is not entirely a problem of workers' sense of responsibility, and sometimes foolproof methods are needed.
If
new product drawings are drawn, the welding sequence and welding procedure regulations must be formulated by the welding engineer or welding supervisor.
after distribution to the workshop, the monitor shall organize the workers to be familiar with the process and solder joints, and mark and number each weld, including various pre-welding preparations (such as preheating, etc.). It is best to mark it in a conspicuous way on drawings or objects.
the welder should record every weld he has completed.
after welding is completed, the monitor or foreman will check the work of the team again to prevent quality problems and missing welding.
finally, you must also sign the record.