1. Construction organization design:
1. Preparation: organized by the project manager, the project technical leader is specifically responsible for the preparation, and the project constructors, quality inspectors, safety officers, etc. participate in the preparation . Signed by me.
2. Review: The technical person in charge of the higher-level management agency of the project department is usually the chief engineer of the enterprise, or the technical person in charge of the enterprise's dispatched agency. Signed by me.
3. Approval: Chief Supervising Engineer. For projects without supervision, the project leader or enterprise technical leader of the construction unit. Signed by me.
2. Basis: Prepared and approved in accordance with the requirements of "& Construction Organization Design Code" & GB& /& T& 50502&-2009. The preparation and approval of the construction organization design should comply with the following regulations:
1. The construction organization design should be prepared by the project leader, and can be prepared and approved in stages as needed;
2. The general design of the construction organization shall be reviewed and approved by the technical leader of the general contracting unit; the construction organization design of the unit project shall be reviewed and approved by the technical leader of the construction unit or the technical personnel authorized by the technical leader; the construction plan shall be reviewed and approved by the technical leader of the project; key points and difficulties shall be divided into The construction plans of partial (sub-project) projects and special projects shall be reviewed by relevant experts organized by the technical department of the construction unit.
Extended information:
Construction organization design is divided into three categories: general construction organization design, unit project construction organization design and construction plan according to different design stages and preparation objects.
(1) General design of construction organization
The general design of construction organization is a construction organization design prepared with the main object of group projects or extremely large projects composed of several unit projects. The general design of the construction organization is generally carried out by the general contractor under the leadership of the chief engineer after the preliminary design or expanded preliminary design of the construction project is approved. The construction unit, design unit and subcontracting unit assist the general contractor in its work.
The overall design of the construction organization plays an overall planning and key control role in the construction process of the entire project. Its task is to determine the implementation procedures of the construction project, the construction plan of the main buildings, the overall construction progress plan and resource demand plan of the construction project, and the overall planning of the construction site.
(2) Unit project construction organization design
Unit project construction organization design is a construction organization design prepared with the unit (sub-unit) project as the main object. ) plays a guiding and constraining role in the construction process of the project. The construction organization design of Unit 1 project is prepared under the leadership of the construction project leader after the completion of the construction drawing design and before the start of the project.