Commitment letter of project management
In today's society, commitment letters appear in our field of vision more and more frequently. Whether the letter of commitment is legally binding depends on specific issues. You didn't even know when you wrote the letter of commitment? The following is the project management commitment letter I compiled for you, for reference only. Let's have a look.

Commitment letter of project management 1. "Two Districts and Five Roads" Resettlement Housing Project in Old City Reconstruction. The planned investment is 425 million yuan; Image progress: in the first phase (g-a 13 plot), 2 buildings completed the capping of the main structure, 4 buildings completed the main structure of 15 floors or above, and 6 buildings completed the basement structure; The second phase (g-a 12 plot) of pile foundation engineering was fully completed, and the earthwork excavation was completed by 20%; It's done.

2. The old city reconstruction and resettlement housing project of shanty towns in plot B ... plans to invest 65 million yuan; Image progress: complete the pile foundation project; Static load dynamic measurement; Foundation pit support and excavation; Basement project;

Third, make a commitment

The construction of resettlement housing project is the key to expropriation and resettlement, which is related to the vital interests of relocated households and social stability. In order to speed up the resettlement progress, realize the gradual change of expropriation and resettlement from "waiting room" to "waiting room", intensify the work, speed up the progress, clarify the tasks and responsibilities, vigorously promote the construction of "two districts and five roads" and the shantytown renovation and resettlement project of plot B, and complete the annual investment of 490 million yuan.

1. Ensure the safety and quality of the project. Adhere to the policy of "safety first, prevention first", fully implement the responsibility system for production safety, and build safety projects. Strengthen the supervision and management of project quality, strictly supervise the construction unit to carry out construction according to the engineering design requirements and engineering construction standards and procedures, and strive for high-quality projects.

2. Accelerate the progress of the project. The construction conditions of affordable housing projects are poor and the construction is difficult. Under the condition of ensuring the safety and quality of the project, increase the investment in capital and machinery and equipment, speed up the progress of the project, build resettlement houses as soon as possible, and let the relocated households move into their new homes as soon as possible.

3. Implement the sunshine project. Strictly abide by the relevant laws and regulations of engineering construction, operate in accordance with the relevant provisions of engineering construction project bidding, strictly regulate the management and use of construction funds, and strive to build a clean project and a sunny project.

20xx March 25th

Project Management Commitment Letter 2 Dear xxx:

According to the company's "management policy" and "people-oriented" principle, our project management department makes the following commitments to the owner and the society:

1, in the process of production and construction, according to the identification of various hazards and unfavorable environmental factors, the factors such as falling objects, dust, sewage and noise that may occur in the construction process are comprehensively controlled. Minimize or prevent accidents and adverse effects on the environment.

2, prevention first, strengthen publicity, comprehensive planning, reasonable prevention, improve the process. Ensure the implementation of safety resources, ensure the realization of safety management objectives, and strive for the best economic benefits for enterprises.

3. Strictly abide by the laws, regulations, norms and standards on safety management and environmental management promulgated by the state and local government departments.

Project Manager: ××××××

* * * Year * * Month * * Day

Project management commitment letter 3 Once our company wins the bid, in the implementation stage, our company promises to fulfill the following terms:

1. There is no subcontracting or illegal subcontracting in the implementation stage; However, unless it is approved by the employer and approved by the tenderer.

2. The main management personnel and main mechanical equipment listed in the tender documents can be in place and play a corresponding role during the construction period.

3, our main management personnel in the process of project implementation, will actively cooperate with the owner, obey the supervision, respect the design.

4. If one of the above conditions is not met, depending on the seriousness of the case, Party A has the following rights: 4. 1 fine until the performance bond is confiscated. 4.2 Termination of the Contract.

4.3 It shall be ordered to stop work for rectification and impose a penalty of 1-2% of the bid-winning contract price.

Bidder: (with company seal)

Legal representative (or entrusted agent): (signature)

date month year

buying price

Bidder: (with company seal)

Legal representative (or entrusted agent): (signature)

date month year

Unit price analysis table

Project number: project name: work content: single price:

Bidder: (with company seal)

Legal representative (or entrusted agent): (signature)

date month year

List of general contracting projects

Project number: Project name:

Bidder: (with company seal)

Legal representative (or entrusted agent): (signature)

date month year

Composition table of grouped engineering quotation

Unit: Yuan

Bidder: (with company seal)

Legal representative (or entrusted agent): (signature)

date month year

Project management commitment letter 4 Dear xxx:

In order to further improve the operation and construction management responsibilities of urban construction projects and ensure that the project construction can achieve the construction operation management objectives of "ensuring quality, safety and progress", our project construction team has made the following commitments on the basis of earnestly fulfilling the contract agreement on project management and safety production responsibility signed with the project management department and combining with the actual situation of the project:

1. Our construction team promises not to subcontract the project undertaken to others or subcontract it to others in the form of subcontracting after dismemberment. If the employer agrees to subcontract, it shall subcontract to a legal entity with corresponding qualifications. The expenses of this project and other related expenses will be paid by us.

Second, ensure that all construction materials are synchronized with the construction progress, and put an end to memoirs and fraud. Do not assign outsiders to enter the project for management, and put an end to the phenomenon that the construction team is not responsible for signing the project management data.

Three. Promise to manage the quality, safety and progress of the project, fulfill all the obligations stipulated in the construction contract signed by the company and the construction unit (the employer) and bear all the responsibilities.

Iv. promise that the laborers used in this project will handle the labor agreement and related insurance in accordance with relevant national regulations and company requirements. Do a good job in three-level safety education for construction personnel. Do a good job in the safe and civilized construction management of the construction site, and bear all kinds of expenses arising therefrom.

Five, to ensure that the project pays labor wages on time, refuses to default, and bears relevant responsibilities and delays.

Six, commitment to project completion acceptance after delivery, in accordance with the requirements of the contract in a timely manner for project settlement, settlement of all arrears (including labor costs, materials costs, rental fees, utilities, etc.). ) The construction team is responsible for the settlement.

Seven. Commitment to abide by the company's relevant regulations on construction management, safety and quality management, financial management and operation management. Promise to unconditionally accept the company's punishment for not implementing the company's relevant regulations and damaging the company's interests and image, and bear corresponding responsibilities.

Eight, promise to be responsible for all safety responsibilities.

Construction team:

Representative of construction team:

Date, year and month

5 Xiamen Municipal Planning Commission Project Management Commitment Letter:

My unit is entrusted to undertake the engineering design of the bell tower project. Now the project formally applies for planning approval procedures.

My unit is aware of the contents of Articles 47 and 63 of the Measures for the Implementation of Fujian Province. In order to fulfill the obligation of good faith, our unit promises that the approved scheme design will be based on national, provincial and municipal technical standards and norms, and carry out sunshine analysis, and calculate the planning technical and economic indicators such as land area, building area, building height, floor area ratio, building density, green space rate and parking berth, and be responsible for the authenticity and accuracy of the analysis results and indicators.

In case of violation of the above commitments, our unit will voluntarily bear corresponding legal responsibilities.

Design unit: (official seal of the unit)

Legal representative (or authorized client) (signature)

date month year

Project management commitment letter 6 According to the company's "management policy" and "people-oriented" principle, our project management department makes the following commitments to the owners and the society:

1, in the process of production and construction, according to the identification of various hazards and unfavorable environmental factors, the factors such as falling objects, dust, sewage and noise that may occur in the construction process are comprehensively controlled. Minimize or prevent accidents and adverse effects on the environment.

2, prevention first, strengthen publicity, comprehensive planning, reasonable prevention, improve the process. Ensure the implementation of safety resources, ensure the realization of safety management objectives, and strive for the best economic benefits for enterprises.

3. Strictly abide by the laws, regulations, norms and standards on safety management and environmental management promulgated by the state and local government departments.

Project manager: xxx

Xx year xx month xx day

Commitment letter of project management 7 In order to make the safety management of the construction site of our project department more standardized, scientific and standardized, further improve the safety management level of our project department, better comply with the requirements of national, local and company laws, regulations and rules on production safety, and combine the actual situation of our project department, our project department solemnly promises to Party A to ensure the health and life and property safety of all employees on the construction site, prevent and reduce production safety accidents, and effectively protect the environment and surrounding pipelines.

1. Seriously implement the laws, regulations, mandatory standards, rules and regulations and safety regulations of the state, superiors and Party A on safety production and labor protection, take the first responsibility for the safe and civilized construction and environmental protection of this project, and implement all management regulations formulated by Party A in the process.

2. Conscientiously implement the safety policy of "safety first, prevention first" and earnestly implement the relevant provisions of national laws, regulations, standards and regulations; Establish and improve the safety production management organization and implement the responsibility system for safety production.

3. Strengthen organizational leadership, establish and improve the safety network of the project management department, run the safety production guarantee system on the construction site, hold regular meetings of the leading group for safe and civilized construction and environmental protection, and solve major problems in safety production in time; Organize safety production inspection and implement rectification measures for major accident hazards.

4. Ensure safe production on the construction site, take necessary safety measures according to regulations, maintain production devices and equipment, improve the safety of production devices and improve labor and production conditions; Processes and equipment that endanger production safety and are explicitly eliminated or prohibited by the state shall not be used.

5. Conscientiously implement the principle of "five simultaneities", that is, plan, arrange, check, summarize and compare the production work, and at the same time, plan, arrange, check, summarize and compare the safety work.

6. Continuously improve the safety knowledge and management ability of on-site management personnel, do not command in violation of regulations, check the implementation of various rules and regulations on production safety, promptly correct dereliction of duty and violations, and put an end to dereliction of duty.

7. Support the work of safety personnel in this project, actively carry out various safety activities, strive to create a healthy and safe cultural atmosphere, and provide a good workplace for employees.

8, to achieve the goal of no accidents, no pollution, no personal injury, civilized construction, no social complaints and media exposure, and strive for the first-class level of "civilized construction site" management.

9. Revise and improve the emergency rescue plan for engineering safety accidents, and be responsible for directing on-site emergency rescue work. Solve and implement the problems existing in the plan, supervise the emergency rescue drills, evaluation and revision, and ensure the effective implementation of the emergency rescue plan. When a production safety accident occurs in the company, report it to Party A and the superior competent department at the first time, seriously organize emergency rescue of the accident, and cooperate with the accident investigation and handling.

The above is the commitment of this project department, which will be earnestly performed in the project construction. If you violate your wishes, you must bear the corresponding responsibilities.

Commitment letter of project management 8 In order to ensure that the project undertaken by our company meets the requirements of "excellent project" and "safe and civilized construction site" and realize the company's safety management objectives, during the construction process, we promise:

1, before construction, there are detailed construction layout and special construction scheme in the construction organization design. Transportation roads are smooth, temporary water and electricity lines are arranged reasonably and effectively, and temporary facilities such as warehouses, workplaces, main machinery and equipment locations and offices meet safety requirements. The construction scheme is highly targeted, the construction method can guide the construction production scientifically, and various technical measures can ensure the production safety.

2, construction management and technical personnel are familiar with the provisions of the construction engineering safety technology operating rules, and all types of workers are familiar with this type of work safety technology operating rules. Workers who don't understand the safety technical regulations and have no clear safety management objectives are not allowed to enter the construction site to participate in the construction, and the education rate of workers is guaranteed 100% during the construction.

3. Before construction, the safety officer shall conduct safety technical disclosure and safety technical operation procedures education for the team members. No construction is allowed without a construction plan and safety technical measures. During the construction, the casualty accident rate is 0, the serious injury accident rate is 0, and the general minor injury accident is controlled at 1.5‰.

4. At the entrance of the construction site, contents such as "construction announcement and five standards and one drawing" will be set as required. Safety propaganda slogans should be set up on the construction site, and safety signs should be hung on dangerous parts. 5. All the construction equipment on site will be listed and stacked according to the construction layout, so as to be neat, beautiful and safe. The stacking of various materials should not exceed the specified height, and the spacing between walls should be 50cm. Stones, timber, steel pipes, fittings, construction and domestic garbage in and around the construction site will be piled up separately and cleaned up in time.

6, strengthen the safety supervision and inspection system, timely investigate and deal with potential safety hazards and correct illegal operation behavior, and will earnestly make safety records.

7. Establish the responsibility system for fire control safety on the construction site, divide the fire control responsibility area and implement it to people, and equip the site with sufficient fire control equipment and facilities. Open flame operation must be approved before operation.

8. Strengthen electricity management, public security management, canteen hygiene management and employment system management, and conduct regular physical examinations for personnel engaged in dangerous operations to prevent accidents such as poisoning, heatstroke, explosion and electric shock.

9, safe and civilized construction, coordinate the adjacent relationship around the site. Don't worry about the people, no complaints, and so on. 10 strive for a standardized and civilized construction site at the municipal level.

Our company will fully cooperate with relevant departments of your company in planning management, technical quality management, material management, fund allocation and safety construction management, so as to ensure that the project is completed on time and with good quality. The main measures are as follows:

(1) Select our excellent project manager and skilled technical team to carry out the construction in strict accordance with the schedule.

(2) The project engineering department is responsible for submitting the overall time limit for a project, actively coordinating the arrival time of 3M Company and other major materials, and carrying out acceptance and warehousing, and dividing the reasonable placement areas according to types. Reasonable distribution to the construction team, arrange construction water, electricity and materials piled up for safekeeping.

(3) Specific to the daily construction progress plan, labor plan and material mobilization plan, report to your company for sample formulation.

(4) Hold a regular project meeting every 3-5 days, which shall be presided over by the supervisor and attended by your unit coordinator and project manager department. Through the project regular meeting system, improve the relationship between construction, supervision and your company, coordinate various problems in the construction process, and ensure the smooth progress of the project.

(5) When the project meeting is held, the project leader will submit a weekly work report and a work plan for next week to your company. In the report, the progress of the project will be described in detail, and the detailed plan of progress, materials, labor, equipment and funds will be detailed in the plan.

(6) Keep a construction diary carefully, and record the number of workers, machinery, materials transported to the site and the weather conditions every day for the owner to refer to at any time.

(7) Pay full attention to the owner's instructions, and the site management personnel shall record the owner's instructions in writing at any time and carry them out. Second, quality and safety: consciously accept the supervision and inspection of the owner, supervision unit and relevant management departments on the construction quality and safety of the construction project, and promptly correct the problems raised in the inspection.

Make the following commitments in terms of quality (including warranty) and safety:

(1) Obtain the qualification certificate of corresponding level according to law, and undertake the project within the scope permitted by its qualification level. Shall not subcontract or illegally subcontract the project.

(2) Establish a quality responsibility system and be responsible for the construction quality of building projects.

(3) Carry out the construction according to the engineering design drawings and construction technical standards, and do not modify the engineering design or cut corners. In the process of construction, if mistakes are found in design documents and drawings, comments and suggestions shall be put forward in time.

(4) Establish and improve the engineering quality inspection system, strictly manage the process, and check and record the quality of concealed works.

(5) Establish and improve the education and training system, and strengthen the education and training for employees; Personnel who have not received education and training or failed the examination shall not work at their posts.

(six) to fulfill the obligation of quality warranty of construction projects according to law.

(7) The principal is fully responsible for the safety production of the unit according to law. Establish and improve the safety production responsibility system and safety production education and training system, formulate safety production rules and regulations and operating procedures, ensure the investment of funds needed for the safety production conditions of the unit, conduct regular and special safety inspections on the construction projects undertaken, and make safety inspection records.

(8) The person in charge of the project shall be a person with corresponding professional qualifications, who shall be responsible for the safe construction of the construction project, implement the safe production responsibility system, safe production rules and regulations and operating procedures, ensure the effective use of safe production expenses, organize the formulation of safe construction measures according to the characteristics of the project, eliminate the hidden dangers of safety accidents, and report the safety accidents in time and truthfully.

(9) Establish a safety production management organization and equip full-time safety production management personnel. Full-time safety production management personnel are responsible for on-site supervision and inspection of safety production. Timely report the hidden dangers of safety accidents to the project leader and the safety production management organization; Those who command or operate in violation of regulations should be stopped immediately.

(10) According to the changes of different construction stages, surrounding environment, seasons and climate, corresponding safety construction measures should be taken at the construction site. If the construction site temporarily stops construction, do a good job in site protection. Separate the office, living area and working area of the construction site and keep a safe distance; The site selection of office and living quarters meets the safety requirements. Workers' meals, drinking water, rest places, etc. Meet health standards. Staff quarters shall not be set up in uncompleted residential flats.

(1 1) Establish the responsibility system for fire control safety on the construction site, determine the person responsible for fire control safety, formulate various fire control safety management systems and operating procedures such as fire, electricity, inflammable and explosive articles, set up fire exits, fire water sources, equip with fire control facilities and fire extinguishing equipment, and set up obvious signs at the entrance to the construction site.

(12) Operators shall abide by the mandatory standards, rules and regulations and operating procedures for safe construction, and use safety protection appliances and mechanical equipment correctly.

(13) Purchase and lease safety protection appliances, machinery and equipment, construction tools and accessories with production (manufacturing) licenses and product certificates, and conduct inspection before entering the construction site.

(14) Conduct safety education and training for managers and operators at least once a year, and record the education and training in personal work files. Take out accidental injury insurance for personnel engaged in dangerous operations on the construction site.

Guangdong huaxinjian construction co., ltd

20xx June 26th

Project Management Commitment Letter 9 (Name of the Tenderee): _ _ _ _ _ _ _

I (name) am the "legal representative" of (bidder), and hereby promise:

After our unit won the bid in (project name), if the construction management personnel of the project department promised in the bidding documents are not in place, our unit is willing to unconditionally accept the following treatment from the tenderer:

1, before the project starts, no matter whether there are force majeure reasons, if all the construction management personnel of the project department promised in our bidding documents can't be put on record through the dynamic information system of quality and safety of construction projects in Fujian Province, we will pay liquidated damages to the tenderee according to the amount stipulated in Article 2 of this commitment, otherwise we are willing to give up the bid and bear corresponding legal responsibilities;

2. After the project starts, except for force majeure, if our unit changes the project manager or technical director of the project department, each person shall pay the tenderer a penalty of not more than 1% of the total contract price and at least 100,000 yuan (the specific amount is specified in the tender documents); Other personnel shall pay the tenderer a penalty of not more than three thousandths of the total contract price and not less than thirty thousand yuan each time (the specific amount is specified in the tender documents).

Bidder: _ _ _ (with official seal of the bidder)

Legal Representative: _ _ _ _ _ _ (signature or seal)

Project management commitment letter 10 person in charge (signature): project name: promise to be responsible for the quality, progress and safety production of this project; Responsible for arranging and solving all the capital turnover and manual and mechanical resettlement matters involved in this project.

Ensure the construction quality of this project, ensure the construction progress, and avoid major production safety accidents and social stability.

(This undertaking is made in duplicate, one for the office and one for the engineering department. )

Date:

Commitment letter for project management to (the tenderer) 1 1:

As a bidder participating in (project name) project, according to the relevant documents of the state, autonomous region and Nanning, we hereby promise to the tenderee:

1. Once winning the bid, we guarantee that the migrant workers' wage security fund will be fully transferred to the special account for migrant workers' wage security fund set up by the municipal finance department within 7 working days from the date of issuing the bid-winning notice in accordance with the provisions of N.F.F. [20xx] No.51. Once the contracted projects are in arrears with the wages of migrant workers and workers, the financial department will first allocate them from our migrant workers' wage security fund. If the migrant workers' wage security fund is not paid in full and on time after winning the bid, the qualification for winning the bid will be cancelled.

2. Once winning the bid, we guarantee to strictly implement the relevant provisions of Gui Jianshi [20xx] No.22 Management Rules for Safety Protection and Civilized Construction Measures in Guangxi Zhuang Autonomous Region during the construction process to ensure that all safety protection and civilized construction measures of the construction project are put in place. If we fail to implement the provisions of Annex I of Gui Jianzhi [20xx] No.22 in the project contracting, we are willing to accept the punishment of the construction unit and relevant competent departments in accordance with relevant regulations.

3. Once winning the bid, we guarantee to strictly implement the relevant provisions of Nanning Municipal People's Government's Decree No.32 "Decision on Amending the Management Regulations on Bulk Cement and Ready-mixed Concrete in Nanning" in the construction process, so as to ensure the use of bulk cement and ready-mixed concrete in the construction project as required. If we fail to comply with Decree No.32 of Nanning Municipal People's Government in project contracting, we are willing to accept the punishment of the construction unit and relevant competent departments in accordance with relevant regulations.

Bidder: (Seal)

Legal representative or authorized agent: (signature or seal)

Date: Year Month Day

Project Management Commitment Letter 12 According to the company's project responsibility management system, I accept the arrangement of the company, take full responsibility for project management, and promise to the company as follows:

First, strictly fulfill the contract between the company and the general contractor.

2. To handle all affairs of the construction site within the scope authorized by the company.

Three. Take full responsibility for the quality, safety and progress of this project.

Fourth, sign labor contracts with migrant workers.

5. Accept the company's supervision over the use of funds to ensure that the wages of migrant workers are in place in time.

Six, voluntarily undertake equipment, auxiliary materials and turnover materials.

7. If the project needs a deposit, it shall be borne by me, and the willingness to return the deposit will not affect the wages of migrant workers. If there is any, the company has the right to pay the wages.

Eight, obey the relevant provisions of the company, according to the requirements of the company to develop project management system.

Nine, according to the total cost of the project to the company: management fee profit.

Tax, and bear the salary of the project management department personnel.

Ten, bear all the economic responsibility of this project, self-financing.

XI。 This letter of commitment has the same legal effect as the project contract.

Twelve. Others:

Project undertaker:

date month year

Project Management Commitment Letter 13 In order to ensure the safe, clean and efficient operation of various construction projects and maintain the image of leading cadres in politics, according to the relevant provisions that leading cadres shall not interfere with the construction of engineering projects in violation of regulations, I solemnly promise:

A, strictly abide by the "China * * * production party leading cadres in party member several guidelines" and other disciplines, and never violate the provisions of laws, regulations or rules of procedure, using the convenience of authority or position, to the relevant departments, units or relevant personnel to specify, incite, hint, etc. , affecting the normal development of the project construction or interfering with the normal supervision and law enforcement activities.

Second, strictly implement the regulations on project approval, bidding, land transfer, planning management, quality supervision, safety production, environmental protection, fund arrangement and use, and never interfere with specific activities in the field of engineering construction in violation of regulations.

The third is to strictly strengthen the management of relatives, friends, spouses, children and staff around them, and never allow them to use their authority and position to intervene in the project construction for personal gain.

Four, strictly abide by the provisions of honesty and self-discipline, and never ask for other people's property in the construction management of the project, or accept or accept other people's property in disguise.

Five, actively support the law enforcement and discipline departments to investigate and deal with cases of violation of law and discipline in the field of engineering construction, and never use the influence of authority or position to hinder the investigation and handling of cases of violation of law and discipline in the field of engineering construction.

The above commitments please be supervised by cadres and the public.

Project Management Commitment Letter 14 Engineering Department: _ _ _ _ _ _

My project: _ _ _ _ _ _

Project Overview: _ _ _ _ _ _

Project type: housing construction project; Municipal engineering; Water conservancy and hydropower projects; Earthwork; Steel structure engineering; Intelligent building engineering; Electric power engineering; Environmental protection project; Others.

Project scale: building area/m2, total building height/m, building height/m, structural form/,and project cost RMB; Maximum single span/meter (steel structure engineering); Earthwork/cubic (earthwork); Installation capacity/KVA (power engineering);

Quality objective: the project is qualified for one-time acceptance; Do a good job in the certification and conformity of is0900 1 quality system. Establishing "Excellent Project in Changsha" (Changsha Area)

Create "Changsha City Construction Engineering Structure Quality Evaluation Project" (Changsha area) and "Hunan Province Quality Project"

Create a "Lotus Award"

Create "Luban Award"

Safety objective: the death accident at work is 0, and the major safety accident is 0; The serious injury rate should be controlled at 1.

Project Management Commitment Letter 15 1. Completed in 20xx.

In 20xx, under the correct leadership of the Municipal Party Committee and the Municipal Government, closely centering on the central work of the Municipal Party Committee and the Municipal Government, with scientific and innovative working ideas and proactive work enthusiasm, we overcame difficulties, paid close attention to implementation, and made every effort to promote the construction of key projects, with an investment of 54 1 10,000 yuan and an annual plan of 100.2%.

1. "Two Districts and Five Roads" Resettlement Housing Project for Old City Reconstruction. Completed an investment of 372 million yuan; The pile foundation of the first phase (g-a 13 plot) is completed, and the third floor of 17# building is completed. Piling started in the second phase (plot g-a 12).

2. The old city reconstruction and resettlement housing project of shanty towns in plot B .. completed an investment of 65,438+69 million yuan; Complete 25% of engineering piles and 85% of retaining piles.