What does the bidding document mean?

What does the original and copy of the bidding document mean?

The biggest role of the original and the copy is that when they conflict with each other, the original shall prevail.

Generally speaking, the requirements are the same when making, just mark the original and copy respectively after completion. It is also possible to make a copy of the unstamped original and then stamp it as a copy.

What does bidding mean?

Bidding refers to legal persons or other organizations that respond to bidding and participate in bidding competitions. The bidder shall have the ability to undertake the bidding project; if the relevant national regulations stipulate the qualifications for bidders or the bidding documents have stipulations on the qualifications for bidders, the bidder shall meet the prescribed qualifications.

In the economic construction of our cities and towns, we often encounter technical terms for tendering and bidding. In fact, they are not that complicated, and they are not something that only wealthy people can understand. Tendering is actually a company or a company. *** Make an entry for you to run for a certain project, and then you choose according to your own characteristics. This is bidding.

Then you should bid. The bid is how much money you need to do the project. This cannot be changed. You only have one chance. After that, you have no chance. Generally speaking, you should know that you What is the bid of the competitors? Because the tenderer always chooses the one that requires the least funds to proceed and operate. Of course, this is also the reason why there is a shady secret in the bidding industry.

What does "when necessary" and "if applicable" mean in the bidding document?

When necessary

It needs to be read in context

For example, Notify bidders by phone or email when necessary

For example, when the bidding results come out or an addendum to the bidding documents is issued

If applicable

It also needs to be viewed in context

For example, some bidding projects can be bid in the form of a consortium and some cannot

In the bidding document format, the position of the consortium agreement will appear after the title. If applicable

If this project is a consortium bidding, the consortium agreement in the format is generally applicable, otherwise it is not

What does the third envelope of the bidding document mean

p>

The back of the front cover is the back cover

The fourth cover is the back cover, and the back of the back cover is the third cover

What does "one package, one bid" mean in the bidding documents?

“One package, one bid” in the bidding documents means: one subcontract requires one bidding document.

In many bidding documents, there are several subcontract numbers. For example, in a street lamp procurement bidding, infrastructure projects such as digging holes, burying wires, and cable procurement (1 million yuan) can be treated as a subcontract. (Package 1); then the procurement of sodium lamps and spotlight equipment (RMB 580,000) is used as a subcontract (Package 2), and finally the street light poles (RMB 1.2 million) are recruited as a subcontract (Package 3).

In this kind of bidding activity, three different bidding units are allowed to bid (win the bid) for one of the subcontracts, or the same unit is allowed to bid (win the bid) for all three subcontracts, but it must be A subcontract has a separate bid document.

Bidding, what does bidding mean?

Bidding corresponds to bidding. A bid is a specific proposal made by the bidder to the tenderer to conclude a contract according to the tenderer's requirements, and it is an alternative plan provided to the tenderer. Tenders are divided into production and operational tenders and technical tenders. Production and operation bids include project bids, contracting bids, product sales bids, and labor service bids; technical bids include scientific research project bids, technology introduction or technology transfer bids.

Writing

1. title. It is sufficient to write “Tender Application”, “Tender Reply” or “Tender” in the middle of the title of the tender. 2. text. The text of the tender document consists of the beginning and the main body. At the beginning, state the basis and leading idea of ??the bid. The subject should express the bidding business ideas and policies, business objectives, business measures, requirements, external conditions and other contents in a specific, complete and comprehensive manner, and strive to have rigorous demonstration, clear hierarchy and concise writing. 3. Sign off. State the name of the bidding unit (or individual) and the date of bidding.

Things to note: The writing of tender documents requires seeking truth from facts, being specific, clear, accurate and punctual.

Issues that bidders should pay attention to when submitting bids

Article 28 of the "Tendering and Bidding Law" stipulates that bidders shall submit bid documents before the deadline required by the bidding documents. Deliver the bidding documents to the bidding location. After receiving the bidding documents, the bidder shall sign and save them and shall not open them. If there are less than three bidders, the tenderer shall re-invite bids in accordance with this Law. The tenderer shall reject bid documents that are delivered after the deadline for submission of bid documents required by the bidding documents.

Delivery of Tender Documents. The bidder must deliver the bidding documents within the specified time at the location specified in the bidding documents. The best way to deliver the bid is directly or through an agent, so as to obtain acknowledgment from the bidding agency that the bid has been received.

The time and place for submitting the bid are usually included in the bidding document. The bidder cannot send the bid document to a place other than the place specified in the bidding document. If the bidder makes a mistake in submitting the bid at the wrong place, , and any bid that is delayed will be deemed invalid and rejected.

If delivered by mail, the bidder must allow time for mailing to ensure that the bid documents can be delivered to the location designated by the tenderer before the deadline. Rather than "postmark based". If the bidding documents are delivered after the deadline, that is, the bidding validity period has expired, the tenderer shall return them intact and shall not enter the bid opening stage. Signing and saving of bidding documents. After receiving the tender documents, the tenderer shall sign for them and shall not open them. In order to protect the legitimate rights and interests of bidders, the tenderer must complete complete signing, registration and filing procedures. The signer should record the date and place of submission of the bid documents as well as the sealing status. After signing, the signer should place all submitted bid documents in a confidential and safe place. No one is allowed to open the bid documents.

In order to ensure sufficient competition, if there are less than three bidders, the bids should be re-invited. This situation is called "flow mark" abroad. According to international practice, at least three bidders can bring about effective competition. Because two bidders participate in the bid and there is a lack of competition, the bidder may increase the purchase price and harm the interests of the tenderer.

Bidding is based on traditional bidding, where the seller sells the item to the highest bidder.

Valid bidders should be more than three (including three) or more than three (including three) that have substantially responded to the bidding documents

(Note: There are many *** in bidding and auctions The same thing, but there are also differences. The bidding requirements are more stringent, especially there are many requirements for buyers.)

Classification of bidding

In the market, many bidding items can be used Options and tricks, including:

Bidding with a reserve price

Some bid items have a reserve price, a hidden minimum price.

The reserve price is the lowest price the seller is willing to accept for the item. As a buyer, you don’t see the reserve price, you only know if it was met. If the reserve price is not met, the seller may not sell the item. The winning bidder must meet or exceed the reserve price and be the highest bidder to purchase the item.

When a reserve price exists, you simply enter the maximum price you are willing to pay for the item and bid as normal. Check the mark next to the current price to see if the reserve price has been reached. Unless you see that the reserve price has been reached, there is no winner in the current bidding. Once the reserve price is reached, the item will be sold to the highest bidder at the end of the auction. If your maximum bid is the first to reach or exceed the floor, the valid bid displayed will automatically be raised to the floor.

Secret bidding

If the seller chooses secret bidding when logging in to the item, the buyer's username will not appear on the item page or item export...< /p>

What is bidding

In layman’s terms:

Bidding: The company wants to engage in a project, draft relevant requirements, etc. and then recruit units or companies from the society that can complete the project. personal. Similar schools want to recruit students.

Bidding: Units or individuals who have the ability to complete the bidding projects of the bidding unit can use relevant information to "recruit work". Similar to student filings.

Bidding: Several bidders compete for qualifications.

Winning the bid: Obtaining the qualification through bidding and "getting the job".

Similar students were admitted

What do bids, bid letters, bid documents, and bids mean?

The meanings of bids, bid letters, bid documents, and bids are as follows:

1. Tender: refers to the quotation submitted by the bidding unit to the bidding unit in accordance with the conditions and requirements of the tender and the document in which the bid is filled out. It requires sealing and mailing or sending a special person to the bidding unit, so it is also called a bid letter.

2. Bid letter: A bid letter refers to a letter of commitments and instructions submitted by the bidder to the tenderer in accordance with the conditions and requirements of the bidding documents regarding the quotation, quality targets, etc.

3. Bidding documents: Bidding documents refer to responsive documents prepared by bidders in response to the requirements of bidding documents. They generally consist of business documents, technical documents, quotation documents and other parts. 4. Tender document: It is a document prepared by the bid-issuing unit or commissioned by the design unit to provide bidders with the main technical, quality, construction period and other requirements for the project.

Do the scope of undertaking and the work undertaken in the bidding document have the same meaning?

If the scope of undertaking and the work undertaken are on the same project information*** the same question< /p>

Then the difference is not big

The work undertaken includes information on several individual projects completed by the company in this project

The scope of the undertaking is more likely to be within the work tasks On the basis of including the engineering quantity of the completed project

If you only ask about the scope of undertaking or the work undertaken, you can include the corresponding engineering quantity

If there is no data of engineering quantity to support writing the undertaking You can also choose several individual projects

What does the completeness of the bidding documents mean?

Haha, the meaning is very clear. Literally, it means that the bidders’ bidding documents should have There must be content.

What should be the content?

Generally, the bidding documents will clearly state: 1. The composition of the bidding documents; 2. The composition of the bidding documents

Bidders must read the bidding documents carefully and prepare their bids based on the above two items. In addition to the required content in the document, you must also add some content based on your own circumstances. The entire content is complete, which is called "tender document integrity". The term "general completeness" comes from the "Standard Construction Documents", which is part of the preliminary review and is not scored. However, if it does not pass, it will be directly awarded.

The preliminary review generally includes:

1. Format review; 2. Qualification review; 3. Responsiveness review. Completeness is generally found in responsiveness reviews.