After the completion of the stamp size is generally 50mm*80mm, stamped with a red seal. The signature must be handwritten, not stamped. The basic contents of the completion stamp should include: the completion drawing is written by the construction unit, the auditor, the technical director, the writing date, and the on-site supervision director of the supervision unit. Engineering drawings with different formats should be folded into exposed A4 format (297mm 2 10mm) icon columns according to the Technical Drawing Folding Method (GB/ 10609.3 89).