Dangerous Building Renovation Agreement_2017 Dangerous Building Renovation Agreement Sample

Agreement is a written material signed by two or more parties in social life after mutual consultation and consultation to protect their respective legitimate rights and interests. Then Do you know how to write a sample agreement for the renovation of dilapidated buildings in 2017? Below is a sample agreement for the renovation of dilapidated buildings in 2017 that I compiled for you. I hope it will be useful to you!

2017 Sample Agreement for Renovation of Dilapidated Houses 1

Party A (Township People's Government): Party B (Head of Household):

In order to ensure that the dilapidated building renovation task is completed on schedule with quality and quantity, in accordance with the spirit of relevant national, provincial, municipal and district documents and requirements, following the principles of equality, voluntariness, fairness and trustworthiness, the following agreement has been reached through negotiation between Party A and Party B, and *** both abide by it:

(1) Rights and responsibilities of Party A

1. Provide Party B (the demolished and rebuilt household) with a design atlas (plan) for the renovation of dilapidated buildings. The construction drawings must meet earthquake resistance and energy-saving requirements. Organize professionals to review Party B's own construction plan for reconstruction, repair and reinforcement.

2. Provide technical guidance to Party B, conduct quality and safety inspections, and inspect and supervise the progress of the project. Correct problems promptly if problems are discovered.

3. Responsible for the preliminary acceptance work after the renovation of the farm house is completed, and submit an acceptance application to the superior.

4. Responsible for allocating the bonus and subsidy funds to Party B after Party B passes the inspection and acceptance of the renovated house and demolishes the old house.

(2) Rights and responsibilities of Party B

1. Provide relevant information to Party A.

2. Construction shall be carried out according to the dilapidated building renovation design drawing (plan) provided by Party A. The construction plan for self-renovation and reinforcement shall be submitted to Party A for review. Off-site reconstruction should be built to the planned point according to Party A’s requirements.

3. The building area of ??demolished and rebuilt houses must be strictly controlled at 40-60 square meters per household (can be adjusted appropriately according to the family population); to meet the structural requirements, ring beams, structural columns, and tensioning must be set as required. Reinforcements are formed to ensure that the earthquake-resistant fortification and standard of 6 degrees are achieved. Newly built houses must meet living requirements, have water and electricity installed in place, walls and ceilings whitewashed, and maintenance structures such as roofs, doors, and windows in place. Repairing and strengthening houses mainly involves repairing walls, roofs, and beams and columns based on actual conditions to ensure that the main structure meets the requirements for safe living and use.

4. Select qualified construction companies or trained and qualified construction craftsmen to undertake the task of renovating dilapidated buildings, and urge them to carry out construction in accordance with mandatory engineering construction standards. Be responsible for construction safety and quality. Building materials must comply with national standards, and local materials should be used as much as possible to save costs. The construction of temporary buildings such as color steel houses is strictly prohibited.

5. Complete the renovation work according to the agreed renovation period to ensure that the project is completed as scheduled and the new house is moved in. If the project is not completed on time, 100 yuan per day will be deducted from the dilapidated building renovation subsidy fund for the delay.

6. Accept Party A’s technical guidance and proactively cooperate with Party A’s inspection of project progress, quality and safety. Responsible for rectification of quality and safety issues.

7. To build a new house in a new location, the old house must be demolished and returned to the land on January 1, 2012 to ensure that one house has one house. Take responsibility for safety when demolishing an old house. If the old house is not demolished on time, Party A will stop allocating incentives and subsidies for the renovation of dilapidated houses.

8. Cooperate with the acceptance work of the house renovation project. If the acceptance fails, Party B’s reward and subsidy funds will be cancelled. 6. This agreement is made in triplicate. Party A and Party B each hold one copy, and the district rural dilapidated house renovation leading group office records one copy. If it is not stamped with the contract record seal, it will be invalid.

Party A (official seal): Party B (signature):

Year, month, day

2017 Dangerous Building Renovation Agreement Sample 2

Party A: Village Committee

Party B:

The renovation of dilapidated buildings is an important national project to benefit the people, ensuring that the project plays a real role in benefiting the people. Ensure high standards, high quality and timely completion of tasks. After negotiation between Party A and Party B, the following agreement was reached:

1. Party B will find its own construction team to carry out the construction.

2. Party A must provide coordination services for Party B.

3. Party B shall design and construct in accordance with the standards specified by Party A.

The specific standards are that the building area of ??the third type of households is 40 square meters and shall not exceed 60 square meters; the general building area of ??newly built households is 60 square meters and shall not exceed 80 square meters; the floor beams and upper beams of renovated households must be built, and the exterior walls must be plastered with plasterboards. Paint, install security doors, plastic steel windows, ridged roofs, and single-piece colored steel tiles are not allowed; maintenance households must replace doors and windows, roofs, and external wall insulation.

4. Collection of security funds. Before the start of construction, Party B shall pay a security deposit to Party A, the renovation household shall pay 2,000 yuan, and the maintenance household shall pay 1,000 yuan. Return to Party B after passing the inspection.

5. If Party B does not construct according to Party A’s regulations, Party A will not apply to the superior for acceptance.

6. This agreement is made in duplicate, with Party A and Party B each holding one copy.

Party A:

Party B:

Month, Day, 2013