General contractor: (hereinafter referred to as Party A)
Employer: (hereinafter referred to as Party B)
Project location: _ _ _ _ _ _ _
In order to implement safety management measures and ensure the safe and orderly implementation of the project, Party B made the following commitments during the project construction:
(a) Before the start of work, safety education must be given to subordinates, and safety precautions and measures should be disclosed. Personnel without safety education are not allowed to enter the workplace.
(2) Educate its own construction personnel to strictly abide by Party A's safety and security rules and regulations and various construction technology specifications, and consciously obey the on-site safety management of Party A's project management director and security personnel;
(3) Strictly abide by the safety production rules and regulations, consciously accept the safety supervision, management and guidance of Party A's unit, and do a good job in safe and civilized construction.
(4) All construction personnel entering and leaving the site must wear temporary passes issued by Party A's security department and accept the supervision and inspection of Party A's management personnel;
(5) Implement the construction progress. If the construction is carried out outside the planned time (Party A's abnormal working hours), an application shall be made to Party A's project leader in advance and reported to Party A's security department for approval and filing. Except for approved special circumstances, all construction personnel shall leave the site before 19: 00 every day;
(six) do not engage in any form of commercial activities in the construction site;
(seven) consciously protect the property of the construction site and fire, electrical appliances, network, office, decoration and other equipment and facilities in good condition;
(8) With the consent of Party A, temporary electricity, water and hot work for construction laid in accordance with relevant safety regulations shall be equipped with leakage protection, fire prevention and other safety facilities that must be guarded against according to the requirements of the regulations, and wires shall not be connected without authorization;
(9) For complex and dangerous engineering projects, separate safety technical measures shall be formulated and implemented after being examined and qualified by Party A's unit.
(ten) shall not be arranged without the relevant departments of the training and assessment of undocumented personnel engaged in special types of work.
(1 1) When working at high altitude, safety protection must be carried out under or above the working platform, and special personnel shall be assigned for supervision. Personnel must wear safety belts and helmets correctly, and scaffolding or ladders must be safe and reliable, with anti-dumping measures. (12) Keep the construction site clean, do not pile up construction sundries everywhere, and properly place flammable materials for construction.
(13) Don't talk loudly, make noise, boo and fight. At the construction site;
(fourteen) not smoking, drinking and influencing others in the construction site uncivilized behavior; (15) Do not stay at the construction site. In case of special circumstances, it must be approved by Party A; (16) If a safety accident occurs due to our reasons, we will bear all the consequences;
(17) If the above commitment is violated, we agree to deduct relevant expenses from the final accounts of the project.
Unit name:
Commitment letter of safe and civilized construction. Our company has the honor of winning the bid to build this investment project. In order to realize safe production and civilized construction and ensure the smooth progress of the project, our company and the project manager solemnly promise to relevant parties:
1. Conscientiously implement the safety production laws and regulations such as the Construction Law, the Law on Work Safety and the Regulations on the Administration of Work Safety in Construction Projects, adhere to the principle of "safety first, prevention first", establish and improve the safety production management system of enterprises and project departments, and make it run normally and effectively;
Second, set up a project management team in accordance with the regulations, with full-time safety production management personnel, part-time safety officers for each team, and establish a safety production supervision and management network;
Third, the cost of safety and civilized measures paid by the construction unit will all be used for the purchase and update of construction safety protection appliances and facilities, the implementation of safety construction measures and the improvement of safety production conditions, and will never be used for other purposes;
Fourth, strengthen the safety education and training for the operators entering the site. Special operations personnel should hold valid certificates; All operators have received "Level 3" safety education and training, and can only take up their posts after passing the examination;
Five, the implementation of mandatory standards for production safety in engineering construction, strict and comprehensive implementation of the approved construction organization design and special construction scheme and its safety technical measures, and in accordance with the provisions, do a good job of safety technical disclosure;
Six, the company and the project department are in accordance with the provisions, hierarchical implementation of supervision and inspection, timely eliminate all kinds of accidents, and timely report according to the relevant provisions;
Seven, strengthen the civilized construction management of the construction site, educate employees to consciously resist the "four chaos" behavior, the fence, gate, washing table, road hardening, material stacking, building facade, overlay and catering, etc. Meet the requirements of civilization and hygiene;
Eight, accept the supervision of the administrative department of construction and construction, supervision, survey and design and social stakeholders, take seriously the instructions or opinions and suggestions put forward, and eliminate all kinds of hidden dangers in time;
Nine, the occurrence of production safety accidents, in accordance with the provisions of the accident management, timely report to the construction administrative departments, local production safety supervision departments and other relevant departments, and actively cooperate with the accident investigation and handling, and never conceal or delay the report.
The above commitment is the expression of the true consciousness of the enterprise and the project manager. If it is violated, it is willing to accept the punishment given by the relevant parties according to law or regulations.
Organizer (official seal): Project Manager (signature):
Date: Date:
Commitment Letter for Safe and Civilized Construction Article 3 Project Name: _ _
General contractor: (hereinafter referred to as Party A)
Employer: (hereinafter referred to as Party B)
Project location: _ _ _ _ _ _ _
In order to implement safety management measures and ensure the safe and orderly implementation of the project, Party B made the following commitments during the project construction:
(a) Before the start of work, safety education must be given to subordinates, and safety precautions and measures should be disclosed. Personnel without safety education are not allowed to enter the workplace.
(2) Educate its own construction personnel to strictly abide by Party A's safety and security rules and regulations and various construction technology specifications, and consciously obey the on-site safety management of Party A's project management director and security personnel;
(3) Strictly abide by the safety production rules and regulations, consciously accept the safety supervision, management and guidance of Party A's unit, and do a good job in safe and civilized construction.
(4) All construction personnel entering and leaving the site must wear temporary passes issued by Party A's security department and accept the supervision and inspection of Party A's management personnel;
(5) Implement the construction progress. If the construction is carried out outside the planned time (Party A's abnormal working hours), an application shall be made to Party A's project leader in advance and reported to Party A's security department for approval and filing. Except for approved special circumstances, all construction personnel shall leave the site before 19: 00 every day;
(six) do not engage in any form of commercial activities in the construction site;
(seven) consciously protect the property of the construction site and fire, electrical appliances, network, office, decoration and other equipment and facilities in good condition;
(8) With the consent of Party A, temporary electricity, water and hot work for construction laid in accordance with relevant safety regulations shall be equipped with leakage protection, fire prevention and other safety facilities that must be guarded against according to the requirements of the regulations, and wires shall not be connected without authorization;
(9) For complex and dangerous engineering projects, separate safety technical measures shall be formulated and implemented after being examined and qualified by Party A's unit.
(ten) shall not be arranged without the relevant departments of the training and assessment of undocumented personnel engaged in special types of work.
(1 1) When working at high altitude, safety protection must be carried out under or above the working platform, and special personnel shall be assigned for supervision. Personnel must wear safety belts and helmets correctly, and scaffolding or ladders must be safe and reliable, with anti-dumping measures. (12) Keep the construction site clean, do not pile up construction sundries everywhere, and properly place flammable materials for construction.
(13) Don't talk loudly, make noise, boo and fight. At the construction site;
(fourteen) not smoking, drinking and influencing others in the construction site uncivilized behavior; (15) Do not stay at the construction site. In case of special circumstances, it must be approved by Party A; (16) If a safety accident occurs due to our reasons, we will bear all the consequences;
(17) If the above commitment is violated, we agree to deduct relevant expenses from the final accounts of the project.
Unit name:
4 limited company safety civilization construction commitment:
Upon receipt, your company will immediately organize relevant personnel to conduct careful research, and make the following commitments to the tenderee according to the scope, time limit, quality, safe and civilized construction, settlement materials, wage payment for migrant workers, warranty and other matters of the tender documents and contract conditions:
1. Commitment to contract conditions: acknowledge and accept the requirements of your tender documents and the constraints of contract conditions;
2. Time limit commitment: If our company wins the bid, our company promises to start construction within the specified time after receiving the notice of commencement, and complete all the project construction according to the contract time limit and node requirements;
3. Project quality commitment: ensure that the construction is carried out in accordance with the technical requirements and quality requirements of the bidding documents, and ensure that the project is qualified and meets the excellent engineering standards;
4. Commitment to safe and civilized construction: Strictly abide by the People's Republic of China (PRC) Law on Work Safety, Regulations on Work Safety Management of Construction Projects, Regulations on Work Safety License and other laws and regulations to ensure that no major accidents occur and achieve the following objectives.
5. Submit complete and effective settlement data;
6. Commitment to pay migrant workers' wages: establish a roster of migrant workers, publicize the payment of migrant workers' wages on time every month, and accept the supervision and verification of the labor and social security department and your company to ensure that migrant workers' wages can be paid in full and on time;
7. Warranty commitment: Our company promises to be responsible for any quality defects and their consequences of this project within the warranty period stipulated in the contract, and fulfill the warranty obligations in time according to the contract. Commitment unit:
Legal representative:
Date: Year Month Day
Commitment to Safe and Civilized Construction Article 5 In order to further implement the Safety Production Law, the Regulations on the Administration of Safety Production in Construction Projects and other laws, regulations and rules, and ensure the safety of construction production on the project site, I, as the first safety person in charge of this project, am fully responsible for the safety work, and hereby solemnly promise as follows:
1. Strictly abide by national laws and regulations, adhere to the safety production policy of "safety first, prevention first, comprehensive management", earnestly implement the responsibility system for safety production of personnel at all levels, and strive to achieve controllable, controllable and controllable safety production.
The second is to establish and improve the safety production guarantee system and supervision system, improve the safety production command system, improve the safety management and assessment system, formulate key requirements and measures to achieve the annual safety production work objectives and follow up.
Third, do a good job in the analysis and pre-control of dangerous points, vigorously carry out standardized operations, scientifically analyze the safety situation at the project site, find out the weak links and hidden dangers of accidents, and take effective preventive measures in time.
Four, to ensure the full investment of funds needed for safety in production, focusing on the extraction and use of funds needed for anti-accident measures and safety technology and labor protection measures plan ("two measures" plan), the establishment of safety production incentive fund, to ensure the extraction and use of funds needed for safety incentives.
Five, in accordance with the "Regulations on the Administration of Work Safety in Construction Projects" and other laws and regulations and the requirements of relevant industry safety standards, formulate construction plans and preventive measures, effectively protect dangerous parts of the construction site, put an end to illegal command and operation, and ensure that all parts and links of the construction site meet safety requirements.
6. Organize regular safety work meetings, analyze the shortcomings and problems existing in safety work, and formulate corresponding rectification measures and management plans; Organize regular internal safety inspections, and timely organize rectification for problems found by superior units, owners, supervision units and internal inspections.
Seven, organize employees to participate in safety education and training on a regular basis, improve the safety awareness of employees, ensure that employees are familiar with the rules and regulations related to safety production and safety operation procedures, and master the safety operation skills of this position.
Eight, formulate emergency plans for major casualties, equipment damage and other safety accidents, establish a systematic, hierarchical, consistent, clear division of labor and coordinated emergency system for safety accidents, and organize their implementation.
Nine, the investigation and handling of major accidents, strictly implement the principle of "four pass". For major or typical accidents, timely grasp the accident situation, hold a special accident analysis meeting, put forward measures to prevent accidents from happening again and conscientiously implement them.
Ten, strengthen the construction of enterprise safety culture, closely around the situation of enterprise safety production, carry out ideological and political work, take various vivid and effective forms to educate employees on safety thought, professionalism and discipline, so that employees can establish a firm "safety first" thought.
Commitment unit (official seal):
Signature of the first person in charge of safety:
Signature of other members of the leadership team:
Commitment time: year month day
Commitment recognition unit (official seal):
Signature of the first person in charge of safety:
Approval time: year month day.
Letter of Commitment for Safe and Civilized Construction (1) Time for submission of design documents to be completed by contractors with design qualification level and business scope: The contractor must provide relevant design documents 30 days before the commencement of projects requiring secondary design on the premise that the construction period will not be affected.
(2) Name and completion time of plans and statements provided: a. Within 5 days after signing the contract, the contractor shall provide the supervisor and the employer with the total construction schedule in quadruplicate; B, on 25th of each month, report the project progress report (including monthly image progress, project settlement fee and monthly project price list) completed in that month to the supervisor, owner and agent construction unit (as of 20th of that month) and the construction progress plan, quantity plan and capital use plan for next month in quadruplicate.
(3) Undertake the responsibilities and requirements of construction safety and security work and non-night construction lighting: the contractor shall be responsible for all the work and bear all the expenses, and all the consequences arising therefrom shall be borne by the contractor.
(4) Requirements for office and living rooms and facilities provided to the owner: provide 2 on-site office rooms, each of which is 20 square meters, with 4 sets of office tables and chairs, 1 set of filing cabinets; 40 square meters meeting room 1 room, meeting tables and chairs 1 set; There are 2 on-site dormitories, each 20 square meters, each with 4 beds. The above expenses have been included in the total contract price.
(5) Relevant procedures of traffic, sanitation and construction noise management on the construction site that need to be handled by the contractor: The contractor is responsible for handling according to the relevant regulations of XX City, and bears corresponding responsibilities, and its expenses are implemented according to the relevant regulations, which have been included in the total contract price and used as lump sum.
(6) Special requirements and expenses for finished product protection of the completed project: Before the project is handed over to the Employer, the contractor is responsible for protection. During the contractor's protection, if the completed project is damaged, the contractor shall be responsible for repairing it and bear the corresponding expenses; If the Employer uses the completed project that has not been handed over in advance, causing damage to the project, the Contractor shall do a good job of repair in time, and the relevant expenses shall be borne by the Employer.
(7) Requirements and expenses for the protection of underground pipelines and adjacent buildings and structures (including buildings for cultural relics protection) and ancient and famous trees around the construction site: The contractor shall be responsible for protecting the buildings and structures around this project, and this part of expenses shall be included in the contractor's total tender offer. For the protection of underground pipelines and ancient and famous trees around the construction site, the contractor shall submit a protection plan, which shall be well protected after being approved by the engineers and supervision engineers stationed by the Employer. The protection fee shall be borne by the employer after it is approved by the employer. If the damage is caused by the contractor, the repair cost shall be borne by the contractor.
(8) Cleanliness and hygiene requirements of the construction site: The contractor shall ensure that the cleanliness and hygiene of the construction site conform to the relevant regulations and the requirements of civilized construction in XX city, and strictly abide by the management regulations on engineering quality, safety and civilized construction of the comprehensive service building in Automobile City during the construction, so as to achieve safe and civilized construction; In accordance with the provisions, set up car washing slots and other facilities at the entrances and exits of vehicles in the venues; Before the completion of the project, clean up the site to meet the requirements of municipal environmental sanitation and ensure the cleanliness of the construction site. The expenses incurred shall be borne by the contractor, and the losses and fines caused by the contractor's violation of relevant regulations shall be borne by the contractor.
(9) Other work agreed by both parties that the contractor should do:
A, due to the underground pipeline information provided by the employer to the contractor is only provided by the urban construction archives, the contractor shall verify the authenticity of the information, and the contractor shall be responsible for all problems caused by the contractor's failure to verify clearly.
B the contractor shall effectively protect the leveling points, coordinate points and control points provided by the employer. In case of any damage or loss during construction, the Employer shall contact the original lofting unit to re-lofting, and the expenses incurred shall be borne by the Contractor.
C, if necessary, the contractor must cooperate with the construction of power supply, water supply, municipal, cable television, communication, network and other departments.
D, in a timely manner to XX city construction administrative departments to handle the formalities of project construction, to ensure that start on schedule.
E, the contractor must be responsible for coordinating the local relations around, to ensure the smooth completion of the project, all consequences caused by the adjacent relationship shall be borne by the contractor.
First, change work functions, correct service attitude, do a good job in enterprise service and give full play to the role of labor security in line with the principle of "all for the enterprise and all for the enterprise".
Second, change the work style, improve work efficiency, conscientiously implement the responsibility system of first inquiry and one-time notification system, without delay or dispute, and never exceed the time limit for examination and approval, review and handling, so as to ensure that working hours can be handled as needed, and overtime is the default.
Three, strengthen the construction of industry style, the implementation of open government affairs, all fees and standards in strict accordance with the provisions of the collection, and do the fees and standards publicity, and consciously accept the supervision of the masses.
Fourth, strengthen the construction of labor law enforcement team, establish service consciousness, help enterprises solve practical problems, constantly improve the level of administration according to law, consciously safeguard the legitimate rights and interests of enterprises and workers, and provide good development space for enterprises.
Five, labor and social security work should strive to create the best investment environment in the region, provide quality services for attracting investment, and contribute to the construction of a modern new Nankai with outstanding characteristics and strong strength.
6. Publish the contact number and report number (contact number:), accept the supervision of all sectors of society, and severely deal with administrative personnel and law enforcement personnel who violate laws and regulations in labor law enforcement.
Commitment to Safe and Civilized Construction Article 7 Parties:
Our company has the honor of winning the bid to build the project we invested in. In order to realize safe production and civilized construction and ensure the smooth progress of the project, our company and project manager solemnly promise to relevant parties:
1. Conscientiously implement the safety production laws and regulations such as the Construction Law, the Law on Work Safety and the Regulations on the Administration of Work Safety in Construction Projects, adhere to the principle of "safety first, prevention first", establish and improve the safety production management system of enterprises and project departments, and make it run normally and effectively;
Second, set up a project management team in accordance with the regulations, with full-time safety production management personnel, part-time safety officers for each team, and establish a safety production supervision and management network;
Third, the cost of safety and civilized measures paid by the construction unit will all be used for the purchase and update of construction safety protection appliances and facilities, the implementation of safety construction measures and the improvement of safety production conditions, and will never be used for other purposes;
Fourth, strengthen the safety education and training for the operators entering the site. Special operations personnel should hold valid certificates; All operators have received "Level 3" safety education and training, and can only take up their posts after passing the examination;
Five, the implementation of mandatory standards for production safety in engineering construction, strict and comprehensive implementation of the approved construction organization design and special construction scheme and its safety technical measures, and in accordance with the provisions, do a good job of safety technical disclosure;
Six, the company and the project department are in accordance with the provisions, hierarchical implementation of supervision and inspection, timely eliminate all kinds of accidents, and timely report according to the relevant provisions;
Seven, strengthen the civilized construction management of the construction site, educate employees to consciously resist the "four chaos" behavior, the fence, gate, washing table, road hardening, material stacking, building facade, overlay and catering, etc. Meet the requirements of civilization and hygiene;
Eight, accept the supervision of the administrative department of construction and construction, supervision, survey and design and social stakeholders, take seriously the instructions or opinions and suggestions put forward, and eliminate all kinds of hidden dangers in time;
Nine, the occurrence of production safety accidents, in accordance with the provisions of the accident management, timely report to the construction administrative departments, local production safety supervision departments and other relevant departments, and actively cooperate with the accident investigation and handling, and never conceal or delay the report.
The above commitment is the expression of the true consciousness of the enterprise and the project manager. If it is violated, it is willing to accept the punishment given by the relevant parties according to law or regulations.
Letter of Commitment (official seal): _ _ _ _ _ _ _ Project Manager (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Letter of Commitment for Safe and Civilized Construction 8 According to the relevant provisions of the Building Law on environmental protection and safe production, in order to improve and maintain the urban environment of our city and standardize the construction behavior of construction enterprises, our unit has formulated the Letter of Responsibility for Civilized Construction Objectives of Construction Enterprises. Accept the supervision and management of relevant departments, and the main responsibility objectives are as follows:
1 Take measures to control and treat all kinds of dust, waste gas, waste water, solid waste, noise and vibration on the construction site in strict accordance with the provisions of the Building Law on environmental protection and safe production.
2. Formulate the responsibility system and management measures for environmental protection and civilized construction, decompose them layer by layer, and assign the responsibility to people.
3, the construction site should be standardized management. The enclosure on the construction site should be stable and beautiful, and the production and installation specifications of Xiamen should be clear, standardized and in line with the requirements of the city; On-site roads should be hardened and unblocked, and the drainage system should be unimpeded; All kinds of building components, materials and facilities should be neatly stacked; Mechanical equipment should have operating instruction cards; The construction area shall be marked conspicuously, and the prohibition of dangerous areas shall be obvious.
4, site construction should strictly control the dust, waste gas, garbage, sewage emissions and noise; Construction waste must be cleaned up in time and piled up at fixed points.
5. The construction site should be equipped with neat soil cleaning equipment and facilities. Vehicles transporting lime soil and garbage must be covered with tarpaulins, and must not be over-high, overloaded or speeding. When the vehicles leave the site, they must be cleaned, and the wheels must not be stuck with dirt. It is forbidden to throw construction garbage at will.
6, enterprise leaders should regularly check the construction site, and will make a written record of the inspection, in the annual inspection or registration of enterprise qualification, as one of the materials submitted to the Xi Urban and Rural Construction Committee Building Management Office.
7. If the construction site of our unit fails to meet the requirements of the target responsibility book, we are willing to accept the punishment of the Municipal Construction Committee and relevant departments in addition to rectification.
Construction enterprise engineering project department
Legal Representative (Seal) Project Management
Year, month, sun, moon, sun.
Commitment for Safe and Civilized Construction 9 In order to successfully complete the construction task of the sixth bid section (Fengtai No.8 Middle School) of the second batch of 20xx school building safety project, we hereby promise as follows:
Article 1 The construction site shall be fenced neatly, and set up frontage and important parts according to the requirements of the construction unit, and ensure safety and beauty. The content of the construction slogan should be recognized by the construction unit. The site layout is reasonable and tidy, free of weeds, stagnant water and peculiar smell, and the roads in the site must be kept clear; All kinds of materials should be piled up neatly, and construction waste should be piled up at fixed points and removed in time. It is forbidden to pile up materials and garbage outside the construction site.
Article 2 Noise and lighting control should be considered in the layout and process arrangement of the construction site, and it should be strictly implemented in accordance with the relevant regulations of Beijing to avoid disturbing people. Special toilets must be set up on the construction site and managed by special personnel. Do not urinate at will. Life, production waste water and construction waste water are unqualified, and shall not be discharged into the school sewer; Don't destroy the trees and green spaces on campus; In the process of earthwork transportation, the procedures should be strictly followed, and it is not allowed to spill inside and outside the school. At the same time, measures should be taken to avoid dust.
Article 3 Foreign construction personnel must hold relevant certificates, and it is forbidden for non-construction personnel to spend the night at the construction site. It is forbidden to gather people at the construction site to play cards, drink and make trouble, and spread obscene articles. Construction personnel are prohibited from walking around in non-construction areas at will, and conflicts with students and faculty are prohibited.
Article 4 Construction vehicles should pay attention to campus traffic safety when entering and leaving Fengtai No.8 Middle School, and must drive slowly. Large machinery should negotiate with the construction unit in advance to avoid the campus traffic peak. When the road construction must be closed, the consent of the construction unit must be obtained, and obvious warning signs should be set at the intersection.
Article 5 Temporary electricity consumption on the construction site must conform to the Technical Specification for Safety of Temporary Electricity Consumption on the Construction Site. The fixed distribution box should be fenced with obvious safety warning signs. Non-professionals are forbidden to connect and disconnect wires to prevent electric shock accidents. It is forbidden to use electric appliances such as electric furnaces that hinder site safety.
Article 6 Fire fighting equipment such as on-site fire hydrants shall be fully equipped, in a reasonable position, with obvious warning signs, and it is strictly prohibited to misappropriate them to ensure the smooth flow of fire fighting roads; Smoking is strictly prohibited in the construction site, and there must be a special person responsible for the management of toxic, flammable and explosive materials and hot work in construction.
Seventh site construction personnel must dress neatly, wearing badges, it is forbidden to enter the construction site; You must wear a safety helmet (red is the owner's special color) when entering the construction site, and you must fasten your seat belt when working high above the ground. Workers are forbidden to work under the influence of alcohol, climb scaffolding, and throw objects down when working high above the ground.
Article 8 The installation of scaffolding, foundation pit support, tower cranes, elevators and other large-scale machinery must have a construction plan approved by the superior safety department, and all kinds of construction machinery's certificates, inspection certificates and safety protection devices are complete, so as to prevent all construction safety accidents such as falling objects and earth collapse.
Article 9 The staff canteen must be clean and tidy, free of flies and rats, with complete licenses for operators, and conscientiously implement the relevant provisions on food hygiene and safety to prevent food poisoning for staff; The dormitory of construction personnel should be clean and tidy, and it is forbidden to pull wires at will to keep warm in winter to prevent workers from gas poisoning.
Article 10 The construction unit shall have management personnel specially responsible for on-site safe and civilized construction, who shall conduct regular inspections and make timely rectification when problems are found; Other issues related to safe and civilized construction put forward by the construction unit must be actively cooperated and seriously implemented.
If there is any violation of the above terms, our unit is willing to accept any punishment from the project department and bear all civil or criminal responsibilities arising therefrom.
Commitment unit:
Person in charge of the unit (signature):
Date: