Who wrote the signature of the person in charge of the inspection and testing of the concealed engineering acceptance record of the fire control inside page information?
The person in charge of the inspection and test of the concealed works acceptance records in the inside information of fire protection shall be signed by the engineer. If the project has concealed conditions or reaches the intermediate acceptance position agreed in the special terms and conditions, the contractor shall conduct self-inspection 48 hours before the concealed or intermediate acceptance and notify the engineer in writing. The contractor shall make a good record of acceptance. After the acceptance is qualified, the contractor can hide and continue the construction only after the engineer signs the acceptance record.