Who are the preparers, reviewers, and approvers of the special construction plan?

Construction organization design:

①. Preparation: Organized by the project manager, the project technical leader is specifically responsible for the preparation, and the project constructors, quality inspectors, safety officers, etc. participate in the preparation. Signed by me.

②. Review: The technical person in charge of the higher-level management agency of the project department is usually the chief engineer of the enterprise, or the technical person in charge of the enterprise's dispatched agency. Signed by me.

③. Approval: chief supervisory engineer. For projects without supervision, the project leader or enterprise technical leader of the construction unit. Signed by me.

Extended information:

The construction plan is the implementation plan specified based on a construction project. These include organizational structure plans (the composition of each functional agency, their respective responsibilities, mutual relationships, etc.), personnel composition plans (project leaders, heads of various agencies, heads of majors, etc.), technical plans (schedule arrangements, key technology plans, etc.) Major construction step plans, etc.),

Safety plans (overall safety requirements, construction risk factor analysis, safety measures, safety plans for major construction steps, etc.), material supply plans (material supply process, maintenance and inspection process, Temporary (urgent) material procurement process, etc.).

In addition, depending on the size of the project, there are on-site security plans, logistics support plans, etc. The construction plan is determined based on the project. Some projects are simple and have a short construction period, so there is no need to formulate complex plans.