1. The construction unit is responsible for organizing and recording the blue prints.the design. Procedures for joint review:
(1) General procedures for joint review of drawings: the owner or supervisor will speak → the designer will explain the drawings → the representatives of the construction party and the supervisor will ask questions → study them one by one → form a joint review record document → it will take effect after being signed and sealed.
(2) pre-examination must be organized before the blue prints.the design. The problems found in reading the drawings should be summarized, and one representative should give the main speech at the meeting, and others can explain and supplement appropriately according to the situation.
(3) The construction party and the designer shall assign special personnel to record the questions raised and answered for checking.
(4) Make it into a record of the blue prints.the design, which shall be signed and sealed by representatives of all parties for approval.
second, the blue prints.the design of construction drawings is an important activity that all contractors (the construction unit, the supervision unit and the construction unit) should be fully and meticulously familiar with the drawings after receiving the design documents of the design institute, and review the problems and unreasonable situations existing in the construction drawings and submit them to the design institute for processing.
the construction unit is responsible for organizing and recording the blue prints.the design. Through the joint review of drawings, all contractors, especially the construction units, can be familiar with the design drawings, understand the design intent, grasp the characteristics and difficulties of the project, find out the technical problems to be solved and draw up solutions, so as to eliminate the problems existing due to design defects before construction.
Extended data:
After the drawings are inspected, there should be inspection records of construction drawings. It shall be marked as follows:
(1) Project name: the name of the project, which shall be indicated in the drawings.
(2) project number: the name of the project, which should be indicated in the drawings.
(3) table number: the table number of the table to be checked by the drawing, which is used for registration.
(4) drawing volume name: the volume name of the drawing under review, which should be indicated in the drawing.
(5) drawing volume number: the volume number of the drawing under review, which should be indicated in the drawing.
(6)? Moderator: Here is the signature of the supervisor.
(7)? Time: the time of joint review of drawings, which should be marked as-year-month-day
(8) Location: joint review of drawings.
(9) participants: all participants, including participants from all contractors (construction unit, supervision unit, design unit and construction unit).
(1) comments include:
drawing number: number of the problematic drawing
submitting unit: submitting unit (generally fill in the construction unit)
making comments: submitting problems (generally submitted by the construction unit)
handling comments: responding to the raised problems (replied by the design unit)
(11)
Baidu encyclopedia-blue prints.the design