Implementation date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Responsibility book of project target management contract
Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
In order to fully complete the main indicators such as 20XX annual output value, construction period, quality, safety and civilization, and cost saving, and clarify the relationship between rights, responsibilities and benefits of both parties, Party A has reached the following contract through negotiation:
I. Party B's commitment to the project management objectives:
(1) Party B guarantees to complete the project within days (the day after the commencement report is issued).
(2) Party B shall guarantee that the project is% excellent (in line with the quality requirements of the owner in the general contract of the project).
Carry out quality system certification and obtain annual inspection and external audit qualifications.
(3) Party B guarantees that the major safety accident rate of all construction projects in the whole year is zero; Medical expenses for minor injuries shall be controlled within one ten thousandth of the total project price.
(4) Party B shall ensure that the construction site meets the requirements of standardized management, and the incidence of various public security incidents shall be controlled within 0.000 of the total number of construction personnel;
(5) Party B shall ensure that the construction costs (including labor costs, materials costs, machinery costs and other indirect costs) of various projects throughout the year are controlled within the target cost limit.
(VI) Party B shall set up the main functional personnel of the project department according to the requirements of the competent government department. According to the overall work needs of the company, Party A may transfer Party B's technical director, budget officer, sample inspector and other post personnel at any time.
Two. After the completion of this project, Party A will assess, reward and punish Party B's above contracted indicators according to the detailed implementation rules.
Three. Party A's service management, inspection and supervision responsibilities to Party B. ..
(1) According to Party A's demand plan for funds, materials, machinery, tools and appliances approved by Party B, Party A guarantees to supply all kinds of resources needed by Party B in time. ..
(2) Actively develop engineering business, ensure the source of Party B's construction tasks, and ensure that Party B's construction activities can be carried out continuously and rhythmically.
(III) Guide and assist Party B to optimize the construction scheme, reform the construction technology, improve the quality assurance system, implement the post responsibility, implement the safety production responsibility system and various management systems of the project department, and promote the normal operation of project management.
(4) Regularly conduct process inspection, supervision and regulation on Party B's management objectives such as project cost, construction progress, project quality, safe production, civilized construction and comprehensive management, and assist Party B to ensure the smooth completion of all major management objectives.
(V) Regularly inspect, assess and evaluate the job responsibilities and performance of Party B's management personnel, and timely feedback the assessment results.
(VI) Assess Party B's completion of management objectives at the end of the year or after the completion of the project in a timely manner, and reward and punish Party B's assessment results according to the relevant provisions of the Detailed Rules for the Implementation of Economic Responsibility System for Target Management.
Fourth, other terms.
(1) According to the needs of the overall development plan, Party A needs to mobilize Party B's relevant management personnel, machinery, equipment and materials when necessary, and Party B shall understand and cooperate.
(II) In order to ensure the rest rights of Party B's management personnel and the actual situation of project construction, Party A decides that Party B's management personnel can rest for two days every month, and Party B's project manager will arrange flexibly according to the priority of the project construction progress, and the salary of management personnel will still be implemented according to the original regulations during holidays.
(3) If the expenses of all the reusable materials used by Party B on site cannot be determined according to the detailed rules for implementation, Party A shall separately prepare the calculation methods for lease, distribution, discount, recovery and scrapping.
(IV) In the process of target management, Party B shall submit the following materials to Party A in the corresponding time period:
(1) Project commencement stage: declaration form of initial quota plan for funds, labor, machinery, materials, tools and appliances required for project construction; General situation of management personnel of the project department, project commencement report, complete set of construction drawings, labor contracts of divisional projects, etc.
(2) Construction stage: weekly capital demand schedule, next week's machinery, materials and equipment mobilization schedule, monthly general labor expense declaration form, contractor's pre-knot labor expense declaration form, steel bar construction ingredient list, template layout, block masonry or block paving arrangement diagram, design modification change form, expense limit adjustment form, monthly cost control comparison table, monthly labor expense prepayment scheme, construction labor surplus and deficiency adjustment form, monthly completed construction output value report, etc.
(3) Completion acceptance stage: project completion acceptance record, quality evaluation report issued by supervision company, project cost evaluation report or final statement, completed project cost table, list of remaining materials of completed project, etc.
All the above materials that should have been submitted to the materials and financial departments are still submitted according to the original regulations, and the rest materials are submitted to the engineering contracting department of Party A. ..
Verb (abbreviation of verb) This responsibility letter is made in triplicate, one for each party and one for the company's investment audit center.
6. This responsibility letter shall come into effect in January after being signed by both parties, and shall be terminated after the project is completed, the assessment is completed and the rewards and punishments are cashed.
Party A: _ _ _ _ _ _ _ _ _ _ _ Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Authorized Agent: _ _ _ _ _ _ _ _ _ _ _ _ _ Representative: _ _ _ _ _ _ _ _ _ _ _ _ _ _
Date of conclusion: _ _ _ _ _ _ _ _ _ _ _ _
Responsibility Letter of Engineering Contract (2)
Party A: Shandong Construction Development Co., Ltd.
Party B:
Through negotiation, Party A and Party B reach the following agreement:
1. Party A contracts the project to Party B for construction, and Party A manages Party B as the project department of Party A, and only charges Party B the management fee of% of the total project amount. Details of the project are as follows (project name: project payment; Duration: contract content:)
Second, the management fee is settled when the owner pays the first project payment. After deducting the management fee, Party A shall pay it to Party B immediately after receiving it. If Party B is short of funds, Party A may pay some materials and workers' wages in advance, and Party B shall bear the interest at the monthly interest rate of 1.5% from the date of payment. After the project is completed, Party A and Party B shall settle accounts after the owner settles the payment. Party B shall not collect the project funds from the owner by itself, and all the project funds shall be paid to Party B after being collected by Party A. ..
Three. When signing this agreement, Party B knows and understands the contents of the construction contract signed between Party A and the owner or general contractor. Party B must carry out the construction according to the contents of the construction contract signed between Party A and the owner or general contractor. The construction contract signed between Party A and the owner or general contractor is fully binding on Party B. If Party A is responsible for the owner, Party B must also be responsible for Party A. The construction contract signed between Party A and the owner or general contractor is an annex to this contract.
4. Party B operates the project independently and is responsible for its own profits and losses. All expenses and responsibilities arising from the construction shall be borne by Party B, and Party A shall not bear any responsibilities. During the construction process, Party B shall not default on the supplier's material payment and workers' wages. If Party A bears civil liability for Party B's materials and workers' wages, Party B shall reimburse Party A, bear all the corresponding expenses and interests, and bear interest at four times the bank loan interest rate for the same period.
Verb (abbreviation of verb) The implementation activities of Party B's project department shall not violate national laws. If Party B has an industrial accident during the contract period, it shall be handled according to the relevant provisions of the state and bear the civil liability for compensation. If Party A undertakes the responsibility on its behalf, Party A has the right to recover from Party B. ..
6. Party B's project department has the right to operate independently, recruit employees by itself, and decide salary standards, adjust work and dismiss employees according to their work efficiency, physical condition, labor attitude and execution discipline.
Seven. During the construction and settlement, Party A shall provide assistance and relevant procedures for Party B's project department. Party B's project department is responsible for issuing project payment invoices to the owner. If Party B's project department requires Party A to issue an invoice for the project payment, Party B's project department shall pay corresponding taxes and fees to Party A separately.
8. During the contract period, Party B's project department will implement integrated contract construction, including quality, construction period, safety, material procurement, personnel and construction organization. During the construction period, Party B's project department must consciously safeguard the owner's corporate reputation, carry out the construction in strict accordance with the current national construction technical specifications, acceptance standards and construction drawings, and ensure that the project passes the owner's acceptance, safe construction, civilized construction and timely completion. In case of cutting corners or other quality and safety accidents or overdue delivery, all economic losses caused by the above problems and all responsibilities of the employer shall be borne by Party B's project department, and if criminal responsibility is required, it shall also be borne by Party B's project department.
9. Party A has the right to conduct comprehensive management and guidance on the project under construction and the construction site, and Party B's project department must unconditionally accept the management of the employer. If it is found that there are violations of quality and safety operation procedures or hidden dangers of quality and safety, Party A has the right to order it to stop work and make rectification. Those who disobey the management and violate the rules for many times are deemed to have intentionally damaged the reputation of the employer. Party A has the right to change the construction team unconditionally, and Party B's project department shall have no objection.
X in any of the following circumstances, party a has the right to terminate this contract.
1. Party B does not obey the management of Party A;
2. The project is overdue;
3, the project quality is not up to standard;
4. Arrears of wages for migrant workers;
5. The project management is chaotic and there are potential safety hazards;
1 1. Party B shall guarantee the project, and the warranty period shall be determined according to the contract between Party A and the owner. If Party B's work is overdue, Party B shall bear the overdue penalty of RMB yuan for each day overdue.
Twelve. Disputes arising from the performance of this Agreement shall be settled by both parties through friendly negotiation; If negotiation fails, it shall be handled by Dongchangfu District People's Court.
Thirteen. This agreement shall come into force after being signed or sealed by both parties. If there are any matters not covered in this agreement, both parties shall make supplementary provisions through consultation. Supplementary terms have the same effect as this agreement.
This agreement is made in quadruplicate, with each party holding two copies.
Party A: Shandong Construction Development Co., Ltd.
Party B: _ _ _ _ _ _ _ (signature)
Date, year and month