Current location - Quotes Website - Signature design - Responsibility of architectural engineering design
Responsibility of architectural engineering design
Architectural design drawings are divided into architecture, structure, water supply and drainage, heating, ventilation and air conditioning, electricity, general layout and other majors. The chief design officer (referred to as "chief designer" or "project director") is responsible for the overall design, and the coordination among disciplines is controlled by the "chief designer". In the past, "chief architect" should have senior titles (senior architect, senior engineer). After the implementation of the registration system, the first-class registered architect is responsible for the design of civil buildings with a scale of 1 10,000 square meters, so the first-class registered architect usually acts as the "chief architect" and takes full responsibility for the design. If there are any problems in the design, the design unit * * will bear legal responsibility.

Professional leaders usually require intermediate titles. Responsible person, designer, draftsman, etc. All majors are managed and controlled by the chief designer, and all modifications must be made through the chief designer. It can be understood that the technicians involved in engineering design listen to and are responsible for the chief designer, who is responsible for his design unit, and the legal representative and chief designer of the design unit are responsible for the owner.

The special article on fire protection is completed by the cooperation of architecture, water supply and drainage, heating, ventilation and air conditioning, and electricity, and the "chief designer" is responsible for it. If the problem is reported for approval first, all professional designers will modify their own drawings under the unified control of the chief designer until it is approved.

Fire protection, civil air defense, transportation, greening, etc. It belongs to the functional departments of the government, and carries out special management and supervision on whether the architectural design conforms to the relevant norms and urban planning. Construction drawing review is responsible for reviewing whether the design drawings meet the requirements of architectural design specifications.

If there are serious problems in the use and operation of the building, first check whether there are any problems in the design drawings. If there is no problem with the drawings, check whether the construction unit is working according to the drawings. If there is no problem in the construction, check the management problems of the user. If there is a problem with the drawings, the design unit and the chief designer shall bear the main responsibility.

Design is no small matter. As a member of the design unit, just pay attention to your responsibilities.