After drawing review, there should be a record of construction drawing review. Among them, the name of the project should be indicated and indicated in the drawings. The name of the project should be indicated in the drawings. Drawing will check the form number of the form used for registration. The name of the volume of the reviewed drawings shall be indicated in the drawings. The volume number of the reviewed drawings shall be indicated in the drawings. This is the supervisor's signature and presiding. The time of drawing design shall be marked with year, month and day.
Place of joint review of drawings. All participants, including all contractors (construction unit, supervision unit, design unit and construction unit). The bottom of the table shall be signed by the representatives of the design unit, construction unit, construction unit and supervision unit, and sealed by each unit.
Extended data:
Drawing design requirements stipulate that:
1, all kinds of new construction, reconstruction and expansion projects in the classification standard for architectural engineering design are within the scope of review. The construction administrative departments of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government may determine the specific scope of examination in light of local conditions.
2, engaged in housing construction project construction drawing review, structural professional review personnel not less than 7 people, architectural professional not less than 3 people, electrical, HVAC, water supply and drainage, survey and other professional review personnel not less than 2 people.
3. Examiners should have good professional ethics; At least 15 years working experience in professional survey and design; He has presided over more than 5 major designs of corresponding majors in large-scale housing construction projects, municipal infrastructure projects or Grade A engineering survey projects.
Baidu encyclopedia-blue prints.the design