The first section substation and line working ticket general part

One: When carrying out normal maintenance of power supply equipment, safety measures should be taken when necessary.

, a working ticket should be used.

Article 2 Ordinary working tickets are divided into one or two working tickets for substations and power lines.

First, a work ticket. According to the safety regulations, the use format is as follows:

Fill in the working ticket:

The work of the working ticket is:

() Working on high-voltage equipment requires total or partial power failure;

() The secondary wiring and lighting in the high-voltage room need to cut off the power supply of high-voltage equipment or take safety measures.

The work of filling out two working tickets is as follows:

() Live working and working on the shell of live equipment;

() Work on the control panel, low-voltage switchboard, distribution box and power supply trunk line;

() It is not necessary to cut off the high-voltage equipment when working on the secondary wiring circuit;

() Working on the excitation circuit of rotating generator, synchronous camera or rotor circuit of high-voltage motor.

() Non-on-duty personnel are on duty to phase with insulating rods and voltage transformers or to measure high-voltage circuit current with clamp ammeter.

A, the use of power line working ticket:

The job of filling in the working ticket is:

() working on power outage lines (or primary power outage lines in double-circuit lines);

() Work on the distribution transformer platform or in the distribution transformer room with total or partial power failure.

The so-called total power failure means that all power supply lines to the transformer station or distribution transformer room have been completely disconnected.

The work of filling out two working tickets is as follows:

() Live working;

() working on the electric wire tower;

Work on the distribution transformer workbench or in the distribution transformer room.

Article 3: The working ticket shall be filled out by the issuer. Sometimes, in order to reduce the workload of the work ticket issuer, the person in charge of the work can also fill in the work ticket of the class (group).

Article 4: The working ticket shall be filled in with pen or ballpoint pen in duplicate. It should be filled in correctly and cannot be modified at will. If individual words need to be revised, they should be written clearly. The working ticket can only be modified up to 20 words.

Article 5 The working ticket shall be filled in a language that can accurately express the meaning and meet the standard of Putonghua.

Article 6: The personnel listed on the working ticket shall check the working ticket according to their duties, with complete signatures and neat handwriting.

Article 7: The issuer of the working ticket shall be the person approved and announced by our company. The working ticket issuer shall not concurrently be the person in charge of the work.

Article 8: Issuance of working tickets.

The working ticket shall be issued by the issuer, and the working ticket filled out by the person in charge of the work must also be issued by the issuer.

In general, the working place on the working ticket is limited to an electrical connection part (bounded by the fracture of the circuit breaker). If the construction equipment belongs to the same voltage and is located on the same floor, and the power supply is stopped at the same time, and the live conductor will not be touched, a working ticket is allowed for several electrical connection parts.

Under the following circumstances, the person designated by the company who has the right to issue working tickets and the personnel on duty shall perform the work permit procedures. The working ticket issuer is only responsible for the necessity of the work, whether the work is safe and whether the safety measures listed on the working ticket are correct and complete. Before starting work, the guardian (the person in charge of the construction unit) shall conduct safety education for the staff and explain the matters needing attention.

() Foreign units with legal personality come to the substation to contract equipment maintenance, anticorrosion or installation.

() Infrastructure construction needs the running equipment to stop running.

() The installation unit will deal with the defects of the newly invested equipment.

One, a substation or a line all power outage maintenance, can issue a working ticket, but to specify the work content. When several teams are working at the same time, the working ticket can be sent to a general manager, and only the person in charge of each class can be filled in the column of working class members. ,

Measures for the administration of power supply safety working tickets and operation tickets

Article 9: One of the two working tickets must always be kept in the workplace, and the person in charge of the work shall be responsible for it, and the other one shall be handed over according to the value. The personnel on duty shall record the work ticket number, work task, allowable start time and completion time in the operation record book.

Article 10: person in charge of work (guardian)

, approved by the bureau leadership announcement personnel.

When an external unit with legal person qualification contracts civil construction, equipment maintenance, installation, anti-corrosion or debugging in a substation, the external unit shall designate a person in charge (guardian) and submit the list to the company's safety supervisor for safety qualification examination in advance, and the safety supervisor will forward it to the substation after passing the examination.

Change of the person in charge of the work:

During the work, the person in charge of the work temporarily leaves the site for several hours, the working ticket issuer should be replaced by a new person in charge of the work, and the two working heads should make necessary handover. The person in charge of the work can only be changed once. The change of the person in charge of the two working tickets is recorded in the "Remarks" column.

Article 11:

When a team works, fill in the names of all the people involved in the work. When working in multiple teams, only the name of the team leader can be filled in.

Personnel: fill in the total number of people who have participated in the work, including the work supervisor and team leader.

Article 12: Extension of working ticket:

During the work, it is expected that the maintenance will be difficult to complete within the planned time. Before the scheduled time expires, the person in charge of the work shall apply to the person in charge on duty (line: to the work ticket issuer or work permit) for extension.

The extension of two kinds of working tickets is recorded in the "Remarks" column.

Extension procedures can only be handled once.

Article 13: End of work:

After all the work is finished, the person in charge of the work and the person in charge on duty (the holder of the work permit) check the equipment condition and the site hygiene, and then both parties sign the work ticket, and the work is finished. And stamp the "closed" seal in the "Remarks" column.

Article 14: Before the maintenance work is completed, in any of the following circumstances, a work permit shall be re-issued and the work permit formalities shall be re-handled. The original working ticket is stamped with the "invalid" seal.

Some maintenance equipment will be put into operation and safety measures need to be changed.

The personnel on duty found that the maintenance personnel had seriously violated the safety regulations and were persuaded to take back their work.

If the maintenance period is extended once, it still cannot be completed, and the work needs to be continued (indicate that the extension is invalid).

The working ticket is damaged, incomplete or illegible.

Article 15: If the holder of a work permit finds any of the following circumstances when checking the work permit, he may return the work permit and ask for a new one.

, the scheduled working hours have expired.

Insufficient safety measures or incorrect filling.

, the working ticket issuer or person in charge of the work does not meet the requirements.

The work content and work place are not clear.

Article 16: Inspection of Work Tickets

The operation and maintenance department shall, before each month, review the collection of working tickets that ended last month, and make statistics on the qualified rate, and report it to the Safety Supervision Department.

One, one of the following circumstances, for the unqualified working ticket:

() The working ticket has no number.

() Missing items in the working ticket.

() Not signed as required.

() Work

The content (task) is not specific, or the work place is not clear.

() The equipment in the work content (task) column does not use double numbers.

() No safety measures are specified.

() The grounding wire has no serial number, and the installation position is not clear.

() The work ticket issuer, the person in charge of the work and the work permit holder hold concurrent positions with each other.

(a) failing to go through the formalities for changing the person in charge of the work according to the regulations.

() Failing to go through the extension formalities as required.

() Work with one working ticket should use two working tickets.

() The obstacles and signs that have been set do not indicate the exact position or orientation.

() The working ticket is damaged, incomplete and dirty.

() Not stamped with "Closed" or "Invalid" seal.

, the working ticket qualification rate (%) is calculated on a monthly basis, and the calculation formula is as follows:

Qualified ticket

Qualified rate = ———————————×%

Unqualified tickets+qualified tickets+other tickets,

Measures for the administration of power supply safety working tickets and operation tickets

Note: Other tickets refer to the work that should be issued according to regulations but not actually invoiced.

Article 17 Preservation of working tickets: The terminated working tickets shall be kept by each unit for more than three months.

Article 18: emergency maintenance does not require a working ticket, but it should be recorded in the operation record book. Before construction, safety measures should be taken, such as power failure, electricity inspection, grounding wire installation, hanging signs, fencing, etc., and designated persons should be supervised.

The following tasks can be classified as emergency maintenance:

Accidents in power supply equipment may endanger personal safety, cause fire or serious damage to equipment, and need to be dealt with immediately.

Save lives and put out fires.

The emergency repair time of substation accident is not expected to exceed hours, and if it cannot be repaired within hours, the working ticket formalities shall be handled according to normal maintenance. Emergency repair of line accidents is not limited.

Substation working ticket in the second quarter

Article 19: The work of filling in the working ticket is:

Working on high-voltage equipment requires total or partial power failure;

Secondary wiring and lighting in high-voltage room. , high-voltage equipment must be turned off or safety measures must be taken. The work of filling out two working tickets is as follows:

() Live working and working on the shell of live equipment;

() Work on the control panel, low-voltage switchboard, distribution box and power supply line;

() It is not necessary to cut off the high-voltage equipment when working on the secondary wiring circuit;

() Working on the excitation circuit of rotating generator, synchronous phase regulator or rotor circuit of high voltage motor;

() Off-duty personnel on duty use insulating rods and voltage transformers to phase or use clamp ammeter to measure the power supply of high-voltage circuit.

Article 20 the working ticket to fill in the details:

No.: Each unit is numbered separately, and there shall be no duplicate numbers in the first phase.

Person in charge of work:

() It is composed of personnel approved and announced by the company.

() When an external unit with legal personality contracts for civil construction, equipment maintenance, installation, anti-corrosion or debugging of a substation, the external unit shall designate a person in charge (guardian) and submit the list to the company's safety supervisor for safety qualification examination in advance. After the list is approved, the safety supervisor will forward it to the substation.

() Change of the person in charge of the work:

During the working period, the person in charge of the work temporarily leaves the site for more than one hour, and the working ticket issuer shall be replaced by a new person in charge of the work, and the two persons in charge of the work shall make necessary handover.

The person in charge of the work can only be changed once.

The change of the person in charge of the two working tickets is recorded in the "Remarks" column.

Team: If working in a team, the name of the competent unit shall be added in front. If several teams work, write the team where the chief working officer is located.

Working class staff:

() When a team works, fill in the names of all the staff members. If there are multiple teams working, you can only fill in the name of the team leader.

() Personnel: fill in the total number of people who take part in the work, including the general person in charge of the work and the person in charge of the team work.

, work content and work place:

Fill in the substation name, voltage grade, equipment name and quantity, work tasks, workplace or interval.

Planned working time: the outage maintenance time approved by the dispatching, excluding the outage operation time.

Safety measures: to be filled in by the work ticket issuer (or person in charge of work) and the work permit holder respectively;

() Open the circuit breaker and disconnector (including the circuit breaker and disconnector opened before filling in): fill in the equipment name and number.

() Grounding wire should be installed: indicate the exact location of grounding wire or the grounding knife switch should be closed, and the licensor should add a number.

() Set up fences and hang signs: the exact position of fences and signs shall be stated. Please fill in this column if the kv disconnector needs insulation shielding.

() Supplementary safety measures: other safety measures or safety precautions except (), () and ().

() The work permit shall completely fill in the safety measures taken in the corresponding column, and shall not be simplified or written as "same as left" or "completed".

Time of receiving the working ticket: the time when the working ticket is handed over to the substation attendant before the planned working time. ,

Measures for the administration of power supply safety working tickets and operation tickets

Permitted commencement time: the time when the work permit issuer signs and agrees to commence work after completing safety measures and licensing procedures at the construction site.

Change the person in charge of the work: if the person in charge of the work temporarily leaves the site for more than one hour during the work, the working ticket issuer shall be replaced by a new person in charge of the work, and the two persons in charge of the work shall make necessary handover.

The person in charge of the work can only be changed once.

The change of the person in charge of the two working tickets is recorded in the "Remarks" column.

, working ticket extension:

During the work, it is difficult to complete the maintenance work within the expected planned work, and the person in charge of the work should apply to the person in charge on duty for an extension before the scheduled time expires.

The extension procedures of two kinds of working tickets are recorded in the "Remarks" column.

Extension procedures can only be handled once.

End of working ticket:

After all the work is finished, the person in charge of the work and the person in charge on duty (the holder of the work permit) check the equipment condition and the site hygiene, and then both parties sign the work ticket, and the work is finished. And stamp the "closed" seal in the "Remarks" column.

Remarks column: fill in notes or other matters.

Three-section power line working ticket

Twenty-first fill in the working ticket work content:

() working on power outage lines (or primary power outage lines in double-circuit lines);

() Work on the distribution transformer platform or in the distribution transformer room with total or partial power failure. The so-called total power failure means that all power lines supplied to the transformer station or transformer room have been completely disconnected.

The work of filling out two working tickets is as follows:

() Live working

() working on the live line tower;

() Work on the running distribution transformer platform or in the distribution transformer room.

Twenty-second working ticket to fill in the details:

Number: each unit is numbered separately, and the number cannot be repeated within one year.

Name of department and research institute (engineering team): fill in the name of power supply station and work team. If multiple teams use a working ticket, fill in the name of the team where the Chief Working Officer belongs.

Person in charge of work:

() It is composed of personnel approved and announced by the company.

() Negative work

Change of person in charge:

During the working period, the person in charge of the work temporarily leaves the site for more than one hour, and the working ticket issuer shall be replaced by a new person in charge of the work, and the two persons in charge of the work shall make necessary handover.

The person in charge of the work can only be changed once.

The change of the person in charge of the two working tickets is recorded in the "Remarks" column.

Working class staff:

() When a team works, fill in the names of all the staff members. When working in multiple teams, only the name of the team leader can be filled in.

() Personnel: fill in the total number of people who take part in the work, including the general person in charge of the work and the person in charge of the team work.

Name of power line (double circuit should be marked with double title):

Fill in the line voltage level, line name and number.

Work place: fill in the line name, branch line name and start-stop pole number.

Work tasks: fill in specific work tasks within a certain range.

Safety measures to be taken (including circuit breakers to be opened, disconnectors and power outage range):

() Open the circuit breakers and disconnectors of power stations and substations.

() Open the circuit breakers, disconnectors and fusible fuses at both ends of the lines that need to be operated by the working group.

() Open the circuit breakers and disconnectors that endanger the power outage operation of the line, and erect lines across, parallel to and on the same pole where safety measures cannot be taken.

() Open the circuit breaker and isolating switch that may return to the low-voltage power supply.

If it is necessary to open the circuit breakers and disconnectors of power stations or substations, just fill in the names and numbers of the circuit breakers and disconnectors. If the circuit breaker and disconnector are opened by the line staff themselves, it is necessary to add "hanging nameplate or locking the operating handle of the opened circuit breaker and disconnector". Please also fill in this column if you need to close the line grounding breaker of power station and substation or hang the grounding wire on the line.

, reserved live line or live equipment:

Measures for the administration of power supply safety working tickets and operation tickets

Fill in the names and pole numbers of live lines or adjacent live lines erected on the same pole, the names of live lines intersecting with live lines, the starting and ending pole numbers and the names of live lines with parallel sections.

() should hang ground wire:

Refers to the grounding wire that the team should hang by itself, excluding the grounding wire hung by the substation or grounding breaker. The position of grounding wire hanging on the line should be clear. For lines erected on the same pole, if the grounding wire is required to be hung on different lines of the same tower, the line name and tower number should be indicated respectively.

() Planned working time: fill in the power outage time approved by the dispatching.

() Allow to start work instruction:

Line is a command mode of work permit initiation, which is divided into face-to-face notification, telephone communication and personal communication.

() Report after work: There are two ways to report after work: face-to-face and telephone.

() Remarks column: Fill in supplementary safety measures, etc.

Chapter II Operation Ticket

Substation and line operation ticket

Article 23 According to the order of the dispatcher or the person in charge on duty, if it is necessary to change the running state of the equipment for many times, the operation ticket should be used.

Equipment operation status is divided into the following categories:

, means of transportation.

Hot standby: Only the switch is in the off position.

Cold standby: circuit breaker, disconnector and secondary circuit are in the off position.

Maintenance: On the basis of cold standby, the equipment has been grounded and other safety measures have been arranged.

Twenty-fourth operation ticket must fill in the main contents:

, operation task, start and end time.

Check the power, current and voltage of relevant circuits.

Open and close circuit breakers and disconnectors.

Check the actual positions of circuit breakers and disconnectors.

, secondary circuit switching, protection circuit linking piece back or change the fixed value.

, control circuit, relay protection, automatic device and measuring instrument input or exit.

, the specific location of power outage equipment.

Location and quantity of installation and removal of grounding wires.

Open and close at the same time.

, hanging signs, installation fence and its location.

Install the insulating cover.

Twenty-fifth operation ticket to fill in.

, filled in by the operator, and signed by the guardian of the first instance, the person in charge on duty or the operator.

The operation ticket shall be clearly filled in with pen or ballpoint pen, and shall not be altered at will. Non-keyword modification shall not exceed words each, and keywords (such as pull, close, stop, send, return, switch, equipment name, quantity, etc.) shall not be modified.

, fill in the operation ticket should use standard operating terms, should not use dialect.

The number of the operation ticket cannot be duplicate.

A serial number in the operation ticket corresponds to an equipment operation content and cannot be merged. Check the position and status of the equipment as a project. Split-phase operation of equipment, one for each phase.

, each operation ticket can only fill in one operation task. The equipment name and number should be filled in the operation task bar and operation item bar.

The signatures of the personnel listed on the operation ticket are complete and the handwriting is neat.

Fill in the correct operation sequence:

() Operation sequence of line power failure: open the circuit breaker-open the line side isolating switch-open the bus side isolating switch. The power transmission sequence is reversed.

() Operation sequence of double-winding transformer power failure: open the load side circuit breaker-open the power side circuit breaker-open the load side isolating switch-open the power side isolating switch. The power transmission sequence is reversed.

() Operation sequence of three-coil transformer power failure: open low swallow circuit breaker-open Zhongyan circuit breaker-open Gao Yan circuit breaker-open low swallow disconnector-open Zhongyan disconnector-open Gao Yan disconnector. The power transmission sequence is reversed.

For blank lines that do not use operation tickets, the "following blank" stamp should be affixed from one line.

Twenty-sixth executive operation ticket

Switching operation ticket must be performed by two people, one is familiar with the equipment and the other is operating.

An operator can only hold one operation ticket at a time, and cannot hold multiple operation tickets for cross operation at the same time.

Before operation, check the simulation exercise against the operation ticket on the simulation board. When officially operating at the site, check the name, number and location of the equipment, the guardian holds the ticket and the key of the error-proof device, and sing the ticket loudly. The operator can operate each part with his fingers and repeat it loudly until it is correct. ,

Measures for the administration of power supply safety working tickets and operation tickets

, must be carried out in accordance with the order of the items listed in the operation ticket, it is strictly prohibited to pour items, add items, omit items and do work unrelated to the operation. Mark "√" after each operation, and do not mark "√" after all operations.

The operation time of important projects (grid connection, column disconnection, relay protection switching, grounding wire closing and grounding breaker closing) shall be recorded on the operation ticket.

then

,