1. 1 commencement report
1.2 construction site quality management inspection records
1.3 construction organization design
1.4 The blue prints.the design, design change documents and negotiation records
1.5 quality and technical disclosure
1.6 construction record (construction log)
1.7 engineering survey setting-out record
1.8 total inspection record of roof waterproof leakage
1.9 total record of basement waterproof effect inspection
1. 10 Summary Record of Groundwater Storage Test and Inspection
1. 1 1 building verticality, elevation and total height measurement records
1. 12 energy saving and heat preservation test record
1. 13 indoor environment test report
1. 14 foundation slot inspection record
1. 15 foundation (pile foundation) project acceptance record
1. 16 foundation engineering acceptance record
1. 17 acceptance record of main structure engineering
1. 18 Summary results of settlement observation data of completed projects
1. 19 unit engineering quality control data verification record
1.20 unit engineering safety and function inspection data verification and main function spot check records
1.2 1 unit project visual quality inspection record
1.22 unit project quality completion acceptance record
1.23 unit project completion acceptance certificate
1.24 Minutes of Meeting on Completion Acceptance of Unit Project
1.25 engineering quality accidents and accident investigation and handling data
2, basic engineering data sorting order and content
2. 1 engineering geological investigation report
2.2 engineering foundation treatment records
2.3 Test report on bearing capacity of engineering backfill cushion foundation, composite foundation and pile foundation
2.4 Composite Foundation CFG Pile and Concrete Filling Pile Integrity Test Report
2.5 written opinions on class Ⅲ and Ⅳ pile design of this project.
2.6 Acceptance records of Class Ⅲ and Ⅳ piles of this project.
2.7 construction scheme
2.8 construction pile record
2.9 notes on mixing ratio of raw materials for engineering piles
2. 10 engineering pile reinforcement raw material certificate and witness test report
2. 1 1 reinforced hidden acceptance record
2. 12 Factory Certificate and Quality Certificate of Commercial Concrete for Engineering Piles
2. 13 summary evaluation and block report of concrete sampling block strength in engineering pile site
2. 14 building pile bitmap
2. 15 written opinions on the design of pile position deviation and broken pile caused by excavation collision.
2. 16 acceptance record of cushion, composite foundation and pile foundation (construction, design, survey, inspection, supervision, piling, acceptance conclusion of the upper construction unit * * *, signature, seal and time are consistent)
2. 17 Inspection Record of Construction Quality of Foundation Engineering, Sub-projects and Sub-projects
3, basic engineering data sorting order and content
3. 1 Construction scheme of infrastructure formwork
3.2 Construction scheme of foundation structure reinforcement project
3.3 Construction Scheme of Foundation Structure Concrete Project
3.4 certificate and summary table of raw materials for reinforcement
3.5 Witness inspection test report of steel raw materials
3.6 Witness inspection test report of steel bar connection and quality inspection certificate of connecting sleeve.
3.7 Welder's certificate of reinforcement engineering (valid for 2 years)
3.8 reinforced engineering hidden acceptance record
3.9 Summary evaluation of standard curing strength of concrete and test block report
3. 10 Summary evaluation of concrete strength and test block report under the same conditions
3. 1 1 Temperature record of concrete at 600℃ d under the same conditions.
3. 12 concrete structure entity inspection implementation scheme (selection scheme of test block and reinforced protective layer under the same conditions)
3. 13 Acceptance Record of Concrete Strength of Structural Entity of Concrete Structure Subdivision (GB 50204—2002) 0201—1Table
3. 14 Table of Acceptance Record of Thickness of Entity Protective Layer of Reinforced Concrete Structure in Concrete Structure Sub-project (GB50204—2002)020 1—2
3. 15 The report of concrete formwork removal test block with the same conditions is attached to the acceptance record of concrete formwork removal inspection lot.
3. 16 notice of on-site concrete mixture ratio
3. 17 witness test report of concrete mixing cement on site
3. 18 Witness test report and factory certificate of on-site mixing concrete admixture.
3. 19 Factory Certificate and Re-inspection Report of Mixing Admixtures in Concrete Field
3.20 concrete test report of on-site mixing sand and gravel materials
3.2 1 Factory Certificate and Quality Certificate of Commercial Concrete (28d)
3.22 concrete pouring sequence
3.23 concrete construction records and concrete maintenance records
3.24 Inspection lot, subdivisional work and quality acceptance record of concrete formwork installation and dismantling, steel bar processing and installation, concrete raw materials and concrete construction, and concrete appearance quality inspection (inspection lot and subdivisional work are bound in order of floor, actual construction order and occurrence date).
3.25 Report on Impermeable Concrete Block
3.26 underground waterproof engineering waterproof coiled material witness sampling test report and certificate of approval
3.27 underground waterproofing membrane paving hidden acceptance record
3.28 Leakage inspection records of underground waterproofing works, and provide the "development drawing of back water inner surface structure engineering" of underground works. Only the inner wall and bottom plate of the enclosure structure are inspected in the basement of the building.
3.29 underground waterproof engineering waterproof concrete, coiled material waterproof layer, coating waterproof layer, cement mortar waterproof layer, detailed structure inspection batch, subdivisional work, division of engineering quality acceptance records.
4, the main structure engineering data sorting order and content
4. 1 Construction scheme of main structure formwork project (including calculation)
4.2 the main structure reinforcement engineering construction scheme
4.3 Main structure concrete engineering construction scheme
4.4 certificate and summary table of raw materials for reinforcement
4.5 Witness inspection test report of steel raw materials
4.6 Witness test report of steel bar connection and quality inspection certificate of connecting sleeve.
4.7 Welder's certificate of reinforcement engineering (valid for 2 years)
4.8 reinforced engineering hidden acceptance record
4.9 Summary evaluation of standard curing strength of concrete and test block report
4. 10 Comprehensive evaluation of concrete strength and test block report under the same conditions
4. 1 1 Temperature record of concrete at 600℃ d under the same conditions.
4. 12 concrete structure entity inspection implementation scheme (selection scheme of test block and reinforced protective layer under the same conditions)
4. 13 concrete structure sub-division concrete structure entity strength acceptance record form 0201-1.
4. 14 Table 020 1-2 for Acceptance Record of Thickness of Entity Protective Layer of Reinforced Concrete Structure in Sectional Project of Concrete Structure
4. 15 The report of concrete formwork removal test block with the same conditions is attached to the acceptance record of concrete formwork removal inspection lot.
4. 16 notice of on-site concrete mixture ratio
4. 17 witness test report of concrete mixing cement on site
4. 18 field concrete admixture witness test report and factory certificate.
4. 19 Factory Certificate and Re-inspection Report of Mixing Admixtures in Concrete Field
4.20 concrete test report of on-site mixing sand and gravel materials
4.2 1 Factory Certificate and Quality Certificate of Commercial Concrete (28d)
4.22 concrete pouring sequence
4.23 concrete construction records and concrete maintenance records
4.24 Report, summary and evaluation of concrete test blocks of structural columns and horizontal tie beams in bay windows and infilled walls
4.25 main structure settlement observation summary and various observation data
4.26 Pre-stressed steel stranded wire, metal spiral pipe, anchorage, connector, etc. shall be submitted to the on-site re-inspection qualified documents.
4.27 Installation, tensioning and grouting records of prestressed tendons
4.26 Strength Report of Prestressed Concrete Block with Same Conditions
4.28 Grouting cement slurry and compressive strength test report
4.29 Precast Component Certificate
4.30 Test Report on Concrete Strength of Precast Component Joint
4.3 1 performance inspection report of precast members
4.32 prefabricated installation inspection batch quality acceptance record
4.33 Installation and removal of concrete formwork, processing and installation of steel bars, construction of concrete raw materials and concrete, inspection of concrete appearance quality, and quality acceptance records of inspection lots, subdivisional works and subdivisional works (inspection lots and subdivisional works are bound in order of floors, actual construction sequence and occurrence date).
5, steel grid engineering data sorting order and content (a separate book)
5. 1 construction scheme of steel grid structure
5.2 Inspection report on weld flaw detection of steel grid structure
5.3 Test report on bearing capacity of steel grid joints (steel grid structure of public buildings with a building safety level of Grade I and a span of 40 m or more)
5.4 Test and Analysis Report on Deflection Value of Steel Grid Structure
5.5 Test report on elevation deviation of steel grid support
5.6 Steel mesh, steel, steel ball, steel pipe, bolt, steel plate, roofing profiled metal plate, covered electrode coated certificate and other materials.
5.7 Welder certificate of steel structure (valid for 3 years)
5.8 Inspection Report on Anticorrosion Layer of Steel Grid Structure
5.9 Inspection Report of Fire-retardant Coatings for Steel Grid Structure
5. Acceptance record of10 steel grid structure project
5. 1 1 Inspection lot of steel grid structure, quality acceptance records of sub-projects and sub-projects
6, steel structure engineering data sorting order and content (a separate book)
6. 1 technical scheme for steel structure engineering construction
6.2 Quality Certificate of Steel and Steel Castings
6.3 Quality certificate of welding materials and reinspection report of important steel structure welding materials.
6.4 Torque coefficient, pre-tightening force, product certificate and reinspection report of high-strength bolt connection pair
6.5 Anti-skid coefficient test and reinspection report of friction surface of high-strength bolt connection
6.6 Weld flaw detection report
6.7 Welder certificate of steel structure (valid for 3 years)
6.8 Deflection detection of cranes and crane trusses
6.9 Record of inspection results of overall verticality and overall plane bending deviation of multi-storey and high-rise steel structure main structure
6. 10 Record of inspection results of anticorrosive coating and fireproof coating of steel structure
6. 1 1 steel structure inspection lot, subentry project and sub-division project quality acceptance record
6. 12 steel structure completion acceptance record
7. Arrangement sequence and content of engineering data of infilled wall
7. 1 Rachel reinforcement setting before masonry of infilled wall, concealed acceptance of concrete constructional column and horizontal tie beam of infilled wall.
7.2 The infilled wall blocks shall be watered and wetted before stacking and laying at the site.
7.3 notice of mixing ratio of masonry mortar
7.4 Mortar block strength summary evaluation and block report
8, masonry engineering data sorting order and content
8. 1 certificate of conformity of bricks, blocks and raw materials, and product performance test report.
8.2 notice of mixing ratio of masonry mortar
8.3 Mortar block strength summary evaluation and block report
8.4 Inspection lot, subdivisional work and sub-division engineering quality acceptance records
9, decoration engineering data sorting order and content (a separate book)
9. 1 Construction technology standard for construction organization design (construction technical scheme) of decoration engineering
9.2 Certificates and reinspection reports of raw materials and components
9.2. 1 plastering project: cement certificate and re-inspection report
9.2.2 Doors and windows engineering: product qualification certificate of materials, performance test report and re-inspection report of formaldehyde content in wood-based panels, and re-inspection report of three properties of metal windows and plastic windows on external walls of buildings.
9.2.3 Suspended ceiling project: product certificate, performance test report and re-inspection report on artificial formaldehyde content of materials.
9.2.4 Lightweight partition wall project: product certificate of materials, performance test report and re-inspection report of formaldehyde content in wood-based panels.
9.2.5 Decorative panel (brick) project: product certificate and material performance test report. Test report on bond strength of exterior wall tile samples, indoor radioactivity reinspection of granite, cement quality reinspection, water absorption and frost resistance reinspection of exterior wall tiles.
9.2.6 Painting project: product certificate and material performance test report.
9.2.7 Soft package pasting project: product certificate and material performance test report.
9.2.8 Detailed engineering: materials and product certificates, performance test reports and formaldehyde content re-inspection reports of man-made panels for cabinets (fixtures), curtain boxes, window sills, heating covers, door and window guardrails, handrails and ornamental works.
9.3? Decoration engineering hidden acceptance record
9.3. 1 plastering project: total plastering thickness ≥35㎜, and strengthening measures at the junction of different substrates.
9.3.2 Doors and windows engineering: Embedded parts, anchors and concealed parts shall be anticorrosion and embedded.
9.3.3 Suspended ceiling project: pipeline and equipment installation, water pipe pressure test in suspended ceiling, wood keel, embedded parts, anti-corrosion and fire prevention treatment of Rachel, suspender installation, keel installation, and concealed filling materials.
9.3.4 Installation of equipment and pipes in partition wall of light partition wall project, pressure test of water pipes, fire prevention and anti-corrosion treatment of wooden keel, embedded parts and Rachel bars, installation of keel and concealment of filling materials.
9.3.5 Decorative panel (brick) project: concealment of embedded parts, connecting nodes and waterproof layer.
9.3.6 Detailed engineering: concealment of embedded parts (or post-embedded parts), and connection nodes between guardrail and embedded parts.
9.4 ground engineering
9.4. 1 Material qualification certificate (book) of cement, hydrated lime, crushed stone, sand, slag, waterproof material (coiled material and coating), ceramic mosaic brick, cylindrical brick, ceramic floor tile, cement brick, plastic board, marble, granite floor, dust-proof and antistatic floor, carpet, solid wood floor, bamboo floor and laminated wood floor used in ground engineering.
9.4.2 Inspection report on limited entry of harmful substances (radioactivity) from natural marble and granite stones.
9.4.3 Limited detection of TVOC and free formaldehyde in binder and asphalt binder.
9.4.4 Inspection Records of Water Storage in Toilets, Bathrooms and Buildings with Waterproofing Requirements 9.4.5 Report on Cement Mortar and Cement Concrete Block in Ground Engineering
9.4.6 Underground trench concealed pipe concealment acceptance record
9.5 External thermal insulation project of external wall
9.5. 1 product certificate of insulation board material, performance test report and re-inspection report on approach.
9.5.2 Insulation Board Installation Concealed Acceptance Record
9.6 decoration engineering inspection lot, subdivisional work and sub-division quality acceptance records
10, curtain wall engineering (glass curtain wall, metal curtain wall, stone curtain wall) data sorting order and content (independent book)
10. 1 curtain wall engineering structure calculation, construction drawing, design description and design change documents.
10.2 Compatibility and bonding strength of silicone structural adhesive for curtain wall engineering, peeling strength of aluminum-plastic composite board, bending strength, water absorption and frost resistance of stone, radioactivity of granite, bonding strength of structural adhesive for stone, and pollution of sealant for stone. Material certificate, material performance test report and approach reinspection report shall be provided.
10.3 field tensile strength test report of embedded parts after curtain wall engineering
10.4 Three performance test reports of curtain wall
10.5 product certificate of various other materials, hardware fittings and components for curtain wall.
10.6 curtain wall construction scheme and construction record (component processing and installation construction record) 10.7 curtain wall engineering inspection lot, sub-project and curtain wall sub-division engineering quality acceptance record.
10.8 curtain wall project completion acceptance record
1 1, roofing engineering data sorting order and content
1 1. 1 roofing leveling layer, material certificate, material certificate of insulation layer and waterproof layer, quality inspection report and on-site sampling re-inspection report.
1 1.2 roofing construction scheme
1 1.3 Inspection record of roof leakage after rain or water storage.
1 1.4 concealed acceptance record of roof leveling layer details
1 1.5 Inspection and acceptance record of waterproof layer details of roofing project
1 1.6 roof engineering inspection lot, subentry project and sub-division project quality acceptance record
12, building water supply and drainage and heating engineering data sorting order and content
12. 1 construction organization design (construction technical scheme)
12.2 The blue prints.the design, design change documents and negotiation records
12.3 quality and technical disclosure
12.4 record of hidden acceptance and intermediate acceptance
12.5 construction log (construction record)
12.6 factory certificates and arrival inspection reports of main materials, finished products, semi-finished products, accessories, appliances, pipes, fittings, valves and equipment.
12.7 water supply and heating system installation pressure piping system, equipment strength, valve and radiator leakage pressure test records.
12.8 report on washing, disinfection and water quality sampling test of water supply pipeline and domestic water supply pipeline.
12.9 record of irrigation test and ball passing test of drainage pipeline
12. 10 sanitary ware water injection test record.
12. 1 1 fire hydrant system test record
12. 12 rainwater pipe irrigation and drainage test
12. 13 Drainage test of floor drain and ground cleaning mouth
12. 14 equipment (fan, water pump, etc.) test handover record. )
12. 15 quality acceptance records of inspection lots, disciplines and divisions.
13, building electrical engineering data management sequence and content
13. 1 construction organization design (construction scheme)
13.2 the blue prints.the design, design change documents and negotiation records
13.3 material inspection list, factory certificates of main materials, finished products, semi-finished products, accessories, appliances and equipment, and incoming inspection (test) reports (including factory test records of equipment, equipment packing list, production license, safety certification marks, factory marks, commodity inspection certificates of imported equipment and China quality certificates, installation, use, maintenance and test instructions, and installation of new electrical equipment, appliances and materials).
13.5 Acceptance Record of Concealed Works
13.6 electrical equipment handover test record
13.7 lighting full-load electrification acceptance record
13.8 robustness test record of large lamps and lanterns
13.9 grounding and insulation resistance test record
13. 10 No-load commissioning and load commissioning records
13. 1 1 Inspection records of grounding and zero connection of lines, distribution boxes (panels), sockets and leakage protectors. 13. 12 inspection records of inspection lot, disciplines and divisions.
13. 13 construction record
13. 14 as-built drawing
14, ventilation and air conditioning engineering data management sequence and content
14. 1 construction organization design (construction scheme)
14.2 the blue prints.the design, design change documents and negotiation records
14.3 material inspection list, ex-factory certificate and entry (test) inspection report of main materials, equipment, finished products, semi-finished products, accessories and instruments, unpacking inspection records of equipment, packing list of main equipment, commodity inspection certificate and installation instructions.
14.4 Acceptance Record of Concealed Works
14.5 installation and inspection records of engineering equipment (ventilator, dust removal equipment, electrostatic precipitator assembled on site, bag dust collector assembled on site, assembled clean room, dust-free draft hood, fan filter unit, muffler, fan coil, water pump and auxiliary equipment), air duct system and pipeline system.
14.6 pipeline test record
14.7 equipment single machine commissioning record
14.8 system has no record of joint debugging with production load.
14.9 debugging record of ventilation and air conditioning system
14. 10 refrigeration and heating system debugging record
14. 1 1 air volume and temperature test records
14. 12 test records of air ducts and water pipes
14. 13 cleanroom cleanliness test record
14. 14 quality acceptance records of inspection lots, disciplines and divisions.
14. 15 construction record
14. 16 as-built drawing
15, order and content of elevator engineering data collation
15. 1 construction organization design (construction scheme)
15.2 the blue prints.the design, design change documents and negotiation records
15.3 records of equipment inspection, factory certificate and entry and unpacking inspection.
15.4 handover acceptance record with building structure
15.5 Acceptance Record of Concealed Works
15.6 grounding resistance and insulation resistance test record
15.7 safety protection acceptance record
15.8 safety linkage test record of speed limiter
15.9 floor door and car door test record
15. 10 load test and safety device inspection records
15. 1 1 elevator operation record
15. 12 inspection report of elevator safety device
15. 13 engineering quality acceptance records of inspection lots, disciplines and divisions (sub-divisions)
15. 14 construction record
15. 15 as-built drawing
16, order and content of intelligent building data collation
16. 1 construction organization design (construction scheme)
16.2 design change documents and negotiation records
16.3 material inspection report, ex-factory certificate of materials and equipment, technical and approach inspection (test) report.
16.4 Acceptance Record of Concealed Works
16.5 system function determination and equipment debugging records
16.6 system technology, operation and maintenance manual
16.7 system management, operators and training records
16.8 system test report
16.9 system debugging record
16. 10 system power supply and grounding test report 16. 1 1 inspection batch, sub-item and divisional engineering quality acceptance record form
16. 12 construction record