Supervision units refer to supervision companies, supervision firms and units undertaking engineering design, scientific research and engineering construction consulting of supervision business.
Enterprise qualification certificate actually refers to the certificate that an enterprise has the ability to complete a project. Taking construction enterprises as an example, according to the Regulations on the Administration of Qualification of Construction Enterprises, construction enterprises should apply for qualification according to their registered capital, net assets, professional and technical personnel, technical equipment and completed construction performance, and only after passing the examination can they engage in construction activities within the scope permitted by their qualification grade.
Construction organization design is a comprehensive technical and economic document used to guide construction organization management, construction preparation and implementation, construction control and coordination, resource allocation and use, and it is an important means to scientifically manage the whole process of construction activities. By compiling the construction organization design, we can aim at the characteristics of the project, according to the specific conditions of the construction environment and according to the objective construction laws.
The construction scheme is the implementation scheme specified in the construction project. Including the organizational structure (the composition of each functional organization, their respective responsibilities and relationships, etc.). ), personnel composition plan (project leader, heads of various institutions, heads of various disciplines, etc.). ), technical scheme (schedule, key technical scheme, main construction step plan, etc. ), safety scheme (overall safety requirements, analysis of construction risk factors, safety measures, safety plan for main construction steps, etc. ) and material supply scheme (material supply process). The construction scheme is determined according to the project. Some projects are simple, and the construction period is short, so there is no need to make complicated schemes.