Does the building structure need supervision acceptance signature and material testing data?
The building structure needs the information signed by the supervisor for acceptance, as well as the material testing data.

Site, the so-called signature, means responsibility and obligation. This is your supervisor's job. Your job requires you to know these details and master the signing requirements of these materials.

A, buildings and structures need supervision and acceptance of the signature data.

1, materials, components in the acceptance record

2, equipment unpacking inspection records

3, materials, components exit record

4, foundation pit supporting deformation monitoring records

5. Inspection record of foundation trench

6, foundation treatment records

7. Ground drilling records

8, cast-in-place pile foundation construction records

9, manual digging pile construction records

10 drilling construction record

1 1 hole cleaning record of bored pile

12 construction record of cast-in-place pile

13, construction record of expanded cast-in-place pile

14 underwater concrete pouring record of bored pile

15 construction record of vibrating cast-in-place pile

16 construction record of high-pressure jet grouting foundation

17 construction record of deep cement mixing pile

18 heavy hammer tamping construction record

19 Record of Trial Ramming with Heavy Hammer

20, dynamic compaction construction records

2 1, original records of dynamic compaction (this form has not been signed by the supervisor)

22, vibroflotation foundation construction records

23, hammering reinforced concrete precast pile construction records

24, static pressure prestressed pipe pile (precast pile) construction records

25. Test piling record

26, pile deviation acceptance record

27, pile foundation quality acceptance record

28, concrete pouring application

29. Ready-mixed concrete transport bill (original)/Ready-mixed concrete transport bill (copy) (this form does not need the signature of the supervisor)

30, ready-mixed concrete slump test records at the scene

3 1 concrete construction record

32, mass concrete temperature record (this form does not need to be signed by the supervisor)

33, concrete curing temperature record (this form does not need to be signed by the supervisor)

34, concrete form removal application form

35, structure hoisting record

36, underground engineering waterproof effect inspection records

37, prestressed tensioning record (a) (this form shall be signed by the construction unit, construction unit and supervision unit)

Prestressed tendon tensioning record (II) (this form does not need to be signed by the supervisor)

38, bonded prestressed grouting records

39, steel structure installation and construction records

40, steel structure high strength bolt connection construction records

4 1, grid (cable-membrane structure) construction records

42, curtain wall glue injection inspection records

43, toilet, kitchen and ground water storage test records with waterproof requirements.

44, after the rain roof live spray water inspection records

45, exterior wall water spray inspection records

46, concrete block strength statistics, evaluation records

47, structural entities with condition maintenance, concrete block strength statistics, evaluation records.

48, masonry mortar block strength statistics, evaluation records

49, flue, air duct, garbage inspection records

50. Original records of on-site acceptance

Inspection batch quality acceptance record

5 1, brick masonry component project quality acceptance record

52, the main branch (a branch) engineering quality acceptance record

53, unit (child) project quality completion acceptance record

54, unit (child) engineering quality control data verification records

55, unit project (child) safety and function inspection data verification and main function spot check records.

56, unit (child) engineering visual quality inspection records

57, cement quality guarantee and test report summary table

58, steel raw material quality guarantee and test report summary table

59, steel welding test report summary table

60, brick, sand, waterproof materials, doors and windows, prefabricated quality guarantee and test report summary table.

6 1, ready-mixed concrete, sand, stone and other quality assurance summary table

62, concrete impermeability test report summary table

63, materials, equipment quality certificate summary table

Second, the construction engineering test data items

1 concrete mix design report

2, concrete permeability test report

3, compressive strength test report of concrete specimens

4, the concrete specimen Kang flexural strength test report

5, masonry mortar simple pressure test report

6, mortar compressive strength test report

7, mortar mixture ratio design report

8, cement compressive strength test report

9, autoclaved aerated concrete masonry mortar and plastering mortar test report

10, steel performance test report

1 1, steel performance re-inspection test report

12, steel welding inspection report

13, rebar welding reinspection test report

14, reinforced mechanical connection test report

15, retest test report of mechanical connection of steel bar

16 test report on physical and mechanical properties of cement

17, test report of building sand

18, building stone inspection report

19 test report of ordinary concrete sand

20, ordinary concrete stone test report

2 1, autoclaved aerated concrete block test report

22, brick, block compressive strength test report

23, steel tube scaffold couplers test report

24, steel pipe performance test report

25, building doors and windows three sex test report

26, glass insulation cotton test report

27, glass inspection report

28, wire and cable inspection report

29, galvanized welded steel wire mesh test report

30, heat insulation aluminum profile test report

3 1, aerated concrete adhesive test report

32. Test report on thermal insulation performance of external windows of buildings

33, rubber powder polystyrene particles thermal insulation slurry test report

34, adhesive test report

35, interface mortar test report

36, polymer insulation mortar test report

37, extruded polystyrene foam insulation test report

38. Test report on molded polystyrene foam for thermal insulation.

39, anti-crack mortar test report

40, brick jointing material test report

4 1, brick bonding mortar inspection report

42, plaster mucilage test report

43, alkali-resistant mesh test report

44, laboratory envelope heat transfer coefficient test report

45, ceramic wall and floor tile adhesive test report

The above are collected and sorted by Zhong Da Consulting Company.