House construction contract template

House construction contract template, everyone should pay attention to the standardization of the agreement when signing the agreement. After all, not all agreements are legally effective, only An agreement that meets legal requirements is legally binding. Many people suffer damage to their own interests because of irregularities in the contract. Let’s take a look at the sample building contract. Building Contract 1

Party A:

Party B:

Party A will contract the construction of its own house to Party B. After negotiation between the two parties, the following agreement was reached:

1. Construction method: Party B will contract the work but not the materials. Party B is responsible for starting the construction and providing all the equipment, formwork, and scaffolding required for the construction by itself, and taking care of the food, accommodation, and transportation of the construction personnel. The raw materials used in building the house shall be prepared by Party A, and Party A shall provide water and electricity for Party B's construction and bear the water and electricity costs.

2. Project content and quality requirements

1. Project content

(1) Adding a second floor: the main body is a brick-concrete structure bungalow with 24 walls , floor height meters. Add beams to the wall, add a beam to the middle panel of the outer room, and add a cap to the top of the front outer wall. The four sides of the roof are built with 90cm high parapet walls. The exterior wall is made of plastic powder on three sides and brick veneer along the front. The interior walls and ceiling are painted flat and imitation porcelain is hung. Reserve hidden pipes in walls and roofs, install lighting wires, and install and handle water pipes. Door and window installation.

(2) Exterior wall on the first floor: plastic powder on three sides, brick veneer along the front;

(3) Stairwell: plastic powder on the exterior wall, brick veneer along the front, interior The walls and ceiling are painted flat and imitation porcelain is hung.

2. Quality requirements

The roof must be flat without leakage or water seepage, and the internal and external walls must be flat without bursting. After the house is built, it meets the requirements for normal use.

During the construction process, Party A can conduct on-site inspection of details related to construction quality. However, construction shall not be hindered except due to project quality problems.

If there are construction quality problems in the house during the year, Party B shall renovate it until it meets the quality requirements agreed upon by both parties or is average, and shall compensate Party A for all losses caused by construction quality problems, including the cost of re-repairing ( Including the materials used for repairs) are all borne by Party B.

3. Pricing and payment methods

1. Price calculation: Calculate the project price based on the actual construction area of ??276 yuan per square meter. The time is calculated at 552 yuan per square meter, and the total price will be calculated by both parties after completion.

2. Price payment: Party A pays 5,000 yuan in advance on the day the construction starts, 10,000 yuan after the second-floor slab is poured, and the remaining price will be paid on the day all projects are completed.

IV. Construction Period

Unless natural conditions cause unequal construction or Party A’s insufficient supply of materials, Party B shall not stop construction without reason. The construction quality must be ensured and followed up according to the normal schedule, but the formwork should be lifted and removed before October.

5. Construction Safety

During the construction process, Party B should pay attention to construction safety and take full responsibility for construction safety throughout the process. All accidents that occur during construction will be borne by Party B.

6. For matters not covered in this contract, both parties may supplement the agreement, and the supplementary agreement shall be an integral part of this contract. If the content of the supplemental agreement is inconsistent with this contract, the content of the supplemental agreement shall prevail.

7. This contract is made in duplicate and will take effect after being signed and sealed by both parties.

Party A: Party B:

House Construction Contract Year, Month, Day 2

Party A: ______

Party B: ______

Party A builds a house in ___ Village, ___ Town, with a total construction area of ??approximately ____ square meters, and Party B will contract the construction. After negotiation and agreement between both parties, the following contract is signed:

1. Contracting method

The contract shall be contracted by contracting work but not materials.

Party A provides the materials needed for building the house, including: red bricks, river sand, gravel, lime, cement, steel, water pipes, sewer pipes, nails, wire, water and electricity, etc. Party B provides labor services, construction technology, formwork, support trees, scaffolding materials, yard nails, production and living utensils, etc.

2. Construction Project

Party B shall undertake the construction in accordance with the design drawings or the requirements put forward by Party A. The construction of the main project of Party A's house, including walls, beams, columns, stairs, floors, formwork installation, removal of formwork, steel bars, cast-in-place concrete and ground, concrete cushion for front steps; decorative interior rough painting, forward facing Install ceramic tiles on the exterior walls, cement mortar on the rear wall, ceramic tiles on the bathroom floor and walls, and install porcelain basins, toilets, sewer pipes, and downpipes; the top layer should be grouted and polished, and anti-seepage treatment should be done at the same time.

3. Contracting price

____ yuan per square meter, the building area is calculated based on the exterior wall of each floor. The parapet wall is priced at NT$10 per meter, including cement mortar plastering. A separate construction team will be hired to pound the concrete on the floor. Party A and Party B shall each bear the cost ____.

4. Payment method

Complete the first layer of bricks and pound the floor Pay ____ yuan, complete the second level payment of ____ yuan, and complete the third level payment of ____ yuan. The project will be completed and will be paid in full after acceptance.

5. Responsibilities of both parties

Party A is responsible for the supply of water and electricity and the timely arrival of raw materials. Party B must ensure the quality of the project, construct the project in accordance with the design drawings and Party A’s requirements, save materials, and keep the materials well and must not lose them.

6. Quality Requirements

Party B shall organize construction in accordance with the national house quality standards and requirements. If the house is not up to standard, Party B will be responsible for rework, and Party B will be responsible for the rework costs.

7. Pay attention to safety

During civilized construction, if Party B's construction workers are injured at work, or other accidents cause injuries to others due to construction, Party B will be responsible for everything, and Party A will not bear any responsibility or expense. Civilized construction, pay attention to professional ethics, and pay attention to cleanliness and hygiene.

8. Construction Period Requirements

The construction period of the main project is ____ months, calculated from the date of signing the contract. Party B must complete the project within ____ month ____ The main project should be completed by a few days ago, and the completion time cannot exceed ___ days. Party B cannot delay the completion of Party A's house construction for various reasons. The materials required by Party B should be submitted to Party A two days in advance for rapid preparation.

Party A (seal):

Party B (seal):

Party A’s representative (signature):

Party B’s representative (Signature):

Signing date: Year, month, day House Construction Contract 3

Party A:

Party B:

According to "China According to the relevant laws and regulations of the Contract Law of the People's Republic of China, Party A and Party B shall entrust Party B with the construction of housing. This agreement has been formulated through friendly negotiation for the compliance of both parties.

Article 1: The proposed housing construction area is about square meters of rough housing (subject to the final actual measured construction area). The project is located in the first floor of the unit in the first phase of the project. The price is per Square Yuan, room number is, *** calculated as a set. The total housing construction cost is RMB (lowercase) yuan, and the amount (uppercase).

Article 2: The proposed house payment will be paid in two batches. Within three days from the date of signing this contract, Party A shall pay 50 yuan of the total amount of the proposed house, with the amount in capital letters. When the construction of the proposed housing reaches plus or minus zero, the remaining housing construction payment is yuan, with the amount capitalized.

Article 3: The proposed housing completion time is: year, month, and days ago.

Article 4: During the period of this contract, Party A can freely change the name of the proposed house once (free of charge). Party A must provide Party B with the transferee information in writing and sign the corresponding contract.

Article 5: If Party A fails to pay the house construction payment in full and on time as stipulated in this agreement, Party B may terminate this agreement and refund the house construction payment collected.

If the house built by Party B fails to pass the quality inspection or is not completed before the agreed date, Party A can terminate this agreement, and Party B will refund all the construction money and pay interest based on bank deposit interest rates for the same period.

Article 6: Both parties agree to sign a "Subscription Letter" after obtaining the "Commercial Housing Pre-sale License". If Party A cannot go to the designated place to sign the "Subscription Letter" at the designated time, the house construction payment paid by Party A will be refunded without interest.

Article 7: If any dispute arises between the parties during the performance of this agreement, they can resolve it through negotiation. If the negotiation fails, they can apply to the Hainan Arbitration Commission for an arbitration award.

Article 8: Party B entrusts a law firm to provide full legal services for the implementation of this agreement and provide legal protection for the effective implementation of this agreement. The specific service lawyer is (practice license number: Tel: ).

Article 9: This agreement is made in triplicate, with Party A holding one copy and Party B holding two copies. This Agreement shall take effect from the date Party B receives the first installment of the house construction payment from Party A.

Party A (official seal): _________ Party B (official seal): _________

Legal representative (signature): _________ Legal representative (signature): _________

_________year____month____day_______year____month____day