The people's governments of cities and districts (cities) along the Yangtze River should strengthen their leadership in the management of the Sanjiang River, establish a coordination mechanism for major issues, improve the technical quantitative indicators and target assessment management system for flood discharge, drainage, navigation, water supply and ecological protection, and realize the specialization, scientificity and refinement of the management of the Sanjiang River. Sanjiang River regulation and maintenance costs in accordance with the regional classification management system, into the annual budget of the government at the same level. Article 8 The municipal and district (city) people's governments along the Yangtze River shall promptly report to the Standing Committee of the people's congress at the corresponding level on the planning, regulation, utilization and protection of the Sanjiang River. The Standing Committee of the Municipal People's Congress and the people's congresses along the Yangtze River shall strengthen the supervision of the management of the Sanjiang River by listening to special work reports and carrying out law enforcement inspections. Chapter II River Planning, Regulation and Construction Article 9 The construction, regulation, protection, utilization and management of the Sanjiang River shall follow the comprehensive planning of the Yongjiang River basin and the professional planning of flood control and waterlogging control, dredging and dredging, dike line of the main stream and water area protection. The comprehensive planning of Yongjiang River Basin shall be compiled by the municipal water administrative department in conjunction with the relevant departments of development and reform and the people's government along the Yangtze River, submitted to the Municipal People's government for approval, and reported to the provincial water administrative department for the record. Professional planning for flood control and waterlogging control in Sanjiang, dredging and dredging, dike line of main stream and water area protection shall be organized by the municipal water administrative department, and submitted to the Municipal People's Government for approval and promulgation after soliciting the opinions of relevant departments and provincial water administrative departments. The professional planning of Sanjiang River should conform to the comprehensive planning of Yongjiang River Basin, and be connected with the planning of ports, waterways and fisheries. Article 10 The management scope of Sanjiang River includes the waters, sandbanks, beaches (including cultivated land), flood discharge areas, dikes and berms on both sides of the river. The professional planning of the dike line in the main stream of Sanjiang should determine the specific management scope of the Sanjiang River. Boundary markers and bulletin boards shall be set up within the management scope of Sanjiang River, which shall be set up by the municipal water administrative department in conjunction with the water administrative department of Yanjiang District (city). No unit or individual may move or damage boundary markers and bulletin boards without authorization. Article 11 The municipal water administrative department shall, jointly with the relevant departments, formulate the annual river regulation plan according to the comprehensive river basin planning, the professional planning of dikes in the main stream of Sanjiang River and other related professional planning and the monitoring of river siltation, and implement it after being reported to the Municipal People's Government for approval. The annual plan for river regulation shall, according to the national, provincial and municipal requirements for flood control, drainage, navigation, water supply, ecological standards and other requirements related to the maintenance of river functions, define the regulation objectives such as flood control and drainage, river dredging, dike repair, sluice construction, pollution interception and control, and waterfront space transformation, and determine the specific regulation project name, regulation content, regulation period, responsible unit and task division. For river sections that seriously affect flood discharge, navigation safety and environmental landscape, such as dike damage, river bed elevation and river channel narrowing, the municipal water administrative department shall take emergency measures, give priority to rectification, eliminate hidden dangers of river safety in time, and improve the comprehensive functions of river flood control and drainage, navigation irrigation and ecological protection. Twelfth Sanjiang River regulation should pay attention to the protection and restoration of the ecological environment and historical and cultural landscape of the river and its surrounding areas. In areas where conditions permit on both sides of the Three Rivers, public facilities such as constructed wetlands and walkways can be built in combination with the needs of the surrounding environment. The materials and working machinery used in the regulation of Sanjiang River shall meet the requirements of environmental protection and ecological construction.