In today's society, the frequency of using responsibility letters is on the rise, which helps to clarify everyone's goals and responsibilities. Presumably, many people are worried about how to formulate the responsibility book. The following is my collection of construction personnel's responsibility for safety objectives (5 general remarks), which is for reference only and I hope it will be helpful to everyone.
Responsibility Letter for Safety Objectives of Construction Personnel 1 In order to ensure safe construction and your health, you must obey the safety management of this project, abide by various safety production rules and regulations, consciously take your own safety protection measures, and do not hurt or be hurt by others, and consciously abide by the following terms:
1, enter the construction site must wear a helmet, fasten the hat belt; It is forbidden to wear slippers, hard shoes, high heels, barefoot and shirtless; Correct use of personal labor protection articles.
2, high homework are not allowed to throw down or up objects such as materials and tools; Please fasten your seat belt when hanging.
3, are not allowed to climb scaffolding or derrick up and down; It is forbidden to build derrick hanging basket; Conveniently close the protective door of the material hoist platform; Do not stay or work under the jib, and do not operate or command illegally.
4. Non-electrician certified personnel are not allowed to dismantle electrical equipment and pull wires indiscriminately; It is not allowed to bind and move the electrical switch to use its lost protection function; It is forbidden for non-certified mechanical operators to start, operate and use mechanical equipment.
5. Check the safety performance and function of all kinds of mechanical equipment before use, and do not use unprotected and faulty mechanical equipment; If any abnormality is found during use, it should be stopped immediately and reported to the management.
6, are not allowed to sit on the armrest and lying on the scaffolding and roof, balcony and other limb; It is forbidden to walk and work around unprotected buildings, near the hole and on unfixed components; Do not cross work in the same vertical direction.
7. It is forbidden to destroy or dismantle safety facilities without authorization; When the safety protection facilities need to be removed or changed due to operation, it must be approved by the project leader, and corresponding reliable measures should be taken, and they should be restored immediately after operation.
8. Smoking is prohibited on the construction site; Without approval, it is strictly prohibited to use open flame in the construction site; When there is no fire, it is forbidden to move and use fire-fighting equipment without authorization; It is forbidden to move protective facilities.
9, homework are not allowed to adventure foolhardy or frolicking; Do not work after drinking.
10, it is forbidden to use high-power heating appliances such as gas stoves, rice cookers, induction cookers and rapid heating in the dormitory; Prohibition of cohabitation between men and women; Children are prohibited from entering the construction site; Personnel without safety training are not allowed to work or stay at the construction site.
1 1, after the accident, we should actively rescue the wounded and property, protect the scene, and report to the leader in time.
12. The project department shall implement necessary safety protection articles and safety protection facilities according to the requirements of "safe production and civilized construction" to provide a safe and civilized construction and living environment for the construction personnel.
13. The operator has the right to refuse to execute the order of the construction manager in violation of the above terms. If the accident is caused by the sender's forced illegal operation, the sender shall bear all the responsibilities until criminal responsibility is investigated.
I consciously abide by the above terms and conditions, and I am willing to accept financial punishment until I leave, and I am willing to bear all economic losses and criminal responsibilities if I cause an accident.
Person in charge:
Xx,xx,XX,XX
Safety objectives and responsibilities of construction personnel II. Safety production and civilized construction responsibility objectives
5. Elimination: Eliminate major casualty accidents, fatal accidents, major mechanical accidents, major traffic accidents and major fire accidents.
One control: the annual injury rate is really controlled below 10‰.
Elimination: Eliminate illegal command, illegal operation and inertia accidents.
First, create a safe and civilized standard construction site.
Second, the responsibility of production safety
1, earnestly implement the policy of "safety first, prevention first", earnestly implement various rules, regulations and measures for safe production, and assist the project manager to do a good job in safe production.
2. Take an active part in the work conference on safety production, put forward reasonable suggestions on safety work, and assist the project manager in organizing safety production activities and safety inspection.
3, the management personnel on duty should be on duty in time, not to take off the post, and record the problems found in the duty, report in time, and put forward a proper solution to the problem.
4, management personnel should be serious and responsible in the work, bold management, take the lead and urge the use of personal protective equipment, not illegal command, correct illegal operations at any time.
5. Assist the project manager to do a good job in propaganda, education and management of safety production, summarize and popularize advanced experience and specific measures of safety management in time, and ensure the smooth progress of safety work.
6, the hidden dangers and unsafe factors put forward by the higher authorities should promptly urge the relevant personnel to carry out rectification.
7. Those who violate the rules regardless of the consequences should be stopped and educated in time.
Person in charge:
Xx,xx,XX,XX
Responsibility Letter for Safety Objectives of Construction Personnel 3 In order to implement the Construction Law, Regulations on Safety in Production of Construction Projects, Regulations on Construction Site Management of Construction Projects of the Ministry of Construction and the spirit of provincial and municipal documents on safety in production, increase the responsibilities of construction safety management personnel at all levels of the company and the project department, implement the responsibility system for safety work, and put an end to safety accidents, the annual responsibility letter for safety objective management is specially formulated. The specific terms of reference are as follows:
I. Party A's Safety Responsibility
1. Seriously publicize and implement the Building Law, Regulations on Safety Production Management of Construction Projects, the regulations of the Ministry of Construction, provinces and cities on strengthening safety production and equipment management and the spirit of the notice, supervise in strict accordance with the Safety Inspection Standard for Building Construction (JGJ 59-99), and guide the project department to implement it in accordance with the regulations on mechanical equipment management.
2. Organize safety production and mechanical equipment inspection on a regular basis every month, and inspect it irregularly at ordinary times, supervise and guide the project department to do a good job in rectifying hidden dangers of accidents, hold regular safety production meetings, study and arrange safety production work, and do a good job in the installation and acceptance of large equipment in conjunction with the safety supervision station. Units and individuals that fail to rectify hidden dangers during the inspection have the right to take economic penalties.
3. Organize "Safe Production Month" and "Hundred-day Safety Accident-free Activity Competition", set up a safety competition activity group, make an activity plan, and do a good job in summary and appraisal.
4, in conjunction with the relevant departments to organize the education and training of special types of work, safety personnel, responsible for the training, examination and certification of machine operators.
5. At the end of the year, the company will commend the advanced project department and project manager of safety production, and give appropriate rewards to the project department that created civilized construction sites above the municipal level.
II. Party B's Safety Responsibility
1. Be sure to conscientiously implement the Construction Law, Regulations on the Administration of Work Safety in Construction Projects and other relevant laws and regulations, improve and perfect various safety systems and safety responsibility systems at all levels, implement the principle of "whoever employs is responsible", and put an end to safety accidents. If there are casualties, please report to Party A and the superior administrative department in time according to the regulations, and consciously understand the investigation and handling by the superior administrative department.
2. Be sure to seriously implement the regulations of the Ministry of Construction on construction site management and the notice of provincial and municipal construction bureaus on creating civilized construction sites, carry out safety production and civilized construction management on the construction site in strict accordance with the construction safety inspection standard (JGJ59-99), understand and obey the supervision, inspection and guidance of Party A, organize and carry out civilized construction site creation activities with heart, and each project department will strive to create civilized construction sites in the city and strive to save civilized construction sites.
3. Organize "Safety Production Month" and "Summer Hundred Days Safety Accident-free Activity Competition" with your heart, publicize safety standards, create a site with smooth civilized construction, hold regular safety production meetings, organize safety production inspections, and ensure that the safety compliance rate 100% is up to standard and the software information 100% is complete.
4, special type of work personnel should hold relevant certificates, put an end to unlicensed operation and expired invalid card behavior. Party B must have enough personnel to manage safety. For projects with a building area of less than 1 10,000, there must be full-time safety officers; for projects with a building area of more than 1 10,000, there must be 2-3 full-time safety officers; for large projects with a building area of more than 50,000, safety management teams shall be formed according to different specialties to conduct safety supervision and management.
5, strengthen the management of machinery and equipment, responsible for the establishment of distribution account, regular inspection, repair, maintenance, it is forbidden to operate without a license, in spite of the operation, timely elimination of mechanical equipment with poor safety and technical performance, are not allowed to use machinery and equipment without production license, apply mutatis mutandis to license, all safety protection articles, scaffolding steel pipes, fasteners, safety nets, etc. Must meet the national standards and have a product certificate.
6, strengthen the management and education of migrant workers, improve the management and measures of employment, site construction personnel listed posts, shall not use unidentified personnel, for poor ideas, bad behavior and poor physical fitness personnel are not allowed to use, new workers without safety training and pre-job education are not allowed to hire or use.
7, pays special attention to the safety propaganda work on the construction site, posted safety signs, hanging safety banners, slogans, warning signs should be eye-catching, so that the construction site constitutes a strong safety atmosphere.
8, the construction must be in accordance with the provisions, the use of temporary electricity standard distribution box and steel scaffolding. There should be special construction plans and measures (emergency rescue plan, foundation pit enclosure, formwork support, scaffolding, temporary electricity consumption, etc.). ) For dangerous partial projects, it shall be compiled by safety technicians, reviewed by the technical director of the project and approved by the technical director of the company. The construction site must be equipped with full-time security officers. Party B shall regularly check the safety facilities on the construction site, report to Party A in time if any hidden accident is found, and make immediate rectification.
9, the project department must improve the responsibility system for production safety at all levels, project manager, project safety officer, project technical director, the builder, material engineer, safety officer, mechanical administrator, warehouse keeper, operation team leader and production workers.
Third, the reward and punishment measures:
Each project department shall complete the creation of civilized construction site indicators according to regulations, and those who complete the indicators will be rewarded, while those who fail to complete the indicators will be punished.
1. Give appropriate rewards to the civilized construction sites in cities and provinces created by the project department, and give appropriate punishment to those who fail to meet the standards of civilized construction sites.
2. The Project Department will be fined 50,000 yuan for each serious injury accident and 654.38 million yuan for each death accident, and all economic losses and legal responsibilities will be borne by Party B. ..
Fourth, others.
1. As an annex to the project construction management agreement, this duty watch has the same effect as the contract agreement.
2. This responsibility book is made in duplicate, one for Party A and one for Party B, and it will come into effect as of the date of signature and seal by both parties. Please implement it carefully.
Person in charge:
Xx,xx,XX,XX
Responsibility letter for safety objectives of construction personnel 4 refers to the high-pressure jet grouting pile that completes the construction of our team with high quality and high efficiency, so as to ensure the personal and equipment safety of employees. All construction units and all construction management personnel must establish the awareness of safety first and quality first, take safety production measures, eliminate potential safety hazards, do a good job in safety protection, organize production in strict accordance with technical disclosure and construction specifications, ensure the safety, high quality and smooth completion of the project construction, and put an end to safety accidents and quality accidents in the construction process.
In order to clarify the responsibilities of each unit and production management personnel and ensure the safety and quality of the jet grouting pile project constructed by the soft foundation project department, each construction unit and team leader specially sign this safety and quality responsibility letter.
A, the construction unit safety and quality responsibilities
All units must strengthen production management, improve construction quality, ensure safety in production, often sum up experience and shortcomings in construction, strengthen awareness of safety in production, strengthen production quality management, strengthen equipment maintenance, and ensure rational use of materials.
(1) Responsibilities and requirements for construction safety
1, responsibilities and requirements for production safety.
A, require the person in charge of each unit to do a good job in employee safety training and skill training guidance before production, establish a sense of safety in production, do a good job in accident prevention, explain safety requirements, and take safety measures with heart.
B, in strict accordance with the high-pressure jet grouting pile construction specifications and technical requirements for production, eliminate potential safety hazards and do a good job in safety production.
C, each unit host operator should be familiar with the performance and operation method of pile driver, show certificates, can work closely with auxiliary workers, and may take emergency measures for accidents; Host operators must be professional and technical personnel, and it is forbidden for other non-professionals to start the machine without authorization; The host operator shall not leave the machine during construction, otherwise it shall stop;
D, it is forbidden to pile driver fatigue operation, drunk driving pile driver construction.
E, pile machine construction at night to ensure clear lighting around the pile machine.
F, stop working, the pile driver should be parked in a safe place, and relax the loaded parts, high-pressure pipeline with pressure flushing, and set up braking, anti-skid, windproof and other protective measures.
G, in case of heavy rain, snow, fog and strong wind, should stop working.
H, without the permission of the head of each unit, it is forbidden to go out, and the vehicles and personnel who go out should pay attention to their own safety.
I, it is strictly forbidden for all personnel to have conflicts and fights with local people.
J, prohibit all personnel from bathing in the river without permission;
K, when the weather is hot in summer, all units should always prepare tea, cooling and heatstroke prevention drugs, etc.
L, strengthen the canteen food hygiene, prevent food poisoning, keep continuous living environment hygiene;
All units must put an end to illegal operation, and all the accidents caused by illegal operation and intentional injury shall be borne by all units. For those who violate the above-mentioned safety management regulations or the relevant national regulations on safe construction and production, the crew and individuals shall bear all economic responsibilities and compensation responsibilities, and those who violate the regulations and blindly construct will be investigated for their economic and legal responsibilities.
It is agreed that all units in Meishuilin shall be managed by Meishuilin, and all safety accidents shall be handled by Meishuilin.
2. Safety production measures.
In order to ensure safety in production and the personal safety of personnel and equipment is not damaged, the following safety measures are taken seriously in production.
A, the person in charge of each unit must make a safety speech before the unit starts, explaining the safety requirements, construction specifications and technical requirements, doing a good job in safety protection, hanging up safety signs, and employees must wear safety helmets when entering the construction site;
B, check the drilling rig, grouting pump, generator and other mechanical equipment in detail, and carefully check the high-pressure pipeline, high-pressure valve, power cord and water supply pipeline; The safety pin in the safety valve should be pressure tested to eliminate potential safety hazards and prepare for safe production.
C, in the process of construction, operators of drilling rigs and high-pressure pumps are required to operate in strict accordance with the operating requirements of each equipment, so as to prevent recklessness, save for a rainy day, and put an end to machine injury accidents.
The drilling rig and high-pressure pump must be operated by special personnel, and the pressure gauge should be checked regularly.
The drilling rig must be placed smoothly and perpendicular to the ground to prevent toppling.
Rig operators must cooperate with auxiliary workers and high-pressure pump operators to prevent injuries caused by rig and high-pressure jet.
When loading the drill pipe, it must be carried out after the rig operator is ready, the drill pipe stops rotating completely, and the auxiliary tool is informed to pick up the drill pipe. The handle on the pad fork must be welded firmly to prevent personal injury.
The anti-skid end must be welded at the end of the drill pipe rack, and the drill pipe must be placed flat on the drill pipe rack, and the drill pipe rack should be placed stably to prevent the drill pipe from falling and hurting people.
Always check the high-pressure safety valve and high-pressure pipe to prevent high-pressure jet from hurting people.
Do a good job in safe use of electricity, and don't pull wires without permission. The distribution box should be well protected and installed with leakage protection devices. The wires should not be exposed, and the connectors should be firm and well protected to prevent electric leakage from hurting people.
D, stop work in time after production, remove sludge, repair and maintain equipment, put away pipelines and power cables, and do a good job of shielding.
(2) Responsibility and requirements of construction quality.
1. All units must carry out construction in strict accordance with the construction specifications and technical disclosure requirements of jet grouting piles and the production requirements issued by production management personnel. Slurry concentration, shotcrete time, shotcrete pressure, re-shotcrete construction, pile length, pile radius, shotcrete lifting speed, pile number and quality, cement dosage and diesel dosage must meet the requirements.
All units must protect the cement, add the cement strictly according to the production requirements, mark the depth of the pulping barrel, add the specified amount of water first, then add the cement, and after stirring, put the slurry into the secondary stirring tank for stirring. It is forbidden to put the mud into the secondary mixing tank while adding water, and the mud concentration is often detected by a densimeter to ensure that the concentration is above 1.5, which meets the concentration requirements.
All units must strictly control the consumption of diesel oil, do a good job in ensuring oil supply and put an end to waste; Engines that are not used for off-duty or parking for meals and maintenance must be stopped; All units must buy briquettes or gas for cooking, and it is strictly forbidden to use generators alone to generate electricity for cooking. Power generation and night lighting in the afternoon during non-production period (only from the generator lead during production period) can only be used by one generator for multiple units, and each power generation is required to be no more than two hours. Waste oil in violation of the above provisions, and impose a fine on 200 yuan.
2. All units must cooperate with the release of piles under the guidance of the foreman of this class, and the unit shall be responsible for the losses caused by the unauthorized release of piles; In the process of construction, if the production management personnel find that the unit fails to construct according to the requirements issued, and one pile does not meet the requirements, the quantities of five piles with the same depth required by the construction unit shall be deducted as punishment, which shall be deducted at the time of settlement; If it is found that the pile length and shotcrete quantity of each unit are insufficient and cement and diesel oil are wasted five times, the engineering quantity will be deducted and the exit penalty will be cancelled.
3. Each unit must arrange each test pile according to the requirements of production management personnel, and must notify the site team leader to record and construct the test pile under his supervision. Be sure to arrange the test piles as required, complete the required number and mark them.
Units that violate the above requirements and are repeatedly warned not to rectify can take measures to stop and rectify, and all losses caused thereby shall be borne by the unit.
4, pile quality and testing responsibilities and requirements.
1) All units must ensure the pile quality and depth of each test pile, and all units of other engineering piles must ensure the pile quality and required depth when each pile reaches the construction.
2) In the process of Party A's inspection and third-party inspection, the pumping pile construction unit is responsible for excavating the core-pulling or static load inspection pile head in time as required, and sending personnel to cooperate with the inspection preparation. Responsible for filling holes after core pulling, without extra charge.
3) When each sampling pile is unqualified, the pile construction unit shall bear half of the inspection business expenses and impose a fine of 3,000 yuan on the working expenses of the unit; The foreman who supervises the pile construction will be fined 200 ~ 500 yuan depending on the seriousness of the case; As a result, Party A will be fined, piling will be added, and the construction unit will bear the corresponding responsibilities.
If the common engineering pile is pulled out, the coring depth does not reach the depth required during construction, and the finished pile quality is unqualified, all parties shall be responsible for the unqualified pile.
Second, the foreman safety and quality responsibilities
Site foreman must pay special attention to "safe construction", establish the idea of "quality first, safety first", organize and coordinate production factors such as labor, materials, equipment, water and electricity, do a good job in construction, ensure the smooth completion of production tasks, ensure safe production and ensure material saving.
(a), the responsibilities and requirements of production safety.
1, the team leader should have a sense of safety in production, make a safety speech before shift, guide all units to carry out safety in production, regularly check whether all safety measures are in place, urge all units to eliminate potential safety hazards, urge rectification, make records and report them in time.
(2), production quality responsibilities and requirements.
1, the team leader must establish a high sense of quality responsibility, strengthen supervision over the production process of each unit, and supervise and verify whether the construction of each unit is carried out in accordance with technical requirements and construction specifications.
2. The team leader must guide the pile setting, regularly check whether the pulping concentration is above 1.5, and check the drilling depth, drilling speed, injection time, injection pressure and re-injection construction of the unit to ensure that the pile length, pile radius and finished pile quality of each pile meet the technical requirements.
3. The team leader must give on-site guidance, arrange and monitor the whole process, put down each test pile and mark it.
4. The team leader requires daily construction records, truthfully record the actual situation in production, and report the statistical data in time.
5. Supervise the rational use of cement, diesel and other materials in this unit, and do a good job of protection to prevent waste; Promote cement consumption and diesel consumption to meet the requirements.
6. When Party A's inspection and third-party inspection fail, the team leader who supervises the pile construction will be fined 200 ~ 500 yuan depending on the seriousness of the case;
If the common engineering pile is pulled out, the coring depth can't reach the depth required by the construction, and the finished pile quality is unqualified, the duty of the team leader shall be treated as the unqualified pile.
Three. This safety and quality responsibility letter shall be reviewed by the project leader and distributed to the construction unit and team leader before it takes effect.
Four. The right to interpret this safety and quality responsibility book belongs to the project leader and the site leader, and is filed by the finance office.
Person in charge:
Xx,xx,XX,XX
Responsibility letter for safety objectives of construction personnel 5 is to conscientiously implement the policy of "prevention first, safety first", further strengthen the safety management of construction site, control and reduce casualty accidents, and promote the further improvement of construction safety production situation. According to the safety responsibility letter and requirements issued by the superior competent department, combined with the actual situation of our company, we decided to issue a safety responsibility letter to the construction site of this project and implement safety construction target management.
First of all, we must do four things:
1, we must conscientiously implement the safety production rules and regulations and safety operation procedures, reasonably arrange the work of the team members, and be fully responsible for the safety and health of the team members in production.
2. Be sure to conduct self-inspection, mutual inspection and handover inspection of the project according to the safety and quality requirements and inspection procedures. If the inspection is unqualified, it will not be transferred to the next working procedure, and the safety and quality of the working procedure will be strictly controlled.
3, must be limited materials, limited acquisition, strictly according to the quota materials, reduce material consumption. Use aniseed, long material and short material, and use machinery, equipment and tools according to the operation procedures.
4, be sure to implement the safety technical measures and technical responsibility system, all kinds of drawings, documents, data, original records, files, etc. are complete, true and intact, and filed in time.
Second, do nine tasks every day:
1, check the potential safety hazards in the working environment before shift, and make records. And timely rectification, shall not be handed over to the foreman.
2. Arrange the safety and quality prevention measures in the day's work and make records.
3, take the initiative to find the foreman, solve the construction progress, quality, safety, responsibility area materials and other on-site management problems.
4, team members to participate in the foreman organization construction technology, technology, quality disclosure, organize team members to conduct self-inspection, mutual inspection, to participate in the subentry project quality inspection and evaluation, sign the subentry project quality evaluation form, fill in all kinds of original data in accordance with the provisions, and be responsible for the reliability of the data.
5. Instruct the workers to fasten their seat belts when working at heights of more than 2m, and check that the workers in this shift should wear safety helmets when entering the construction site.
6. Organize internal technical exchanges among team members, and constantly improve the technical level of team members. Do not use materials, finished products, components and equipment that meet the design requirements and quality standards, and have the obligation to report to the team leader and superior leaders.
7. Organize team members to look at the pictures carefully, carry out construction according to design drawings, technical disclosure, specifications, process standards and quality standards, and be responsible for the quality of disciplines and divisions of contracted projects.
8. The materials used in the day should be cleaned up after work, and the inexhaustible materials should be recycled. The mechanical equipment used that day should be cleaned and maintained according to regulations, and the tools used that day should be cleaned and recycled.
9. Always educate team members on the concept of "safety first, quality first". The following procedure is the user's idea to improve the operation quality of each member. If the team members violate the rules and shoddy, they have the responsibility to stop work and rework. Report the quality problems to the superior leaders in time, and do not deal with them without authorization, otherwise take full responsibility.
Three, for the project manager and construction team, their safety responsibilities are as follows:
1, on-site project manager (project technical director) should always study and solve practical problems in production safety to ensure the implementation of the responsibility system for production safety. And is responsible for solving the deployment and supply of people, money and materials needed for the project construction, and solving the difficult problems encountered in the construction in time to make the project go smoothly.
2. The company will regularly follow up and check the implementation of the target management responsibility system for safety production, so as to ensure that it is implemented at one level and at all levels, so as to prevent formalism from becoming superficial.
3. The company will strictly evaluate the implementation of this responsibility in the construction site. Commend and reward those who do well, and give informed criticism those who do badly. Safety accidents caused by lax implementation of the responsibility system shall be investigated for responsibility in accordance with relevant regulations.
4. Have the right to coordinate, supervise, inspect and punish the working standards, quality and progress, safe production, civilized construction, personnel arrangement, labor use and economic distribution of each team, and have the right to exercise economic compensation and dismissal for violations of the project management system.
5, each team strictly control the safety and quality, no quality accidents, no safety accidents. Achieve the standardized management of process operation, quality and safety, solve the problems in construction in time, and report to the foreman immediately beyond its processing authority. The time from finding the problem to solving it (reporting to the foreman) shall not exceed 10 minutes.
6, to ensure the progress of the construction period, strictly implement the safety technical disclosure, strictly implement the process quality operation procedures. Ensure that the operation area is cleaned up after work on the same day, and the materials in the responsibility area are piled up at one end, so that the environment is safe and tidy.
7. It is forbidden to store inflammable and explosive articles on the construction site, and smoking is prohibited at the same time; Smoking is strictly prohibited in the non-smoking area.
8. There shall be no obstacles near the electric box on the construction site, and it is forbidden to pull wires privately.
9, the construction site equipped with fire equipment shall not be used for other purposes, and there are no obstacles near the fire equipment.
10, no mechanical casualties and no fire accidents.
1 1, abide by the safety management system, attend the on-site safety production meeting and implement the meeting decisions.
12, when entering the construction site, be sure to wear safety helmet and fasten the hat belt.
13. All construction personnel shall bear the following responsibilities: major quality accidents; Responsibility for delaying the construction period; Major safety accidents; Responsibility for major public security disasters and accidents.
14. Register and record the construction personnel of this team, and record the "three-level safety education" for the construction personnel. Personnel without safety education are not allowed to enter the construction site.
15, persons without identity documents, persons over 50 years old but under 18 years old, patients with infirmity, heart disease, hypertension, epilepsy, high myopia and other contraindications are not allowed to work on the construction site.
16, when hot work is carried out in fire-prone areas, effective preventive measures should be taken before construction.
17. Educate the employees of this unit to observe the rules and discipline, and not to command or operate illegally. Casualty accidents caused by illegal command, violation of safety discipline and violation of safety operation rules by construction personnel shall be borne by construction personnel.
2 1. If the quality rework is caused by the construction personnel's illegal operation command and violation of process operation, the material cost and rework cost shall be compensated.
22. If the quality of documents such as process operation, construction organization design and instructions issued by managers at all levels in the working layer is reworked due to violation of scientific management or problems existing in the issued documents or management, the person in charge and the responsible person shall compensate the material fee and rework fee according to the post.
23, due to illegal command, dereliction of duty and other safety accidents caused by the responsible person to bear all legal responsibilities and economic penalties.
There is only one copy of this agreement, which shall be kept by us and come into effect from the date of signature. This project is valid until it is completed.
Person in charge:
Xx,xx,XX,XX
;