(1) Accompany the crew for the New Year.

February 18, New Year's Eve, Unit 5 needs mediation. Here, there is no family reunion, no lively Spring Festival Gala, no colorful fireworks. Only the operation and maintenance personnel are full and busy, which is in sharp contrast with the quiet and noisy night sky. Driving on the familiar road leading to the company, the clock of the Spring Festival has just passed zero, and the city is still brightly lit. I have a different sense of accomplishment and pride when I think of myself and my brothers and comrades watching the lights every day.

On February 19, on the first day of New Year's Day, the unit mediation and maintenance plan was carried out step by step in an orderly manner, and the unit was overhauled for safer, more stable and more economical operation. Eating specially prepared supper in the canteen, looking around, there are still many colleagues who give up their personal rest and work overtime for the crew. As one of them, they feel their mission and responsibility.

The above is just a microcosm of the life of electric workers during the Spring Festival. Some people compare electric workers to messengers of light. This metaphor appropriately describes the workers in this special industry of our power plant. In this special industry, operators work day and night in the front line, work with machines, circulate with the sun and the moon, and contribute their youth, blood and wisdom in obscurity. As a grass-roots operator, I have long been used to running classes every day for 365 years, and I have long lost the concept of weekends. There is only day-to-day work and the familiar roar of machines on the spot. On the New Year's Eve of the Year of the Sheep, there are fewer relatives around, but there are more close and amiable family members, and they feel a different taste of "big family". For the first time, they didn't spend the New Year in their "small family", but they also had a different flavor.

Looking back on the past year, the company has made great progress in its development. The concept of NOSA goes deeper into the grass-roots employees, the concept of lean management is further instilled and popularized, and more efficient and scientific management tools are constantly introduced, which pushes the management level of the company to a climax and the profit level naturally goes up a step. As an ordinary member, I witnessed the growth of the company and realized the positive changes brought about by these standardization constructions around me. The working environment has been improved, articles and tools have been sorted out, data files have been standardized, employee spirit has been improved, employees' demands have been promptly fed back, and a simple, sunny and frank corporate culture has been more deeply rooted in the hearts of the people. "Men are afraid to get into the wrong business and women are afraid to marry the wrong husband", and I am very proud to grow up with the enterprise. I learned not only professional knowledge, but also advanced methods and positive attitude in the process of growing up, which benefited me for life.

I can't help but see familiar faces who work together day and night. Every one of them is ordinary, simple and lovely. On this ever-increasing platform, they volatilize enthusiasm, enjoy passion and feel affection. It is precisely because of the persistent efforts of these ordinary people that a brightly lit and lively life is guaranteed. In this way, they are all great, because they can endure loneliness and irritability, give up their small families for everyone, make selfless contributions, and make unremitting efforts to realize a better "China Resources Dream". The Year of the Sheep is coming, let's continue to uphold the spirit of challenging ourselves and making continuous progress, and create a more brilliant tomorrow with joy!

(B): Miscellaneous Notes on the Spring Festival in 20xx

During the Spring Festival this year, I knew very early that the # 1 and #3 machines were overhauled by an intermediary, and the #6 machine was overhauled at the D level. I promised my old mother and relatives and friends in advance to go home and have a good life next year.

The seven-day long holiday passed quickly, and unconsciously, the holiday was over. I promised to take my son skiing, but in the end I broke my promise. Thankfully, my fellow villagers returned to Xu for the New Year, took my son and my son to the ski resort in Quanshan Park, and told him that this was not a breach of contract.

On New Year's Eve, I arranged to clean the filter screen at the inlet of #5 1 feed water pump on the evening of the 29th of New Year's Eve. I didn't return to the office from the scene until two o'clock in the morning for fear of disturbing my colleagues' rest. I didn't go to the hostel and slept at the conference table. At six o'clock in the morning, I'm afraid there is no fire water on the side of the furnace. I hurried to the scene to find out the reason, and found that the reason was that the valve core of the main door on the furnace side fell off and the stone fell to the ground. Units #2, #4 and #5, which went to the site at eight o'clock to inspect the operation, met Mr. Wang Yi who was visiting the operation and maintenance personnel who were sticking to their posts during the Spring Festival early in the morning, and their hearts were warm after greeting each other. Back in the office, I saw that our professionals Chen Fei and Lai Guoqing had changed their work clothes and were ready to visit the site. After greeting each other, I thanked my colleagues who didn't know what the festival was. /kloc-received a phone call from the Wei department of the department at 0/4, saying that #5 machine would be shut down at night, and/kloc-held a meeting at 0/5 to discuss the Spring Festival maintenance.

After getting the news, the three people who worked overtime had a short meeting first, which formed the third phase of steam turbine specialty and the maintenance project and demand of #5 machine. From 15 to 17, Cui Department and Wei Department organized a department maintenance seminar, which was attended by professional supervisors. (1) Determine maintenance items and schedule requirements, and arrange shutdown tracking professionals. Originally planned to stop at 18, but stopped at 2 1 under the constant interference of provincial dispatching. On the way back to the office from the #5 engine room, I was moved beyond words when I saw three partners who were still sticking to the scene in Shanghai carefully polishing the high-pressure side valve seat. Chen Chaohu, who returned to the office late at night, always praised him in the WeChat "Production Technology Group". I got home nearly 22 o'clock in the evening, and my wife and children had already eaten the New Year's Eve dinner. After coming back, we sat down together, ate some more, and said some blessings to each other. After dinner, I watched CCTV's Spring Festival Gala, kept vigil until the bell rang at 0: 00, and called my confused son to shoot. Son: Reduce PM2. He didn't buy a gun after communicating with his mother, so our family won't shoot and cause pollution this Spring Festival, and nod happily for our son.

On New Year's Day, I came to work at half past eight and met three brothers next to Gao Xiu at the gate of the office building. When we meet, we will say that the maintenance is completed, except to remind us to have a rest. Looking at their distant backs, I thought dully: such maintenance personnel are really rare. When I entered the office, I sat down and looked at the operation record. Check whether the parameters of #5 machine are normal after shutdown through PI, coordinate how to do isolation measures for maintenance equipment of #5 machine shutdown, and determine whether the required materials are in stock. Unconsciously, the whole morning passed, and when I was eating with a free lunch roll issued by the company, I felt the atmosphere of Spring Festival. In the afternoon, I walked around the cooling towers of Units 5 and 6, thinking about what measures should be taken. Only two units were shut down for about ten days to eliminate the defects of the public system, and the downtime was only four days. Whispering in the cold wind, I watched the system check the valve until 16, and I couldn't think of a clue. I'd like to call the relevant colleagues from the power generation department, the technical support department and the steam turbine unit for a "Zhuge Liang meeting" tomorrow to see if there is any good way.

At nine o'clock in the morning of the second day of junior high school, I had a meeting with Liang Guoguang of the power generation department, Song Tao of our major and Xie Ning of our team, and telephoned Hang Zhiying of the power generation department. It is unrealistic to repair the third-stage fire water inlet valve and circulating water discharge valve of #5 and #6 units by draining water from two cooling towers. The only relief is to stop the industrial reuse water system and replace the inlet and outlet doors of the industrial reuse water pump to facilitate the isolation and maintenance of the water pump. 14, the first meeting of 602D was held. After the meeting, Sun Wei, who contracted for maintenance, and the professional National Day went to the startup site of the #6 machine, and put forward some requirements such as placement and isolation. It was 17 o'clock when he returned to the office.

The next day, the third day and the fourth day, the maintenance brothers were busy according to the pre-arranged maintenance plan, and there were not enough people. Then they fought a war of annihilation, temporarily shelved the work of # 1 and #3 machines, and fully promoted the maintenance work of one million machines. In order to ensure that the scheduled maintenance was completed on the fourth day of grade four 12, the maintenance brother needed to work overtime at night, and called Zhang Ban in the canteen to order dinner and supper. He heard that it was urgent and promised to send it to the scene without saying anything. Master canteen, thank you very much.

On the evening of the fourth day, a buddy I haven't seen for a long time returned to Xu for the New Year from Hebei. When I saw that all the repairs were finished, I agreed. I met my buddy at 18: 30. During dinner, the shift supervisor said that the shaft seal bypass door could not be opened. Please call me to coordinate the handling. Although it was handled quickly, I always blamed myself for not following the scene.

Arrived at the scene at seven o'clock the next morning, and the #5 machine was connected to the grid. Song Tao, who stayed up all night, was arranged to go back to rest and patrol the No.5 machine himself. At the same time, when the unit was just started, he repeatedly urged maintenance personnel to patrol and inspect more. Go back at noon and visit my mother-in-law in the afternoon.

At nine o'clock on the morning of the sixth day, I went to the scene and looked at the maintenance situation. I saw that the maintenance arrangement of #6 machine was in good order. I quickly thanked the National Day, which has been in charge of turbine maintenance at the scene. I didn't see anything in the afternoon, but played badminton with my golfers all afternoon.

The seven-day holiday and rest time add up to one day, but it is full. He smiled and said to his wife and children: Don't shoot for environmental protection. Because of overtime, I pushed away a few drinks, which made the gastrointestinal living environment environmentally friendly.

(C): Peace is in my heart.

The jubilant Year of the Sheep has arrived, and the sound of New Year greetings on the roadside streets and the dazzling holiday packages in the supermarket have gradually pushed the atmosphere of the New Year to a climax. This year's Spring Festival, for me, is similar to last year. Last year coincided with the 60 1D overhaul of #6 unit, and this year it became a 602D overhaul. Last year, I couldn't go back to my hometown for the New Year. My parents are very sorry, so I applied to my hometown with my leader at the beginning of this year. I feel that I am surrounded by Peng Dianren, who is in charge of the factory!

On New Year's Eve, the company prepared free meal coupons for us, and the rich lunch made people feel grateful. Because the unit just stopped, many safety measures for working tickets were waiting to be implemented, and the busy day passed quickly. My wife works in a hospital. On her 30th birthday, she works the night shift. She didn't sleep a wink all day, prepared a good table, cleaned the house and posted Spring Festival couplets. In her words, no matter how busy you are, you must have a taste of the year! Watch the Spring Festival Gala with my wife at home at night and shake red envelopes. Stop having fun! It's just that my mother called and said that her daughter, who was taken care of by her parents in her hometown, caught a cold and went for intravenous drip at the age of 30. She was very worried!

On the morning of New Year's Day, because everyone was resting at home, the road was extremely deserted. I arrived at the factory nearly 20 minutes earlier than usual, thinking I was early, but when I walked into the centralized control room, the company leaders had already paid a New Year call to everyone in the centralized control room, and I couldn't help feeling a little ashamed. Because two units were shut down in the third phase of this year, everyone was more relaxed than usual and wished each other a happy new year! However, the festive atmosphere of the New Year cannot affect the normal working atmosphere. The string of safety is always tight, and every step of operation and every safety measure must be put in place. During the Spring Festival, more maintenance workers went home for the New Year, and many work leaders in 602D didn't come to apply for work tickets, which gave our operation group members time to learn the cascade of safety systems, and also had the opportunity to implement the isolation certificate measures in advance, all for the smooth development of future maintenance work.

Going back to my hometown at the beginning of the year, except for the time on the road, I only have two days at home. Two days later, I met my good friend and had a cup of tea. On the third morning, my father was ill and went to the county hospital for minor surgery. When I was in the ward, my mother asked me if I could go back a few days later. I was silent. Father endured the pain, lying in the hospital bed and telling his mother that the minor ailment would be cured soon. What do you want the children to do at home? I know he wants me to stay, but the overhaul of 602D is about to start in full swing, and the members of the operation team are so busy that I really can't talk about it. At noon on the fifth day, I still set foot on the return trip. Before leaving, my three-year-old daughter and I said, "Doudou, grandma wants to take care of you at home alone." You must take care of grandpa. You must be good and obedient! " I wonder if she heard it. Her eyes have long been attracted by the toys of street vendors.

Busy maintenance work is carried out as scheduled: take safety measures and handle working tickets; End the working ticket and restore safety measures; Temporary power supply wiring, bus power outage maintenance. A lot of work is very busy, and I feel that time passes quickly. Before I get off work every day, I tidy up my day's work and post the maintenance information release form on Tencent. I am relieved and have a safe day! Mom's phone also brought good news. Father has been discharged from the hospital and gone home to rest. I hope he will recover soon, but the tall and powerful figure in my mind has quietly grown old.

20xx New Year, I hope my relatives and friends around me will be safe and healthy! I hope all the units in the factory will run safely and stably! Peace is in your heart and mine, and happiness needs our protection!