3 copies of contract model for broken bridge aluminum doors and windows
Broken bridge aluminum doors and windows lead the way. After plastic steel doors and windows, broken bridge aluminum doors and windows are becoming synonymous with new doors and windows. So how much do you know about the broken bridge aluminum door and window contract? The following is a model contract for broken aluminum doors and windows, which I arranged for you. Thank you for reading.

Model contract for broken bridge aluminum doors and windows 1

Party A: (hereinafter referred to as Party A)

Party B: (hereinafter referred to as Party B)

According to the Contract Law of People's Republic of China (PRC), Party A and Party B have reached the following agreement on the principle of equality and voluntariness:

1. Project name: aluminum alloy doors and windows construction and installation project of Golf City Garden Phase III project.

2. Project content: Fabrication, installation and construction of 9#, 1 1# aluminum alloy windows in the third phase.

Third, the project price and payment method:

The project price includes labor costs, inspection fees, auxiliary frames, tempered glass, taxes and fees. Payment method: after the contract is signed, 50 yuan/㎡ shall be paid for the project after the installation of the auxiliary frame, 70% of the contract price after the completion and acceptance, and 85% before the Spring Festival in 20_. Pay 10% of the contract price on May 30th, 20_, and keep 5% of the quality deposit to be paid after the expiration of the warranty period (the warranty period is 2 years). 5% of the total price is reserved as quality deposit, and the reserved money will be settled after the expiration of the two-year warranty period.

Four. Duration: Within days after the contract is signed, Party B's window frame will enter the construction site of Party A for installation, and the window frame processing time will be days. The total construction period is days, and the specific construction progress shall be subject to the notice of construction time required by Party A to ensure the construction progress. If the installation is completed within the specified time, otherwise it will bear the responsibility for economic losses. Pay liquidated damages of 10% of the total project price for each day of delay.

5. Technical quality requirements: it conforms to the industrial standards for the production and installation of broken bridge aluminum windows, and conforms to the national and Tongliao Jian 'an project construction acceptance specifications. Party A and Party B agree that the quality standard for the manufacture and installation of the broken bridge aluminum window is: high quality. Engineering quality standards (must meet the design requirements, the sealing degree and the quality of spare parts and glass meet the requirements of national standards, and those who fail to meet the requirements shall be responsible for compensation and bear economic responsibilities). The quality of all doors and windows meets the requirements of Tongliao quality inspection station and national strong standard.

Technical parameters of intransitive verbs:

1. Broken bridge aluminum window, the frame material is colored (subject to the color of the color card), and the color and glass inside are glass. Hardware is Chunguang brand (including wind brace);

2. If the glass area is greater than 1.5 square meters or the height from the ground is less than 0.9 meters, safety glass (three-layer toughened) shall be adopted; Glass brand: brand 4mm+6A+4+6A+4 insulating glass; Molecular aluminum spacer;

3. Before the window is manufactured and installed; Party B shall calculate the strength of the window; And meet the requirements of relevant technical performance indicators. During the window manufacturing process, Party A will send special personnel to Party B's manufacturing site for quality sampling regularly or irregularly. If quality problems are found, Party B will be ordered to rectify or terminate the contract.

4. Materials used for broken bridge aluminum window: broken bridge aluminum brand; The window is made of D63 series profiles, and the thickness is1.4mm. Glass glue brand? Group angle glue brand.

5. The auxiliary frame with the specification of 20_40_ 1.5mm is used for the broken bridge aluminum, and the galvanized square tube is connected to the wall.

6. Sealing strip (domestic high-quality brand:)

7. The window size shall be subject to Party A's drawings. (The specific dimensions shall be determined by field measurement and review. )

8. All incoming materials shall be protected by Party B. If the finished products are not protected, the responsibilities shall be borne by Party B. ..

9. The quality of all doors and windows meets the requirements of Tongliao Quality Inspection Station and local strong regulations. (All technical parameters are subject to local mandatory standards).

Seven. Party B shall strengthen the safety management of construction personnel and improve the safety awareness of on-site personnel. In the installation project, the construction should be carried out in strict accordance with the safety operation specifications. In case of any safety accident, all responsibilities shall be borne by Party B, not Party A. ..

Eight. Liability for breach of contract: if Party B fails to comply with the notice of construction period required by Party A, it shall calculate and pay the liquidated damages to Party A at the rate of 65,438+00% of the total settlement amount every day (directly deducted from the project payment). If Party A fails to make payment as agreed in this contract, Party A shall pay Party B at the bank loan interest rate for the same period from the date of default.

Nine. Others: The final settlement shall be subject to the actual measurement. Before processing all materials and accessories of the agreed brand, samples shall be made and delivered to Party A according to the contract requirements, and the samples shall be sealed at the site as the basis for acceptance by Party A. ..

X annexes and supplementary agreements to this contract have the same legal effect as the original contract.

Eleven, the creditor's rights shall not be transferred.

12. This contract is made in duplicate, with each party holding one copy. In case of dispute, if negotiation fails, both parties may apply to the court or arbitration commission where the contract is signed for arbitration.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Model essay on broken bridge aluminum doors and windows contract II

Party A:

Party B:

This contract is signed on the principle of equality, mutual benefit and consensus in accordance with the relevant provisions of People's Republic of China (PRC) Contract Law and Construction and Installation Engineering Contract Law.

I. Project name:

Project location:

Second, the way of contracting: contracting for labor and materials.

1. Party B shall transport, manufacture and install brand materials according to the agreement. If it is necessary to change, it must be approved by Party A in writing, otherwise it will be reworked unconditionally and the construction period will not be postponed.

2. Party B shall be fully responsible for the inspection of finished products and raw materials within the scope of the contract and the timely inspection of construction materials to ensure the acceptance, which shall be kept by Party A. ..

Three. Contract price:

1, total area of broken bridge aluminum doors and windows project; ______㎡

2, broken aluminum doors and windows per square meter _ _ _ _ _ yuan.

3. Total cost of broken aluminum doors and windows in words: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Four, the determination of the main materials and auxiliary materials:

1, the broken bridge aluminum profile is 63 series, the wall thickness is not less than 1.4 mm, the color inside and outside the window is white, and the paint surface is fluorocarbon spraying. The glass is 6mm+ 12A+6 shading single-side coating (the color depends on the color of the on-site glass), the opening window is tempered glass, and other fixed glasses are ordinary glass. Opening mode: external casement window.

Five, quality requirements:

1, which meets the national acceptance standard and conforms to GBT30 1 Evaluation Standard for Quality Acceptance of Building Engineering.

2. In the process of construction, Party B shall make technical disclosure to employees, strictly follow the construction specifications of design drawings and atlas, aim at high quality, put an end to common quality defects of the project, and ensure the completion acceptance.

3. The raw materials can be processed and produced only after being accepted and confirmed by Party A. ..

4. Party B shall strengthen self-inspection and be responsible for the protection of finished products. The surface of the window should be smooth and free from scratches.

5, sash should cooperate closely. The gap should be opened evenly and flexibly, and the lap width should be consistent with the surrounding area. The maximum deviation of the installation position of the broken bridge aluminum window shall not exceed 2.00 mm.

6, the window and its materials piled up clean, smooth, avoid the rain.

7. Before installation, check the number, specifications and opening direction of doors and windows according to the requirements of design drawings, and check whether the five sealing strips are complete. If it is unqualified, please replace it.

8. Doors and windows can only be installed after passing the tests of wind pressure resistance, air tightness, water tightness, opening and closing force, sound insulation, heat insulation, nylon guide rail durability and opening and closing durability.

9. Draw the center line at the mouth of the cave, horizontally check the position of the upper and lower borders and the internal and external orientation, and then fix them after confirmation.

10. When installed in the hole, the center lines of the upper and lower frames should be aligned with the center lines of the hole. The symmetrical positions of the upper and lower angles and horizontal frames should be plugged with wooden wedges, and the thickness and direction of doors and windows should be determined as required, and the verticality level and right angle should be adjusted. The space between the window mounting frame and the wall hole is filled with foaming agent, and the foaming agent shall not overflow the frame edge, and the outer wall frame is filled with silica gel.

1 1. After the window is installed, carry out water spraying test, and check the water seepage after the rain.

12. If Party B delays the construction period or fines due to quality problems, Party B shall bear direct and indirect losses. Pay attention to the protection of finished products.

Six, safety management:

1. When entering the site, Party B must abide by the safety operation rules and Party A's various safety systems, and rectify the potential safety hazards in time. Party A has the right to impose a fine on violators or take full responsibility for work stoppage until this Agreement is terminated.

2. When installing windows, Party B shall do a good job in safety disclosure, safety education, safety inspection and acceptance. In case of an accident, all economic losses shall be borne by Party B, and Party A has the obligation to assist Party B to do a good job.

Seven, time limit for a project

The time limit for a project is * * * days from year, month and year.

Eight. Others:

1. Party A is responsible for coordinating the cooperation between civil engineering and installation.

2. Party A shall provide the site and water and electricity facilities free of charge.

3. When Party B's personnel enter the site, they shall abide by all rules and regulations of Party A, abide by the law and conduct civilized construction.

Nine. Payment terms:

Party A shall pay Party B RMB as security deposit. After the installation is completed and accepted, the total contract price shall be paid in RMB.

X. project warranty:

The warranty period of this project is 2 years, counting from the date of acceptance of the project.

XI。 Supplementary terms:

1. Matters not covered in this contract shall be settled by both parties through consultation.

2. This contract is made in duplicate, each party holds one copy, and it will be terminated after all the terms are executed.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Model essay on broken bridge aluminum doors and windows contract 3

Employer (Party A):

Contractor (Party B):

In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and relevant regulations, both parties have entered into this contract through consultation on the principles of voluntariness, equality, good faith and mutual benefit, for mutual compliance.

I. Overview of the Project

1, project name:

2. Project location:

3, project content and cost:

4. The cost per square meter of the round window part is increased by RMB.

Second, the preparatory work

1. After the contract is signed, Party A shall provide Party B with a complete list of doors and windows (building window size) and relevant drawings in time.

2. Party A shall provide temporary power supply (vertical transportation) to the construction site free of charge before installation.

3. Party B shall design the window according to the requirements of the drawings and documents provided by Party A, and draw a complete window diagram for Party A's review, and then make and install it after being approved and signed by Party A..

4. Party A shall provide Party B with installation benchmarks as required, including position benchmarks such as primer, horizontal line, vertical line and window mullion.

Third, the construction cooperation

1. Party A and Party B shall cooperate closely to ensure the smooth progress of Party B's site construction. Party A shall deliver the on-site construction progress to Party B in time, so that Party B can know the construction progress of the civil construction site as soon as possible, do a good job in the construction progress of this project, and cooperate with the civil construction to complete the corresponding work in time. The construction arrangement of civil engineering should leave construction time and technical gap for this project;

2. Party B's request for cooperation with Party A at the construction site is put forward by Party B and coordinated by Party A;

3. Party A shall notify Party B of the change of the project schedule one week in advance;

4. After the materials and window sashes (with hardware) of this project enter the site, Party B shall properly keep them, and Party A shall coordinate the protection of finished products to prevent the finished products from being damaged and the hardware from being lost. After the window sash is installed on the wall, all units are not allowed to go in and out of the window, tie or stool scaffolding, and are not allowed to step on, press, touch or row to avoid damage. If the contract is damaged or lost, the responsible party shall be responsible;

5, glass installation must be carried out after the civil work, in order to reduce the finished product damage and pollution;

6. Party B shall strengthen the management of finished product protection and civilized construction, and the materials or finished products entering the site shall be fully covered with protective film. Construction personnel should take good care of the finished products, otherwise Party A has the right to punish them as appropriate.

7. After entering the site, Party B shall obey the unified management and safety management of the site and carry out construction in accordance with relevant safety construction specifications. In the event of a safety accident, the responsible party shall be responsible;

8. Both Party A and Party B shall send on-site representatives for communication and coordination. On-site representative of Party A, contact information, on-site representative of Party B, contact information:

Fourth, the project cycle

1. Construction and installation time limit for Party B: Party B shall arrange the construction and installation progress according to Party A's requirements and civil construction progress.

2, in case of the following circumstances, the time limit for a project shall be postponed:

(1) Party A fails to provide drawings, materials and commencement conditions as agreed;

(2) Party A failed to pay the project advance payment and progress payment as promised, which made the construction unable to proceed normally;

(3) Design change and increase of engineering quantity;

④ Force majeure;

⑤ Other circumstances that are postponed with the consent of Party A's representative.

Verb (abbreviation for verb) engineering change

1, the engineering quantity is based on the actual processing quantity and settled according to the size of the hole;

2. Party A shall notify Party B in writing of the change of the original project design schedule 15 days in advance, and provide corresponding drawings and explanations;

3. If Party A changes the original project without causing losses to Party B, Party B will change it as required after receiving the notice, and the expenses will increase or decrease accordingly;

4. If Party A changes the original project and causes losses to Party B, Party A shall bear the losses;

5. Add items not included in the original contract. If Party A and Party B reach a written agreement on the construction requirements and costs, Party B will carry out the construction as required, and Party A will increase the contract price.

Six, quality acceptance

1, project acceptance shall be carried out according to national or industrial quality acceptance standards and specifications;

2. The acceptance is divided into three steps: (1) acceptance of materials and accessories (2) acceptance of upper frame (3) acceptance after sealing;

3. After the project is completed, Party B shall provide Party A with a notice of completion acceptance, and Party A shall organize relevant units to conduct acceptance, and the acceptance unit shall issue a certificate of acceptance. If the acceptance is unqualified, Party B will unconditionally rectify it to be qualified, and the expenses arising therefrom shall be borne by Party B;

4. Party A will not organize the acceptance within 7 days after receiving Party B's notice of completion acceptance, and will assume the custody of the engineering products and related responsibilities from the eighth day;

5. The shelf life of the product is years, counting from the date of acceptance of the project;

6. During the quality guarantee period, Party B shall be responsible for the warranty of any quality defects caused by product manufacturing or installation. If the defects are caused by human or other external forces, Party B shall cooperate with the maintenance, and the reasonable expenses shall be borne by Party A..

Seven, the project price payment

1. After the contract is signed, Party A shall pay Party B% of the total project price.

2. For the production and installation of products, Party B shall pay% of the total project price every time, and for the second batch, Party A shall pay% of the total project price to Party B after the glass installation is completed.

3. The project quality deposit is% of the project price.

4. Within 10 days after the expiration of the project warranty period, Party A shall pay Party B the amount of quality deposit without quality problems.

5. When Party A fails to fulfill its obligation to pay the project price, the ownership of the marked goods belongs to Party B. ..

6. The project price shall be calculated and settled according to the actual quantities stipulated by the state.

7. If Party A needs Party B to pay part of the advance payment due to insufficient project funds, Party A and Party B shall sign a supplementary agreement through consultation.

Eight. responsibility for breach of contract

1. In case of breach of contract caused by the contractor's own responsibility, the losses of the employer and the construction unit shall be borne by the contractor;

2, due to the employer's own responsibility for breach of contract, causing losses to the contractor, shall be borne by the employer;

3. Disputes can be settled in the following ways in turn:

(1) After negotiation by both parties.

(two) to apply for mediation to the local industry authorities or other organs.

(3) through arbitration.

4 through litigation.

Nine. Engineering settlement

After the doors and windows project is completed, the contractor shall be responsible for compiling the engineering settlement book, which shall be confirmed within 15 working days after Party A's review. Within 7 days after the project payment is settled, Party B shall collect and sort out all engineering data and relevant documents and submit them to Party A. ..

X. supplementary provisions

XI。 others

1, this contract * * *

2. This contract shall come into effect as of the date of signature and seal;

3. For matters not covered in this contract, both parties may settle them through on-site negotiation or sign a supplementary agreement.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Three related articles on the contract model of broken bridge aluminum doors and windows;

★ 3 simple demonstration contracts for door and window engineering.

★ 3 aluminum alloy door and window template contract

★ Three contracts for aluminum alloy doors and windows engineering.

★ 202 1 year model contract for doors and windows

★ Model contract for broken bridge aluminum doors and windows

★ Windows and doors engineering contract template (2)

★ Model contract for aluminum alloy doors and windows engineering

★ Model contract for production and installation of aluminum alloy doors and windows

★ Contract sample of aluminum alloy doors and windows engineering

★ Aluminum alloy doors and windows contract