Dredging engineering contract
With the continuous development of the spirit of the rule of law, people pay more and more attention to contracts, and we also use contracts more and more. Signing a contract is also one of the best ways to avoid disputes. So do you know how to write a legal contract? The following is a sample of dredging contract I collected for you. Welcome to share.

Dredging Project Demonstration Contract 1 I. Project Name:

Second, the project site selection

Three. Project content: (including the positive earthwork construction of the river channel and the ancillary works for completing the positive earthwork)

The work includes dam construction, dam demolition, flood control embankment and drainage embankment filling.

Four, engineering standards:

1. River standard: bottom width meter, bottom height meter and slope ratio. According to the river construction specification, the maximum error of the center line is about 20 cm, the error of the river bottom elevation is not more than+++3.0cm--20cm, and the average value is not higher than the design elevation; Bottom width; 30 cm, the average is not less than the design width; The local slope and overall slope shall not be greater than the design value (1: n), and the rest shall be implemented according to relevant technical specifications and standards.

2. Other requirements:

Five, civilized construction and engineering safety:

Party B shall seriously carry out civilized construction and do a good job in safety, and Party B shall be responsible for the economic compensation and safety accidents that do occur due to Party B's responsibility during construction.

Six, the construction time:

This project is day after day; Completed on, with a construction period of days.

Seven. Contract price and payment method:

The total earthwork quantity of this project is tentatively set as m3, the comprehensive unit price is RMB /m3, and the tentative contract price is RMB (in figures; Yuan). Payment by installment is:. The final settlement of the project shall be subject to the quantities approved by the supervisor.

Eight. Responsibilities of both parties:

Party A's responsibilities:

1. Before starting work, Party A shall define the relevant tasks and requirements of the project construction according to relevant documents and specifications.

2. Party A shall organize examination and approval in time after receiving the commencement application or commencement report submitted by Party B..

3. Party A shall provide relevant items for Party B to organize the construction according to the contents of the bidding documents or consensus.

Pieces.

4. Party A shall pay on time according to the payment method stipulated in this contract.

5. Party A shall timely coordinate the contradictions in the construction process.

Party B's responsibilities:

1. Party B guarantees that according to the contents of the contract (including the tender documents and written documents agreed by both parties),

Complete the project task on schedule with good quality, and press if it is overdue; RMB/day will be deducted as a fine.

2. Before the start of construction, Party B must go through all the formalities related to the construction according to the regulations, including: paying duplicate deposit RMB before signing the contract; Provide Party A with the construction plan; Commencement report, etc. Otherwise, Party B shall not start work. If Party B fails to go through the above procedures within three days, Party A will disqualify Party B from winning the bid.

3. During the project construction, if Party B terminates the project construction without justifiable reasons, Party A will not settle the cost of the constructed part, and will deduct the performance bond. The consequences arising therefrom shall be borne by Party B. ..

4. Party B shall actively coordinate and handle contradictions.

Nine. Others:

X. Matters not covered in this contract shall be settled by both parties through consultation.

XI。 This contract shall come into effect after being signed by the legal representatives or entrusted agents of both parties and stamped with the official seals of the unit respectively.

12. This contract is made in sextuplicate, including two originals and four copies, with each party holding one original and two copies.

Party A (official seal)

Legal representative (signature):

Party B (official seal)

Legal representative (signature or entrusted agent)

Model Contract for Dredging Project 2 Party A:

Party B:

I. Project name:

Second, the project site selection:

3. Project content: (including the main earthwork construction of the river channel and the auxiliary work of completing the main earthwork, including dam building, dam demolition, flood control embankment and embankment filling with drainage, etc.). ).

Four, engineering standards:

1. River standard: bottom width x meters, bottom elevation x meters, slope ratio x, according to river construction specifications, the maximum error of X center line is about 20XcmX, the error of river bottom elevation is not more than +3.0 cm-X-20 cm, and the average value of X is not higher than the design elevation. The bottom width is 30Xcm, and the average value is not less than the design bottom width; The local slope ratio is X 1: n (1 5%), and the overall slope of x is not steeper than the design value (1: n). Other aspects shall be implemented in accordance with relevant technical specifications and standards.

2. Other requirements:

Verb (abbreviation of verb) civilized construction and engineering safety: Party B shall seriously carry out civilized construction and do a good job in safety, and Party B shall be responsible for the X economic compensation and safety accidents that do occur due to Party B's responsibility during the construction.

Construction time of intransitive verbs: This project will be completed from XX to XX, XX, with a construction period of X days.

Seven. Contract price and payment method: the tentative total amount of earthwork of Project X is Xm3, the comprehensive unit price is X Yuan /Xm3, and the tentative total contract price is X Yuan (in figures: X Yuan). X is the installment plan. At the end of the project, the calculation of X shall be subject to the quantities approved by the supervisor.

Eight. Responsibilities of both parties:

Party A's responsibilities:

1. Before starting work, Party A shall define the relevant tasks and requirements of the project construction according to relevant documents and specifications.

2. Party A shall organize examination and approval in time after receiving the commencement application or commencement report submitted by Party B..

3. Party A shall provide X copies of relevant documents compiled by Party B according to the contents of the tender documents or consensus.

4. Party A shall pay on time according to the payment method stipulated in this contract.

5. Party A shall timely coordinate the contradictions in the construction process.

Party B's responsibilities:

1. Party B guarantees that according to the contract contents (including the bidding documents and written documents agreed by both parties), X will complete the project tasks with good quality on schedule, and will be fined RMB/day if it fails to do so.

2. Before starting construction, Party B must go through all the formalities related to construction according to the regulations, including: before signing the contract, X shall pay a duplicate deposit of X yuan; Provide Party A with the construction plan; Commencement report, etc. Otherwise, Party B shall not start work. If Party B fails to go through the above procedures within three days, Party A will disqualify Party B from winning the bid.

3. During the project construction, if Party B terminates the project construction without justifiable reasons, Party A will not settle the fees paid by X to the construction department, and impose a fine on the performance bond. The consequences arising therefrom shall be borne by Party B. ..

4. Party B shall actively coordinate and handle contradictions.

Nine. Others:

X. Matters not covered in this contract shall be settled by both parties through consultation.

XI。 This contract shall come into effect after being signed by the legal representatives or entrusted agents of both parties and stamped with the official seals of the unit respectively.

12. This contract is made in sextuplicate, including two originals and four copies, with each party holding one original and two copies.

Party A and Party B (official seal): Party B (official seal):

Legal representative (signature): (or entrusted agent) Legal representative (signature): (or entrusted agent)

XX year XX month XX day XX year XX month XX day

Model Contract of Dredging Project Owner 3:

Contractor:

Based on the principle of equality and mutual benefit, the following agreement is reached on the field road project of Puji Town Land Consolidation Project:

1. Responsibility of the Employer: Before the contractor enters the site, clear the obstacles in the construction area and provide the contractor with temporary leveling points and the location and buried depth of underground pipelines within the project scope.

2. Contractor's responsibility: c25 concrete is poured on the existing subgrade, with a width of 4m and a thickness of 16cm, and the project meets the standard of Class IV highway.

Third, the construction method requirements:

1, equipped with mixing equipment and vibrators, vibrators, channel steel, polishers, generators and pulp pumps required for construction.

2, concrete mixture ratio requirements meet the standards.

3, vibrating beam, vibrator must be in accordance with the standard operation, it is forbidden to appear not to use and cope with the construction.

4. The pulp pump and polishing machine should polish the concrete pavement for 3-4 times. It is forbidden to polish and polish dry cement on the concrete pavement.

5. Finish the brushing treatment after pulp lifting.

6, in the concrete pouring must be carried out within 72 hours, every one meter slit, slit requirements to cm,

7. If the above requirements are not met, the Employer has the right to refuse to pay the project payment.

Four, according to the actual engineering quantity and on-site visa settlement.

5. The contractor plans to enter the site to start construction.

Six, the contractor shall carry out the construction in accordance with the technical specifications for earthwork construction, and in accordance with the construction procedures and construction requirements provided by the employer.

Seven, the engineering structure beyond the provisions of article third, the employer shall give on-site visa, as the basis for future settlement.

Eight, each project completed 10000 square meters of quantities, pay 80% of the corresponding project funds; Pay 80% of the total project payment at the end of the project, and pay all the project payment after the project is accepted. Responsibilities of both parties: The Employer must ensure that the obstacles within the project scope are removed on time and shall not delay the contractor's construction progress.

This agreement is made in triplicate. Matters not covered shall be agreed separately.

Employer: (signature)

Contractor: (signature)

Model Contract of Dredging Project Employer 4: _ _ _ _ _ _ _ _ _ _ _ _ _; Contractor: _ _ _ _ _ _ _ _ _ _ _ _ _

Based on the principle of equality and mutual benefit, the following agreement is reached on the field road project of Puji Town Land Consolidation Project:

1. Responsibility of the Employer: Before the contractor enters the site, clear the obstacles in the construction area and provide the contractor with temporary leveling points and the location and buried depth of underground pipelines within the project scope.

2. Contractor's responsibility: c25 concrete is poured on the existing subgrade, with a width of 4m and a thickness of 16cm, and the project meets the standard of Class IV highway.

3. Construction method requirements:

1. Equipped with mixing equipment and vibrators, vibrators, channel steel, polishers, generators and pulp pumps required for construction.

2. The concrete mixture ratio should meet the standards.

3. The vibrating beam and vibrator must be operated according to the standard, and it is forbidden to be idle and cope with the construction.

4. The pulp pump and grinder need to polish the concrete pavement for 3-4 times. It is forbidden to polish and polish the dried cement on the concrete pavement.

5. Finish the brushing treatment after pulp lifting.

6. Within 72 hours after concrete pouring, it is necessary to cut the seam, and cut the seam every 5 meters horizontally, with a seam length of 5cm.

7. If the above requirements are not met, the Employer has the right to refuse to pay the project payment.

Four. According to the actual engineering quantity and on-site visa settlement.

The contractor plans to start work on March 26th.

6. The contractor shall carry out the construction in accordance with the technical specifications for earthwork construction and the construction procedures and requirements provided by the Employer.

Seven. When the engineering structure exceeds the provisions of Article 3, the Employer shall grant the on-site visa as the basis for future settlement.

Eight. Pay 80% of the corresponding project cost for every 65,438+0,000 square meters of project quantity; Pay 80% of the total project payment at the end of the project, and pay all the project payment after the project is accepted. Responsibilities of both parties: The Employer must ensure that the obstacles within the project scope are removed on time and shall not delay the contractor's construction progress.

This agreement is made in triplicate. Matters not covered shall be agreed separately.

Employer: _ _ _ _ _ _ (signature) Contractor: _ _ _ _ _ _ _ (signature)

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Dredging Project Demonstration Contract 5 Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

I. Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Two. Project location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

3. Project content: (including the main earthwork construction of the river channel and the auxiliary work of completing the main earthwork, including dam building, dam demolition, flood control embankment and embankment filling with drainage, etc.). ).

Four. Engineering standard: 1. River standard: bottom width _ _ _ _ meters, bottom elevation _ _ _ _ meters, and slope ratio _ _ _ _ _. According to the river construction specification, the maximum error of the center line is about 20 cm, the error of the river bottom elevation is not greater than +3.0 cm-20 cm, and the average value is not higher than the design elevation; The bottom width is 30cm, and the average is not less than the design bottom width; The local slope ratio is 1:n( 1 5%), and the overall slope is not steeper than the design value (1:n). Others shall be implemented according to relevant technical specifications and standards. 2. Other requirements:

5. Civilized construction and engineering safety: Party B shall conscientiously do a good job in civilized construction and safety, and Party B shall be responsible for the economic compensation and safety accidents that do occur due to Party B's responsibility during the construction.

Construction time of intransitive verbs: this project starts from _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Seven. Contract price and payment method: the total earthwork volume of this project is tentatively set at _ _ _ _ _ m3, the comprehensive unit price is _ _ _ _ _ _ yuan /m3, and the total contract price is tentatively set at _ _ _ _ _ _ _ _ _ yuan (in figures). Payment by installment is. The final settlement of the project shall be subject to the quantities approved by the supervisor.

Eight. Responsibilities of both parties:

Party A's responsibilities:

1. Before starting work, Party A shall define the relevant tasks and requirements of the project construction according to relevant documents and specifications.

2. Party A shall organize examination and approval in time after receiving the commencement application or commencement report submitted by Party B..

3. Party A shall provide relevant conditions for Party B to organize the construction according to the contents of the bidding documents or the consensus of both parties.

4. Party A shall pay on time according to the payment method stipulated in this contract.

5. Party A shall timely coordinate the contradictions in the construction process.

Party B's responsibilities:

1. Party B guarantees to complete the project tasks with good quality on schedule according to the contract contents (including the bidding documents and written documents agreed by both parties), and will be fined RMB/day if it fails to do so.

2. Before the start of construction, Party B must go through all the formalities related to the construction according to the regulations, including: paying duplicate deposit RMB before signing the contract; Provide Party A with the construction plan; Commencement report, etc. Otherwise, Party B shall not start work. If Party B fails to go through the above procedures within three days, Party A will disqualify Party B from winning the bid.

3. During the project construction, if Party B terminates the project construction without justifiable reasons, Party A will not settle the cost of the constructed part, and will deduct the performance bond. The consequences arising therefrom shall be borne by Party B. ..

4. Party B shall actively coordinate and handle contradictions.

Nine. Others:

X. Matters not covered in this contract shall be settled by both parties through consultation.

XI。 This contract shall come into effect after being signed by the legal representatives or entrusted agents of both parties and stamped with the official seals of the unit respectively.

12. This contract is made in sextuplicate, including two originals and four copies, with each party holding one original and two copies.

Party A (official seal): _ _ _ _ _ _ _ _ _ _; Party B (official seal): _ _ _ _ _ _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _ _ _ _ _; (or entrusted agent): _ _ _ _ _ _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _ _ _ _ _ _; (or entrusted agent):