Chapter I General Principles
Article 1 These Provisions are formulated in order to strengthen the management of oil production, improve the time limit for well opening, maximize the production potential of oil wells and arouse the enthusiasm of every employee.
Article 2 These Provisions shall apply to oil and water wells under the jurisdiction of drilling and production sites.
Chapter II Management Network and Division of Responsibilities
The third oil production management network diagram
Article 4 Division of responsibilities
The engineering department is the competent department of oil production in the drilling and production department, and its main responsibilities are:
1, responsible for oil production management.
2. Be responsible for the formulation and implementation of various management systems for oil production.
3. Be responsible for the preparation and implementation of oil production engineering scheme and technical measures scheme for oil and water wells.
4. Responsible for the drafting, inspection and assessment of production indicators of the oil production team.
5. Responsible for HSE management of petroleum production.
6, responsible for the static and dynamic analysis of oil and water wells, and put forward reasonable improvement measures of oil and water wells.
7, responsible for the organization and management of new well production.
8. Be responsible for on-site supervision of key processes such as oil well operation and fracturing.
9. Be responsible for the popularization and application of new technologies and processes for oil recovery.
10, responsible for the preliminary examination, project establishment, acceptance and signing of contract terms of oil production projects.
1 1, responsible for the acceptance and confirmation of the workload in the construction power of attorney.
12, responsible for the collection, collation, review and reporting of oil production engineering data.
13, responsible for oil production technology training.
Oil production team is the grass-roots organization of oil production management, responsible for the specific implementation of oil production work. Its main responsibilities are:
1, responsible for the daily management of oil and water wells under its jurisdiction.
2, responsible for establishing and perfecting the rules and regulations of the oil production team.
3, responsible for the production team management and the implementation of various business indicators.
4, responsible for the inspection and assessment of production wells (Taiwan).
5, responsible for the safety management of oil production equipment and personnel.
6. Be responsible for the formulation and implementation of five small measures for oil wells.
7. Be responsible for sorting, preliminary examination and reporting of oil well data.
8. Be responsible for the normal maintenance of oil production equipment.
9. Be responsible for the management of pumping wells, ensure pumping as planned, and ensure that the water content of crude oil is within the specified range.
10, responsible for technical training of oil producers.
Chapter III Management of New Wells
Article 5 The oil production team shall be equipped with oil production workers with high quality and strong sense of responsibility to look after the new well (platform), and designate special personnel to be responsible for the equipment operation and casing gas control of the new well every day.
Article 6 Before starting the pump in a new well, the cadres of the oil production team must personally check and implement the fastening and lubrication of all parts of the pumping unit, and check the completeness of the wellhead and supporting technology. The well can't be started until everything is ready.
Article 7 After pumping a new well, the well shall not be stopped at will, so as to discharge fracturing fluid as soon as possible and reduce the damage of fracturing fluid to the formation.
Article 8 In order to maintain formation energy and make full use of casing gas, it is forbidden to discharge casing gas at will.
Article 9 After an oil well is put into production, carefully observe the fluid drainage of the new well, clearly record the oil breakthrough time, fluid production and water cut changes, and obtain wellhead pressure data.
Article 10 The oil production team should explore the relationship between casing pressure and oil well production, and control the casing pressure within the maximum production range.
Article 11 The oil production team must conscientiously implement the above provisions. If losses are caused by violation of the above provisions, the oil production team and oil production workers will be punished.
Chapter IV Provisions on Data Access
Article 12 The contents to be filled in the Oil Production Handover Report include: well number, production horizon, date, working system, casing pressure, current, liquid level, converted liquid volume, start and end time of drainage, start and end liquid level of drainage, converted oil volume, reasons for well shutdown, electric meter reading, electricity consumption, signature, etc. Workers on duty are required to fill it out every 4 hours, and it is not allowed to advance or lag behind. Otherwise, 5 yuan will be fined for each advance and delay 1 hour.
Article 13 Fill in the comprehensive record of oil production: well number, date, horizon, interval, thickness, number of layers, production date, pump depth, production time, working system, daily (monthly) liquid production, daily (monthly) gas production, daily water production, water cut, pumping, oil-gas-water analysis, current, dynamic liquid level and power.
Article 14 Instructions for filling in data
1. Work system, production date, horizon, interval, thickness and number of layers shall be subject to the summary of operation completion.
2. The production time should be recorded according to the actual well opening time, accurate to 0.5 hour (rounded off). When stopping the well, the reason and start-stop time should be recorded.
3. Measure the stroke and stroke times once a month, and the stroke is accurate to 0.1m.. Measure the number of trips for 3 minutes, average them and round them to the nearest integer; The casing pressure and back pressure are accurate to 0. 1Mpa, and the current is accurate to1a.
4. The daily liquid production is calculated according to the measured tank surface rise of not less than 4 hours, accurate to 0.1m3; ; The determination of water content should be carried out on-site sampling or testing. Daily oil production and daily water production shall be accurate to 0.1t.
5. Fill in the oil pulling situation with the actual oil pulling amount.
6. The indicator diagram and liquid level of normal production oil wells are measured once a month and once a week after completion. The wells with abnormal fluid production should be diagnosed in time, and the above situation should be reflected in the comprehensive record.
Article 15 Requirements for reporting statements
1. The handwriting in the report must be neat and clear, and shall not be altered at will.
2, can only use one color to fill in (ballpoint pen or pen), can't use red pen or pencil. Words with the same data cannot be replaced by ellipsis.
3. 5 yuan will be fined for irregular declaration or incomplete data.
Article 16 Provisions on the Admission of Special Well Data
1. New well commissioning: according to the situation, production data such as liquid production, oil production, water cut and casing pressure. Record in an encrypted way and report problems in time.
2, completes the quality supervision in the operation, to stop the violation, each working procedure records clearly.
Article 17 The oil production shift report shall be filled in by the oil production workers, and the comprehensive oil production record shall be filled in by the oil production team or the engineering department.
Chapter V Management of Oil Production Equipment
Article 18 Oil production equipment shall be inspected regularly according to the patrol inspection system, and problems found shall be rectified in time, and problems that cannot be rectified shall be reported in time. When the maintenance personnel carry out rectification, the personnel on duty should actively cooperate.
Nineteenth new installation (rectification) of pumping units, oil storage tanks, supporting technology, etc. The personnel on duty shall conduct encryption inspection within 24 hours, and rectify and report the problems in time. After the pumping unit has been running for 24 hours, tighten the bolts and apply butter for maintenance once.
Article 20 The oil production team is responsible for maintaining the oil production equipment of each well as required, establishing equipment files and filling in the equipment operation and maintenance records in time. Failing to carry out maintenance as required, depending on the seriousness of the case, the maintenance personnel and the person in charge will be fined 20-50 yuan; Accidents shall be handled according to relevant regulations.
Article 21 Diesel engines should be refueled and watered on time. If the diesel engine stops due to lack of oil and water, the responsible person shall be fined 100 yuan each time, and the accident shall be handled according to relevant regulations.
Chapter VI Patrol Inspection System
Twenty-second oil workers patrol every 2 hours; The oil production team shall patrol at least once every 3 days; The engineering department conducts random inspections. Patrol inspection records require rectification and record the problems found.
Article 23 The contents of patrol inspection include: surface oil production (power supply) equipment, process operation and hidden dangers on site, liquid, oil and water content of oil wells, etc.
The specific checkpoints are:
Inspection points of oil well patrol: whether there are sundries and pollution in the well site, whether the packing box at the wellhead leaks oil or water, whether the gate valve is in good condition and on/off, and clean up the site, rectify hidden dangers, and record production data such as casing pressure, current and oil storage tank level.
Inspection points of pumping unit patrol: whether the base, braid, rope hanger, donkey head, bracket, center shaft, tail shaft, crank pin, counterweight, reducer, belt, motor, brake, base and gearbox oil meet the requirements.
Inspection points of oil storage tank: foundation (support), burner, furnace combustion (electric heating), tank position, water level, gate valve opening and closing, water discharge, etc.
Twenty-fourth patrol inspection must be carried out seriously. Inspection, rectification, report in time to avoid accidents, reward 20- 100 yuan, otherwise depending on the seriousness of the fine 20-200 yuan.
Chapter VII Production Reporting System
Article 25 Each well point shall report the oil well output to the oil production team from 16: 00 to 17: 00 every day, and the oil production team shall report to the Division before 18:00 every day.
Article 26 Contents of the report
The contents of the report include well start-up time, daily liquid production of oil wells, daily oil production, water content, oil storage tank level, electricity meter reading, daily electricity consumption, operation of pumping units and equipment, and work content of the day.
Abnormal conditions must be reported at any time, such as well stoppage, abnormal equipment operation or oil well production, full oil storage tank, etc.
Article 27 If the report is not timely or not reported, 10 yuan will be deducted each time; If losses are caused due to delay in reporting, 50-200 yuan shall be punished as appropriate.
Chapter VIII Oil Pulling Management
Twenty-eighth wells (stations) oil pipeline lock control.
Article 29 After the liquid level of the oil tank reaches the specified value, the oil producer shall report the plan according to the regulations and heat the oil tank to discharge sewage. Please refer to the crude oil transportation management regulations of the Drilling and Production Department for specific operation procedures.
Chapter IX Technical Training
Thirtieth technical training content must be combined with the actual situation, focusing on training workers operating procedures, pumping units, diesel engine maintenance knowledge, the use of various tools. , to improve the technical quality of workers.
Thirty-first workers must receive on-the-job training before taking up their posts, and they can only take up their posts after passing the examination.
Technicians are responsible for technical training and assessment, so that the training is planned, with teaching plans, records, attendance and assessment.
Article 32 Technicians issue 10 questions every month, and post personnel teach themselves. Each post personnel shall be assessed once every quarter, with the top three being rewarded and the last three being punished.
Chapter 10 Standardized Management of Pumping Well
Thirty-third oil and water wells should be standardized management, and the engineering department should organize a monthly inspection and assessment of each well point.
Thirty-fourth inspection and assessment contents include data, equipment, standardization, skills, duty room, daily management, etc.
Article 35 Requirements for meeting standards
1, data management: obtain all data according to regulations; Fill in the handover report in a timely, clear, complete, accurate and unaltered manner, and fill in the equipment operation record carefully.
2. Equipment management: the pumping unit reaches the "five rates" standard, namely: basic level rate, operation balance rate, lubrication qualification rate, fittings fastening rate and wellhead centering rate; Realize rust removal and corrosion prevention; There is an obvious well number mark.
3. Standardized management: achieve "three clean-ups, four nothing, five nothing and one complete". Namely: equipment, devices, site cleaning; No oil pollution, no weeds, no open flames and no flammable materials; No leakage, no shortage, no looseness, no dirt and no rust; The tools are complete and intact.
4. Skill management: ensure that the production situation is clear, the inspection is clear, and the fire fighting equipment can be used.
5. Duty room management: The articles in the duty room are neatly arranged, free of garbage, oil stains, sundries and obscene books and periodicals.
6. Daily management: including the daily duty of post workers.
Article 36 Scoring criteria
1, total score100; Data, equipment, standardization, skills, duty room and daily management account for 20, 20, 10 and 10 respectively.
2. Assessment criteria for data management: if there are false data or incomplete data, no score will be scored; Failing to fill in the report in time, 2 points will be deducted for missing items; If there are five alterations and graffiti, deduct 1 point; Incorrect font 1 min.
3. Equipment management assessment standard: 3 points will be deducted if the pumping unit fails to reach the first-class rate, and 3 points will be deducted if the equipment is unclean, anticorrosive and unmarked 1 point.
4. Standardized management assessment standard: 1 point. If one item of "Three Clearances, Four No's and Five No's" is not up to standard, 2 points will be deducted for each missing tool.
5. Skill management assessment standard: 2 points will be deducted if the on-site assessment fails.
6. Assessment standard of duty room management: the items in duty room are placed in disorder, and no score is scored. There is garbage, oil, sundries, obscene books and periodicals, and 2 points will be deducted for each piece.
7. Daily management: 5 points will be deducted once after work, and 10-50 yuan will be deducted each time according to the length of time; 0.5 points will be deducted if the production report is not timely, and 1 point will be deducted if the production report is not timely.
8. The top three in technical assessment will be rewarded with 6 points, 4 points and 2 points respectively, and the three after technical assessment will be deducted with 3 points, 2 points and 1 point respectively. Other work mistakes will be deducted 1-2 points according to the actual situation.
The second chapter XI rainy season production management regulations
Article 37 Organizational leadership and responsibilities
In order to ensure the normal production in rainy season, the Drilling and Production Division has set up a leading group for rainy season production, which is responsible for the production organization in rainy season.
Article 38 Measures
1. Investigate the possible problems in rainy season production one by one, and list the work plan and material plan.
2. Keep abreast of the weather and arrange oil pulling, domestic water and production materials in advance.
3, the roof leakage on duty, doors and windows damaged, timely report maintenance.
4, completes the site, road water, investigation, report in advance, organization pad, renovation.
5, pumping unit foundation must be waterproof slope, prevent rain from infiltrating into the foundation; The pumping unit is not short of belts, with proper tightness, and does not slip when encountering water. A certain number of belts are installed on the platform of oil production well.
6, in order to ensure the safety of electricity, check all the circuits before the rainy season. Before it rains, all kinds of power junction boxes and air switches must be wrapped to prevent the motor from burning out, short circuit failure and fire.
7. The motor shaft must be equipped with various protective articles in rainy season: insulating gloves, rain boots, electric pens, etc.
Article 39 Those who fail to comply with the above provisions will be fined 20- 100 yuan once; If the well is stopped due to insufficient preparation, the responsible person shall be punished according to 20% of the output.
Chapter XII Provisions on the Administration of Winter Production
Article 40 Organizational leadership and responsibilities
In order to ensure normal production in winter, stop wells, block pipelines and freeze equipment less. The Drilling and Production Division has set up a leading group for winter production, which is responsible for organizing winter prevention.
Article 41 Measures
1. Strictly implement various operating procedures, strengthen the "Eight Preventions" education on winter production safety, such as anti-freezing, anti-skid, anti-poisoning, anti-electric shock, fire prevention, explosion prevention, prevention of out-of-control blowout and prevention of traffic accidents, and actively carry out regular activities to find hidden dangers.
2. Before winter comes, all pumping units and diesel engines (gas engines) should be re-maintained and tightened to reduce hidden dangers of equipment.
3. Thermal insulation measures must be taken for exposed pipelines at wellhead and well site.
4. For oil wells that use natural gas for heating and single-tank oil production, at least two natural gas pipelines should be reserved, and the pipelines should be free of oil and water to prevent freezing injury. The heating furnace must be rectified as required, the burner must not extend into the room, and the rubber pipe joint must not leak.
5. The drainage pipeline should be inclined to ensure that there is no water in the pipeline and prevent the pipeline from being blocked.
6. The oil well with single tank pulling oil requires 24-hour heating, and the oil producer pays special attention to controlling the flame size. For oil wells with serious casing oil production and water production, with the consent of the engineer, the temperature may not be raised at night, but it must be raised before pulling oil. Heating is not allowed during oil loading.
7. Try to reduce the intermittent times of oil wells in winter, and reduce wax deposition, pipeline blockage and pump sticking. Before opening an old well, check whether the pipeline is unblocked and whether the pumping unit is overloaded. Only after inspection can the well be started.
8, diesel engine (gasoline engine) well requirements
When baking the oil bottom of diesel engine (gasoline engine), the flame should not be too large to avoid burning the oil bottom and other parts; The diesel engine (gasoline engine) must be drained in time after stopping to prevent the water tank or the body from freezing due to non-drainage.
9, electrical equipment must be zero protection, it is forbidden to non-professional electrician to deal with circuit failure, it is forbidden to use electric furnace in the duty room for heating, it is forbidden to use electric heater without protector for heating, it is forbidden to set up temporary power lines without permission.
Forty-second in violation of the above provisions, except for rectification within a time limit, other responsible persons will be fined 20-200 yuan; When an accident occurs, it shall be implemented in accordance with relevant regulations; In case of well stoppage, the responsible person shall be punished according to 20% of the loss.
Chapter XIII Supplementary Provisions
Article 43 Matters not covered in these Provisions shall be implemented in accordance with relevant regulations of Zhongyuan Petroleum Exploration Bureau.