Key points of construction:
The installation, disassembly and addition of sections shall be approved by the chief engineer and reported to the local safety supervision station for the record.
Before installation or disassembly, the production manager must organize the professional operators to carry out operation instruction education and disassembly safety technical disclosure.
In the process of installation and disassembly, the security department will arrange to set up a warning zone, set up warning signs, and have a special person to monitor it.
After the installation is completed, it can only be used after it is tested by the competent department of the company, the Municipal Construction Committee, the Municipal Labor Bureau and the testing center.
Regular inspection, maintenance, repair, and make records of operation and succession, which shall be the responsibility of the material design department.
Tower crane construction elevator must apply for an additional section every time. After approval, it can only be used after passing the acceptance.
Control point:
This scheme can only be implemented after the approval of the chief engineer.
Drivers, commanders and loading and unloading personnel must hold valid certificates, strictly abide by the safety operation rules, and it is strictly forbidden to operate illegally.
The safety device is complete, sensitive and reliable, and is responsible for regular inspection, maintenance, repair and adjustment.