Current location - Quotes Website - Signature design - Definition of emergency repair
Definition of emergency repair
The so-called accident repair,

Refers to equipment failure,

There is still room for further development and change.

Can, or have serious consequences, must be dealt with quickly, eliminate hidden dangers, restore stability.

Emergency maintenance work status.

1

Electrical equipment needs to be repaired quickly after an accident or obstacle is forced to stop.

Work.

2

Electrical equipment has no accident obstacles, but the places where accidents may occur are not treated immediately.

Management work.

three

Although there is no accident in the equipment, if it is not handled immediately, it may endanger people and equipment.

Or the safe operation of the system.

Principles to be followed in using emergency maintenance orders;

1

The workload of emergency repair is not large, the time required is not long, and the safety measures are not complicated.

2

After the failure, the equipment was seriously damaged, and it was impossible to restore the equipment to a good state in a short time.

State time,

The emergency repair task of the emergency repair list is limited to restoring the equipment to a stable state.

that

Follow-up work should be transferred to normal processing work (processing working ticket)

three

The use of emergency repair sheet only simplifies the procedure,

But it can't simplify security measures.

Article 115

The emergency repair list shall be in a unified format.

Name package of emergency maintenance order

Including the full name of the equipment operation management unit.

For example:

Chongqing Shapingba power supply bureau accident emergency repair

Single.

Article 116

"Work unit" column:

Fill in the full name of the superior unit where the repair team is located.

Article 1 17

"Number" column:

The emergency repair order shall be continuous and unique according to the type number.

Determined by the licensing unit according to the specific words.

(Rob)

, year, month, day and serial number, the number should include specific words, year, month,

The date and serial number consist of three parts.

For example:

220 kV

Dongxin village substation approval

2008

year

12

moon

15

Riddy

1

Share one thing

So the emergency maintenance order number is: grab.

Article 118

"Emergency repair person in charge (guardian)

"Team" column:

"Emergency repair person in charge (guardian)

"column:

Refers to the person in charge (guardian) of emergency repair work.

. When multiple classes work together, the work is negative.

The person in charge refers to the general person in charge.

2

"Team" column:

Refers to the team involved in the emergency repair work, and the full name should be filled in. Such as: Line Maintenance Class Two. Ruoduo

If the team works together, the full name of the person in charge of the team work should be filled in.

Article 119

"Working class personnel" column:

The total is in

10

People and below should fill in their names one by one;

10

Working in a group of one or more people,

Fill in the names of the main staff of each team and write them in full.

10

Write "wait * * * *" after the person.

First two

O

deprive

"Emergency repair task (emergency repair location and emergency repair content)

"column:

Fill in the repair location, repair equipment name and repair content.

Article 12 1

"Safety measures" column:

According to the arrangement of the emergency repair headquarters,

Field working conditions and equipment conditions,

Fill in the corresponding

Safety technical measures,

Clear the scope of power outage.

Safety measures should meet the needs of emergency repair work.

Prevent accidents from expanding due to imperfect safety measures.

Article 122

"Repair the remaining live parts or matters needing attention" column:

Identify live parts reserved for emergency maintenance equipment and adjacent live equipment.

Yeah, what might happen?

We should pay attention to and prevent the development trend and consequences of accidents.

Article 123

"Confirm signature" column:

After confirming the emergency repair task, safety measures, live parts and precautions, fill in

Write the signatures of the person in charge of emergency repair and the person in charge of emergency repair.

Article 124

"Supplementary safety measures after site investigation" column:

Person in charge of maintenance work,

The commander or operator repairs the work site.

Investigation,

Complement and improve the safety measures that do not meet the working conditions.

Supplementary measures must be approved.

It can only be carried out with the consent of the dispatcher or the operation attendant. Those who meet the "safety regulations" are

Customs regulations.

Safety measures in substations should be carried out by operators,

Line maintenance work

Safety measures shall be implemented by the staff after being approved by the dispatcher on duty.

Article 125

"Repair Work Permit" column:

Licensor shall sign and agree after confirming the completion of all the above safety measures.

Allow emergency maintenance work to start.

Let's begin.

Emergency repair work of substation,

Licensor shall explain the scope of work to the personnel in charge of emergency maintenance.

Location,

Location of live equipment and live running parts and matters needing attention in work.

Xuxian line

The person in charge of emergency maintenance can fill in the signature, but (telephone number) should be added after the licensor.

, form

Display phone permission.

Article 126

"Emergency Repair End Report" column:

1

The maintenance work has ended or come to an end, all personnel are evacuated from the site, and the material workers.

After cleaning, the personnel responsible for emergency repair shall report to Licensor, explaining the work content and equipment.

Shape,

Found the problem,

Test results,

Existing problems,

Whether there are safety measures on site,

End of emergency maintenance order.

2

The person in charge of the emergency repair work in the substation should also fill in relevant records.

Record,

And carry out on-site inspection together with the operators,

Confirm the equipment status,

State,

The status of security measures,

Fill in the end time. Once the work is completed, no staff member is allowed to enter the work site.

three

After the emergency repair order is completed, the operator will add it to the work order number.

Stamp "Executed" and leave the workstation for storage. The line repair sheet shall be kept by the repair unit.