Party A (Owner): Zhang San
Party B (contractor): Li Si.
Number the unit quantity, unit price and price of the remark item.
1 The whole house is made of stainless steel anti-theft net, and the 302,206,600 square meters is made of 22x22 stainless steel square steel with a thickness of 0.8.
2. Plywood: the ceiling is 401506,000 square meters, with 5 mm plywood for the plane and 9 mm plywood for the facade. The splint is imported.
3. Brush the wall with imported ici brand latex paint, based on the square meter of XX04000 Shuangfei powder and cooked rubber powder, and then brush ici twice.
4 The floor is paved with domestic Foshan Eagle brand 600x600 wear-resistant bricks with a square meter of 60754800.
5. Master Room Wardrobe Project 140004000
Xialue
Supplementary terms:
1. Both parties agree that the construction period of this project is 40 days, except for water, electricity and force majeure. When Party A's funds are available, Party B will deduct three thousandths of the total project cost for each day of delay.
2. During the construction period, the fees charged by the management organization shall be paid by Party A, except fines.
3. Where Party B made a mistake under the guidance of Party A and was punished by the administrative organ, Party A shall compensate for it.
4. Items that damage the interests of Party A due to cutting corners or incorrect versions of goods shall be dismantled and redone.
This contract is made in duplicate, one for each party, with the same legal effect. New projects should be signed separately.
Party A (signature): Party B (signature):