six, time limit for a project, quality and safety in production
1. Time limit for a project shall be issued by Party A to Party B according to the schedule (to meet Party A's requirement to speed up the work progress as required). If Party B's labor shortage and poor organization affect the construction period, Party A may impose economic penalties; If the construction period is delayed due to power failure at the construction site or the materials provided by Party A are not in conformity with E, it has nothing to do with Party B, and the construction period will be postponed; If Party B stops work for more than 3 times due to Party A's reasons, Party A will make up the work according to the actual situation.
2. If Party B can't increase the number of workers, Party A can contact other teams to enter the site for construction, and the resulting cutting costs (including extra costs) shall be borne by Party B. ..
3. Party B shall ensure that the project quality reaches the qualified standard. If Party B has quality problems in the construction process (but the quality problems of materials provided by Party A have nothing to do with Party B), Party A has the right to give economic penalties in addition to rework and compensation for material losses. In case of major quality accidents caused by Party B's construction technical problems, Party A has the right to terminate the contract and not settle the completed quantities of Party B to compensate for the losses.
4. Party B must carry out model construction before starting any subdivisional work. If the sample construction fails to meet the quality standards (or the standards agreed in the contract), Party B shall not proceed with the next construction;
5. In the process of construction, Party B shall accept the inspection of Party A at any time, and if it finds that the construction quality does not meet the requirements, it shall be rectified in time;
6. Party B shall earnestly strengthen the management of production safety to ensure that the target requirements of Party A's responsibility for production safety are met.
Seven. Public security civilization management
1. Party B shall take full responsibility for the safety of all its workers. In case of fighting or other criminal cases, the consequences have nothing to do with Party A. At the same time, Party A may impose economic penalties on Party B according to the provisions on safe and civilized construction and the direct or indirect losses caused by the perpetrators to the construction site.
2. Party B shall conduct on-site civilized education for workers, including regulations on cleaning, smoking and defecation in dormitory and construction site; If it happens, Party A can punish it according to the relevant provisions of the Regulations on Safe and Civilized Construction.
3. If the owner (Anhui Huilian Real Estate Co., Ltd.) fails to pay Party A's project payment in time, Party B shall not affect the project construction due to the project payment within 15 days, especially the incidents such as employee disturbances and petitions, and all economic losses caused thereby shall be borne by Party B; If it exceeds 15 days, Party A will find another way to pay the project money owed to Party B. ..
Eight. additional remarks
1, in principle, the construction team should complete all the work within the contract scope of the team. If it is really necessary to complete the work of other teams outside the contract (instructed by Party A's on-site project manager), Party B has the obligation to remind Party A's on-site engineers to clarify which team's responsibility scope is completed when handling the workload list. If in doubt, please consult Party A, otherwise 80% of the price outside the completed contract will be paid.
Nine. Matters not covered:
Matters not covered in this contract shall be settled by both parties through consultation.
X. number of copies of the contract:
This contract is made in quadruplicate, one for each party, with the same legal effect. It will take effect after being signed by both parties, and will automatically become invalid after the project is completed and the settlement money is paid.
XI。 Annex to the contract:
Provisions on safe and civilized construction
Party A: Party B:
Seal: seal:
Representative signature: Representative signature:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Garage Construction Contract 5 Party A: _ _ _ _ _ _ (hereinafter referred to as Party A)
Party B: _ _ _ _ _ _ (hereinafter referred to as Party B) Gender _ _ _ _ Resident ID number: _ _ _ _ _ _ _
In accordance with the Contract Law of People's Republic of China (PRC), the Labor Law of People's Republic of China (PRC) and other relevant laws and regulations, and following the principles of voluntariness, equality, fairness, honesty and credibility, both parties have reached an agreement through consultation to conclude this Contract.
Party A contracted the cement road project from Shushe Village, Longchang Town, Weining County, Guizhou Province to Party B, and reached the following points:
1. Party A will contract the shoulder and pavement concrete to Party B for construction;
2. Party B shall carry all power tools, transportation tools, truck stuffing and labor.
3. Quality requirements: C20 shoulder wall for concrete and C30 pavement. The shoulder wall is dense, full, smooth and flat, and the pavement is vibrated tightly, textured and cracked.
4. Contract unit price: the shoulder wall is calculated in cubic meters, with 85 yuan per cubic meter and pavement concrete (including electricity fee).
5. Payment method: 80% of qualified products will be paid every month, and the remaining 20% will be paid within 60 days after acceptance.
Responsibility of both parties of intransitive verbs: Party A shall ensure that the materials are in place and Party B shall be responsible for the construction. In the process of construction, if the quality is not up to standard, resulting in the loss of Party A's materials, Party B shall bear all the economic losses, and withdraw halfway, and withdraw according to 50% of the qualified ones.
Seven. Safety requirements: Party A shall not be jointly and severally liable for any safety problems arising from Party B's construction. Party B must take good care of the construction personnel, abide by the safety production regulations in the project construction, strictly organize the construction, accept the supervision and inspection of the safety inspectors at any time according to law, and take necessary safety measures to eliminate the hidden dangers of accidents. All safety responsibilities and expenses of Party B and other workers shall be borne by Party B. ..
Eight. Matters not covered in this contract and additional expenses incurred in the construction site shall be settled by both parties through consultation, and are not included in the scope of this contract. This contract is made in duplicate and shall come into effect as of the date of signing.
Party A (seal): _ _ _ _ _ _ _ _ _ _ Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Representative (signature): _ _ _ _ _ _ _ _ _ ID number: _ _ _ _ _ _ _ _ _ _ _ _ ID number: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
;