Sample Agreement on Cracks in Rural Houses (5 general articles)
In a society where development is accelerating, agreements are closely related to our lives. The agreement is signed by two or more parties. The best specification of rights and obligations. So how to write an agreement to maximize its effect? Below is a sample agreement on rural house cracks that I compiled for you (5 general articles). You are welcome to read it. I hope you will like it.
Agreement on Cracks in Rural Houses 1
Party A:
Party B:
Party A and Party B reached an agreement, in accordance with the "People's *Relevant provisions of the Contract Law of the People's Republic of China, the following agreement is hereby reached regarding Party A's entrustment of Party B's _________, and *** both parties shall abide by and implement it.
1. Project name:
____________
2. Project quantity and specifications:
Total project cost: 18,000 yuan (10,000 yuan) Eight thousand yuan).
3. Project deadline:
It will be completed within 15 days from the date of signing.
4. Payment (settlement) method:
1. Bank transfer.
2. There will be no tax evasion, tax evasion or other illegal behavior during the performance of this contract, and each party shall bear all taxes related to this contract and the execution of this contract levied by relevant Chinese authorities in accordance with Chinese tax laws.
3. Party B shall provide formal invoices that comply with the provisions of national tax laws. If Party B provides false invoices or the contents of the invoices are untrue, Party A has the right to unilaterally terminate the contract and never cooperate with Party B. Party B shall be responsible for any resulting losses. all economic losses and related legal liabilities.
4. After the project is completed, the payment will be paid in one lump sum upon acceptance.
5. Dispute Resolution
When a dispute arises between the two parties and cannot be resolved through negotiation, either party may bring a lawsuit to the People's Court where Party A is located.
6. Liability for breach of contract
1: Either party to the contract is fined or causes economic losses to the other party due to performance of the contract or violation of national laws, regulations and relevant policies. The responsible party shall be responsible for all losses and compensate for the economic losses caused to the other party. If no losses are caused, 5% of the total contract price shall be paid as liquidated damages;
2. The contract cannot continue due to one party's reasons When performing, the party B shall promptly notify the other party, handle the contract termination procedures, and the responsible party shall compensate the other party for the corresponding economic losses;
3. If the construction period is delayed due to Party B's reasons, the contract payment shall be made to the other party for each day of delay. 1% of the total cost is liquidated damages.
7. Supplementary Provisions
1 This contract is signed directly by Party A and Party B. The contract is made in four copies, with Party A holding three copies and Party B holding one copy. This contract will come into effect after being signed (sealed) by Party A and Party B.
2. The project shall not be subcontracted after the signing of this contract.
3. Party B will be responsible for any safety issues such as personal casualties, property losses, etc. that occur during construction, transportation, loading and unloading.
4. The contract will be automatically terminated after completion.
5. The attachments to this contract are an integral part of this contract and have the same legal effect as this contract.
Party A (Signature) Party B (Signature)
(Seal) (Seal)
Signing date: _____ year _________ month ______ _Japanese Rural House Cracks Agreement 2
Party A:
Party B:
Reached by both parties on the basis of equality, voluntariness and consensus through consultation Consensus and sign the following agreement to ensure that both parties comply with and implement it:
1. Maintenance standards and requirements
1. Party B voluntarily chooses to repair the house and signs this agreement with Party A contract.
2. House repairs must be carried out without affecting the planning and the safety of the household owner and neighbors.
3. Maintenance projects: roof renovation, etc.
4. Maintenance project form: labor contract, no materials, quality and safety included.
5. Party B must ensure the quality and safety of maintenance work. Party B will be responsible for all accidents caused by quality and safety.
6. Party B requires that Party B be responsible for cleaning up the mud and debris caused by the project within the time specified by Party A.
7. The maintenance period is under normal weather.
2. Maintenance payment issuance
1. The total maintenance payment is RMB yuan paid to Party B first for living expenses and materials.
2. After the maintenance project is completed, Party A shall pay the remaining amount of RMB after it is determined to meet the maintenance standards.
3. During the maintenance period, Party B will solve the housing problems by itself, and Party A will not make any form of subsidies or arrangements.
4. Within one year after the repair is completed, if there are quality problems in the repair part (such as roof leakage, etc.), Party B shall provide warranty within one day after receiving Party A’s notice.
5. This contract comes into effect when signed and sealed by both parties. It is made in two copies, with Party A and Party B each holding one copy.
Party A (Signature) Party B (Signature)
Date of Signing: Rural House Crack Agreement 3 on _________month_____________year
Party A:
Party B:
In accordance with the "Economic Contract Law of the People's Republic of China" and the relevant regulations on renovation and decoration, Party A and Party B shall act on an equal footing and Reach an agreement on the basis of voluntary consultation and consensus, and sign the following contract to ensure that both parties abide by it:
Article 1 Maintenance Standards and Requirements
1. Party A Party B is entrusted with house maintenance
2. Maintenance projects: old house renovation, wall renovation, circuit and bathroom waterway renovation. Door shifting and installation, ventilation fan installation, bathroom facilities installation, lighting installation;
3. Maintenance requirements:
① Party B shall organize a maintenance construction team by itself and be responsible for the safety of the construction site Quality work, strengthen the safety precautions for construction personnel, and ensure that nothing goes wrong during construction. Party B will be fully responsible for all safety accidents caused by poor management.
② Party B shall complete the construction within the time designated by Party A and be responsible for cleaning up the remaining mud and debris caused by the project. If the debris is not cleaned up within the time limit, Party A will organize personnel to clean up the work at Party B's expense. Deducted from the balance paid by Party A to Party B.
③ Party A is only responsible for the procurement of materials, and Party B is responsible for construction tools, such as formwork, scaffolding, etc. required for construction.
Article 2 Maintenance Payment
1. In accordance with the "Management Measures", Party A will advance RMB 10,000 to Party B as an advance payment for maintenance costs during the contract period.
2. From the date of signing the contract, Party B must complete the work within 10 days, otherwise a liquidated damages of 2% of the total maintenance cost will be deducted.
3. The two parties negotiate that Party B pays Party A to renovate the commercial house in total, and the total cost is 10,000 yuan. After Party A passes the inspection and acceptance, the balance will be paid to Party B in full.
4. Party B should guarantee the quality of the house being repaired. If there is any problem with the quality of the project within 2 years, Party B should send someone to inspect and repair it within 2 days.
Article 3 Contract Period
Matters not covered in this contract shall be resolved by both parties through friendly negotiation. If the matter cannot be resolved, a lawsuit may be filed in the court where the contract was signed.
This contract comes into effect when signed and sealed by both parties. It is made in two copies, with Party A and Party B each holding one copy.
Party A (signature): Party B (signature):
p>
Signing date: Rural House Crack Agreement 4 on _________month__________ year
Party A:
Party B:
Based on the principles of mutual benefit and mutual responsibility, both parties, A and B, have reached the following agreement through careful negotiation and must abide by it:
1. Items that Party A entrusts Party B to repair:
p>
____________
2. Total project amount:
____________
3. Payment procedure:
Type A - Contract After it takes effect, Party A will advance to Party B for a second time when the progress of the project exceeds half, and the balance will be settled after the project is completed and accepted (5% of the total project price will be reserved as a project quality deposit, which will be paid off half a year later).
Category B—General projects are constructed first and paid later. This project is paid according to the method.
4. Party A and Party B negotiate the construction time:
_________month_______day, _____year
5. In order to ensure the safety and smoothness of the maintenance project To proceed, Party A shall assist Party B in:
1. Provide necessary water, electricity and other facilities and other conveniences.
2. Provide a safe place to store tools and construction materials.
6. For Party A’s operation and interests, Party B shall do the following during construction:
1. Enter and exit the construction area in accordance with Party A’s safety regulations.
2. The operation time arrangement will not affect Party A’s normal business.
7. Acceptance standards and methods:
Determine with reference to the acceptance specifications for building construction.
8. After the project is accepted and accepted:
Party A shall pay the maintenance project price in full unconditionally.
9. Liability for breach of contract:
1. During the validity period of the contract, neither party shall terminate the contract at will without the consent of the other party.
2. Penalty provisions: Either party must compensate the other party for economic losses caused by breach of contract.
10. Matters not covered in the contract
Supplements will be made after negotiation between the two parties.
11. This contract is in duplicate, with Party A and Party B each holding one copy. It will take effect after being signed and sealed, and shall be archived for future reference.
Party A’s unit: Party B’s unit:
Party A’s representative: Party B’s representative:
Rural House Crack Agreement on _________month__________ Book 5
Party A: (hereinafter referred to as Party A)
Party B: (hereinafter referred to as Party B)
In accordance with the Contract Law of the People's Republic of China ", "Construction Project Quality Management Regulations" and other relevant laws and administrative regulations, following the principles of equality, voluntariness, fairness and good faith, the two parties reached an agreement on the maintenance of ___ Primary School children's house and entered into this contract.
1. Project overview
1. Project name: ___Kindergarten house maintenance, etc.
2. Project location: ___ Primary School.
3. The contract period: the start date is ____year________month_______day, and the completion date is ____year_______month_______day
2. Engineering service form
Contracting work, materials, construction period, and quality.
3. Settlement method
Party A and B and the supervisor shall counter-sign the technical contact form on the parts to be repaired and the quantity of the work. The quantity of the work shall be signed by Party A, B and the supervisor. The signed and confirmed content will be used as the basis to determine the total project cost.
4. The total project price
It is tentatively set at RMB 15,000 (the final settlement value shall be subject to the settlement value confirmed by Party A and Party B).
5. Project Quality Supervision, Inspection and Acceptance
During construction, Party B must strictly comply with national and industry standards and enterprise specifications and the provisions of this contract, and accept inspections from Party A at any time. , and provide convenient conditions for inspection and inspection. Party B shall promptly rectify the problems raised by Party A. After the maintenance project is completed, Party A and Party B shall jointly inspect and accept the project. During the completion acceptance, for the project quality problems confirmed by Party A that have not been repaired, Party B will be responsible for continuing the repairs according to Party A's requirements and assuming overdue liability.
Party A (seal):
Party B (signature):
_________month_______day;